Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
-- You will be rewarded if you detect false warnings! See instructions here!
Package TN-W-05D: Construction of Huong Thuong - Chua Hang street. Road part - Section 3 (section from Km4+680 to Km5+750.23) belongs to the Dynamic Urban Integrated Development - Thai Nguyen City project.
1. Investment scale of Huong Thuong Chua Hang route:
- The first point intersects the North-South road - Huong Thuong bridge, the end point is at Chua Hang round island, the total length is 5,750.23 m.
- Width of cross section: 24.5 m, road surface width 14.5 m, pavement 7.5+2.0m, median strip 0.5m.
- Pavement structure: high grade A1, Eyc=155MPa. Consists of the following layers:
+ Hot asphalt concrete, tight 12.5 5cm thick.
+ Watering with standard adhesive resin 0.5 Kg/m2.
+ Hot asphalt concrete, tight 19.0, 7cm thick.
+ Standard permeable asphalt watering: 1.0 Kg/m2.
+ Grade 1 crushed stone 18cm thick.
+ Grade 2 crushed stone 34cm thick.
- The embankment is compacted K95. Particularly 30cm below the pavement structure is compacted K98. We accumulate 1/1,5.
- Sidewalk: Designed to pave tezzaro tiles on the 8cm thick BTXM 12Mpa foundation. The sidewalk (finishing side) is paved with 4.0m wide tezzaro tiles (to the outer edge of the technical trench), the rest is to wait for the connection of technical infrastructure works of residential areas on both sides of the road to finish paving the entire size. sidewalk.
- Drainage of rainwater along the route: At this stage, only the culvert system will be designed along the sidewalk on the left side of the route (complete the pavement size 7.5m); Vertical sluices use prefabricated reinforced concrete sluices D800 ÷ D1500 placed under the sidewalk to collect surface water through the reinforced concrete manhole system, discharge to horizontal culverts on the route.
- Drainage across the road and return horizontal sluices: Design of road sluices and horizontal sluices to return water to the horizontal ditch system on the route by round culverts D1250, D1500, box culverts BxH=( 1.0x1,0)m, BxH=(1.5x2.0)m, BxH=(2,0x2.0)m, BxH=(4,0x3.0)m, 2xBxH= 2x(2.5x3.0) )m.
- Wastewater drainage: At this stage, only the wastewater drainage system will be designed using D400 culvert for the intersection at the beginning of the route and the intersection at the end of the route. Drainage direction is temporarily connected to the storm water drainage system.
- Technical trench: Design of reinforced concrete technical trench with aperture BxH=(1,4x1,5)m within the intersection at the beginning of the route, at the intersection at the end of the route and on the sidewalk on the left side of the road. Along the length of the trench, a reinforced concrete manhole is arranged with an average distance of 100m/hole for connection and maintenance work. Design 05 horizontal tunnels BxH = (2.0x2.0)m at the first and last intersections serving the connection of technical infrastructure works.
- Trees, landscape: Design to plant shade trees on the left side of the summer. Average distance 12m/tree, using Christmas tree, Black Star, Muong Hoang Yen (Osaka yellow). On the traffic island, shrubs and flowers are planted to create a landscape.
- On the road and on the path leading to the bridge: arrange light poles with a height of 10m, opposite the two sides of the road with a distance between them. average 33m/column. Lights need to reach 1.5m to install LED-100W street lights.
- Lighting on the bridge: arrange light poles 10m high on both sides of the bridge and barricades with approx. 32m/column distance. Need a light to reach 1.5m to install a 100W LED street light kit.
- On the route there is 01 bridge over Mo Linh stream (Mo Linh bridge 1), starting at Km4+159.94m.
- Bridge span diagram: (18+3x33+18 )m, the conical beam is extended. The length of the bridge to the end of the abutment: L = 158.665m, the length of the retaining wall on the Huong Thuong side is 129,985m, the Hang Chua side is 151,054m.
- Bridge gauge B=18.5m.
2. Bid security: VND 770,000,000.
3. Bidding price: 2,000,000 VND
Costs related to contractors when conducting bidding on public procurement (Article 12 of Decree 24/2024/ND-CP)
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects
Are you sure you want to download cargo data? If yes, please wait for the system for a moment, so that the system can download the data to your device!
No goods data
Are you sure you want to download the construction equipment data? If yes, please wait a moment while the system processes your request and downloads the data to your device.
Similar goods purchased by Investor Ban quản lý dự án Phát triển tổng hợp đô thì động lực thành phố Thái Nguyên:
No similar goods purchased by the Investor were found.
Similar goods purchased by other Investor excluding Ban quản lý dự án Phát triển tổng hợp đô thì động lực thành phố Thái Nguyên:
No similar goods have been found that other Investor have purchased.
Similar goods for which the bidding results of the Ministry of Health have been announced:
No similar goods have been found in the bidding results of the Ministry of Health.