Invitation To Bid ( ITB, Tender Notice)

Construction of Huong Thuong street - Hang Pagoda. Road part - Segment 3 (from Km4+680 to Km5+750.23)

Find: 10:25 10/03/2020
Notify Area
Civil Works
Name of project
Integrated development of dynamic urban - Thai Nguyen city
Name of Tender Notice
Construction of Huong Thuong street - Hang Pagoda. Road part - Segment 3 (from Km4+680 to Km5+750.23)
Contractor Selection Plan ID
Name of Contractor selection plan
Plan for selecting contractor for the Dynamic Urban Integrated Development Project - Thai Nguyen City
Funding source
ODA funded by World Bank 90%, Budget 10%
Range
Outside the scope of the Law on Bidding
Contractor selection methods
Competitive Bidding
Contract Execution location
Time of bid closing
15:00 16/03/2020
AI-classified field

Main content

Package TN-W-05D: Construction of Huong Thuong - Chua Hang street. Road part - Section 3 (section from Km4+680 to Km5+750.23) belongs to the Dynamic Urban Integrated Development - Thai Nguyen City project.

1. Investment scale of Huong Thuong Chua Hang route:

- The first point intersects the North-South road - Huong Thuong bridge, the end point is at Chua Hang round island, the total length is 5,750.23 m.

- Width of cross section: 24.5 m, road surface width 14.5 m, pavement 7.5+2.0m, median strip 0.5m.

- Pavement structure: high grade A1, Eyc=155MPa. Consists of the following layers:

+ Hot asphalt concrete, tight 12.5 5cm thick.

+ Watering with standard adhesive resin 0.5 Kg/m2.

+ Hot asphalt concrete, tight 19.0, 7cm thick.

+ Standard permeable asphalt watering: 1.0 Kg/m2.

+ Grade 1 crushed stone 18cm thick.

+ Grade 2 crushed stone 34cm thick.

- The embankment is compacted K95. Particularly 30cm below the pavement structure is compacted K98. We accumulate 1/1,5.

- Sidewalk: Designed to pave tezzaro tiles on the 8cm thick BTXM 12Mpa foundation. The sidewalk (finishing side) is paved with 4.0m wide tezzaro tiles (to the outer edge of the technical trench), the rest is to wait for the connection of technical infrastructure works of residential areas on both sides of the road to finish paving the entire size. sidewalk.

- Drainage of rainwater along the route: At this stage, only the culvert system will be designed along the sidewalk on the left side of the route (complete the pavement size 7.5m); Vertical sluices use prefabricated reinforced concrete sluices D800 ÷ D1500 placed under the sidewalk to collect surface water through the reinforced concrete manhole system, discharge to horizontal culverts on the route.

- Drainage across the road and return horizontal sluices: Design of road sluices and horizontal sluices to return water to the horizontal ditch system on the route by round culverts D1250, D1500, box culverts BxH=( 1.0x1,0)m, BxH=(1.5x2.0)m, BxH=(2,0x2.0)m, BxH=(4,0x3.0)m, 2xBxH= 2x(2.5x3.0) )m.

- Wastewater drainage: At this stage, only the wastewater drainage system will be designed using D400 culvert for the intersection at the beginning of the route and the intersection at the end of the route. Drainage direction is temporarily connected to the storm water drainage system.

- Technical trench: Design of reinforced concrete technical trench with aperture BxH=(1,4x1,5)m within the intersection at the beginning of the route, at the intersection at the end of the route and on the sidewalk on the left side of the road. Along the length of the trench, a reinforced concrete manhole is arranged with an average distance of 100m/hole for connection and maintenance work. Design 05 horizontal tunnels BxH = (2.0x2.0)m at the first and last intersections serving the connection of technical infrastructure works.

- Trees, landscape: Design to plant shade trees on the left side of the summer. Average distance 12m/tree, using Christmas tree, Black Star, Muong Hoang Yen (Osaka yellow). On the traffic island, shrubs and flowers are planted to create a landscape.

- On the road and on the path leading to the bridge: arrange light poles with a height of 10m, opposite the two sides of the road with a distance between them. average 33m/column. Lights need to reach 1.5m to install LED-100W street lights.

- Lighting on the bridge: arrange light poles 10m high on both sides of the bridge and barricades with approx. 32m/column distance. Need a light to reach 1.5m to install a 100W LED street light kit.

- On the route there is 01 bridge over Mo Linh stream (Mo Linh bridge 1), starting at Km4+159.94m.

- Bridge span diagram: (18+3x33+18 )m, the conical beam is extended. The length of the bridge to the end of the abutment: L = 158.665m, the length of the retaining wall on the Huong Thuong side is 129,985m, the Hang Chua side is 151,054m.

- Bridge gauge B=18.5m.

2. Bid security: VND 770,000,000.

3. Bidding price: 2,000,000 VND

Participating in tenders

Bidding method
Online
Tender documents start selling in
08:00 14/02/2020
to
15:00 16/03/2020
Tender Document Submission at
To view full information, please Login or Register
Document Submission Fees

Bid award

Award date
Price Tender value
The estimate of the bidding package is not published in the Tender Notice (including the Tender Notice published in the bidding newspaper and the Tender Notice published in the public procurement system/national procurement network). Only DauThau.info has the exclusive feature of "scanning" the bid package price. To check the exact price of the software package, please register for one of the VIP software packages (VIP1, VIP2, VIP3...) .
Bid Opening Result
No results. Upgrade to a VIP1 account to receive email notifications as soon as the results are posted.
Bid award
See details here . If you want to receive automatic contractor selection results via email, please upgrade your VIP1 account .

Utilities for you

Bidding information tracking
The Bid Tracking function helps you to quickly and promptly receive email notifications of changes to your bid package "Construction of Huong Thuong street - Hang Pagoda. Road part - Segment 3 (from Km4+680 to Km5+750.23)". In addition, you will also receive notification of bidding results and contractor selection results when the results are posted to the system.
Receive similar invitation to bid by email
To be one of the first to be emailed to tender notices of similar packages: "Construction of Huong Thuong street - Hang Pagoda. Road part - Segment 3 (from Km4+680 to Km5+750.23)" as soon as they are posted, sign up for DauThau.info's VIP 5 package .

Bidding cost calculator

Costs related to contractors when conducting bidding on public procurement (Article 12 of Decree 24/2024/ND-CP)

Cost type Calculation formula Applicable fees (VND)
Annual account maintenance cost
Bid submission cost
Bid submission cost
Bid winning cost
Electronic bid bond connection cost
Total estimated cost

To view bid costs

You need to Login or Register to view the bidding cost.
Support and Error reporting
Support
What support do you need?
Reporting
Is there an error in the data on the page? You will be rewarded if you discover that the bidding package and KHLCNT have not met the online bidding regulations but DauThau.info does not warn or warns incorrectly.
Views: 596

You did not use the site, Click here to remain logged. Timeout: 60 second