Invitation To Bid ( ITB, Tender Notice)

Civil Works

    Watching  
Project Contractor selection plan Tender notice Bid award
Find: 07:56 18/06/2019
Notify Area
Civil Works
Name of project
Consolidation, preservation, and anti-degradation of Bodhi School relics
Name of Tender Notice
Civil Works
Bid Solicitor
Ban Quản lý di tích tỉnh Quảng Trị
Funding source
Sponsored by Bao Viet Group
Range
Outside the scope of the Law on Bidding
Contractor selection methods
Competitive Offer
Contract Execution location
Related announcements
Time of bid closing
08:30 01/10/2018

Main content

Scope of work of the package:

* Anti-degradation:.

- Using reinforced concrete single foundation (BTCT) structure with durability grade B20 ( M250). I-reinforced (KT) size 150x75x5x7mm combined with I-shaped steel beam system KT 100x50x5x7mm to support beam, floor and wall structures at risk of collapse. Steel using grade CCT34 with strength f = 210MPa, fu = 340MPa, connected by bolts of strength grade B5.6 co Fvb = 190MPa, Ftb=210Mpa.

* Portable storage roof area:.

- Scale: Building a roof house with an area of ​​630m2, 10.96m high.

- Structural solution: Single foundation structure with durable reinforced concrete B20. The body uses a truss frame system, a welded combination from CCT34 steel plate with a thickness of 10 ÷ 12mm; bolted with strength grade B8.8 co Fvb = 320MPa, Ftb=400Mpa.

- Complete solution: 0.56m thick Lysaght Trimdex corrugated iron roof on high strength steel purlin system Lysaght Z250x3m, with plastic-coated steel storm protection, 0.55mm thick corrugated iron gutter.

- Power supply solution: The power source is connected to the area's power supply system to the main switchboard by 2x16mm2 CU/XLPE/PVC/DSTA/PVC cables underground in the cable trench. From the main electrical cabinet to the indoor lighting system using Cadivi 2x1.5mm2 and 2x4mm2 cables; lighting by led light system.

- Lightning protection solution: Using the INGESCO PDC2.1 pioneer lightning rod with a protective radius of 57m to prevent lightning for the entire building. Lightning conductor with bare copper wire D95mm2 is welded and connected to the copper-clad steel grounding pile D16, 2.4m long; grounding using bare copper wire D70.mm2

- Fire prevention and fighting solutions: Using a fire extinguisher box with a 4kg MFZ4 hand-held fire extinguisher and a 3kg MT3 CO2 tank.

* Relic protection fence:

- Gate, open fence combined with flower beds arranged 3 relic facades are denoted by points G-F-E-D-C-B length 88, 34m; Gate pillar KT0.5x0.6x2.4m, surface covered with granite; The foot of the fence and the flower bed is 0.3m high, with inax tiles on the outside. Gates, fence bars with a combination of galvanized steel box KT40x40x1.8mm and KT40x80x1.8mm.

- Solid fence on the back of the relic section A-B 41.48m long: The foundation, columns, and braces are reinforced with reinforced concrete of grade B20. Fence made of solid brick VXM M75
22÷30cm thick, 2.4m high, the entire fence is painted in 03 countries combined with decorative inax tiles.

* The yard background around the monument. :

- The yard floor surrounding the relic has an area of ​​409m2, including layers: KT800x800mm granite tiles; concrete layer 20x40mm, durability grade B12.5 (M150), 120mm thick; layer of sand to create flat.

- The garden floor next to the house and the entrance hall with an area of ​​​​335.5m2 includes layers: Thanh Hoa green stone layer KT400x400mm, 50mm thick; stone concrete layer 20x40mm, durability level 12.5, 120mm thick; flat sand layer.

- The pavement floor has an area of ​​175.3m2 including the following layers: KT400x400mm terrazzo tile; stone concrete layer 20x40mm, durability level 12.5, 120mm thick; sand layer to create flat.

* Sightseeing platform: Area 78m2, height 3.6m, design solutions are as follows: Single foundation structure, reinforced concrete double foundation with durability grade B20. The body uses I-shaped steel columns KT150x150x7x10mm, I-beam steel beams KT200x150x6x9mm, I-beam steel beams KT150x100x6x9mm, ConWood KT105x30x2200mm plastic laminate flooring. Steel uses type CCT34, connected by bolts of grade B5.6 with Fvb = 190Mpa, Ftb = 210Mpa.

* Sightseeing guide corridor: Area 30.6m2, height 3.1m, design solutions are as follows: Single foundation reinforced concrete foundation with durability grade B20 combined with column frame system made of box steel complex KT30x60x1 ,5mm and KT50x100x2.4mm; roof mounted steel box KT50x100x2.4mm about 100mm.

* Toilet: Area 5.1m2, located under the stairs of the sightseeing corridor; Surrounded by ConWood plastic wood panels, galvanized steel box frame system KT30x60x2.4mm.

* Technical infrastructure system:

- Overall drainage: Construction drainage ditch length 69m, clearance size 0.38x0.52m and 12 manholes KT 0.8x0.8x1.1m design solutions are as follows: Concrete bottom 40x60mm, durability level B3.5 (M50) ), 10cm thick; VXM M75 block wall, 12cm thick; bracing, knitting and knitting the cap of reinforced concrete casting with durability grade B15.

- Overall lighting: Lighting with floodlights and reflectors.

Participating in tenders

Bidding method
Direct
Tender documents start selling in
08:30 24/09/2018
to
08:30 01/10/2018
Tender Document Submission at
To view full information, please Login or Register
Document Submission Fees

Utilities for you

Bidding information tracking
The Bid Tracking function helps you to quickly and promptly receive email notifications of changes to your bid package "Civil Works". In addition, you will also receive notification of bidding results and contractor selection results when the results are posted to the system.
Receive similar invitation to bid by email
To be one of the first to be emailed to tender notices of similar packages: "Civil Works" as soon as they are posted, sign up for DauThau.info's VIP 5 package .

Bidding cost calculator

Costs related to contractors when conducting bidding on public procurement (Article 12 of Decree 24/2024/ND-CP)

Cost type Calculation formula Applicable fees (VND)
Annual account maintenance cost
Bid submission cost
Bid submission cost
Bid winning cost
Electronic bid bond connection cost
Total estimated cost

To view bid costs

You need to Login or Register to view the bidding cost.
Support and Error reporting
Support
What support do you need?
Reporting
Is there an error in the data on the page? You will be rewarded if you discover that the bidding package and KHLCNT have not met the online bidding regulations but DauThau.info does not warn or warns incorrectly.
Views: 107

You did not use the site, Click here to remain logged. Timeout: 60 second