Invitation To Bid ( ITB, Tender Notice)

Package 5 (C1-QN-GD2-CS3): Survey consultancy, construction drawing design and cost estimate

Find: 11:26 13/10/2020
Procurement Category
Consulting
Name of project
Subproject on Repairing and Improving Dam Safety in Quang Ngai Province (phase 2) under the Dam Safety Improvement and Repair Project (WB8)
Name of Tender Notice
Package 5 (C1-QN-GD2-CS3): Survey consultancy, construction drawing design and cost estimate
Contractor Selection Plan ID
Name of Contractor selection plan
Contractor selection plan for the project implementation phase of the Quang Ngai Province Dam Repair and Safety Improvement Sub-Project (phase 2)
Funding source
World Bank
Range
Outside the scope of the Law on Bidding
Contract Period
To view full information, please Login or Register
Contractor selection methods
Competency-Based Selection (CQS) D33
Contract Execution Location
Time of bid closing
14:30 02/11/2020

Main content

INVITATION FOR INTEREST US

Country name: Vietnam

Name of Subproject: Repair and improve safety of dams in Quang Ngai province (phase 2) under the Project on Repair and Improvement of Dam Safety (WB8).

Loan No.: CR.5749-VN.

Name of assignment: Survey consultant, construction drawing design and cost estimate.

Reference number: Package No. 5 (C1-QN-GD2-CS3).

The Government of the Socialist Republic of Vietnam has received Credit No. CR.5749-VN from the International Development Association IDA (World Bank/WB) to finance the Dam Safety Improvement and Repair Project/VN- DRASIP/WB8, and intends to use part of the funds to cover the eligible costs of this consulting service. Description of the subproject and consulting services are as follows:

1. The Quang Ngai Province Dam Repair and Safety Improvement Subproject (phase 2) under the Dam Safety Improvement and Repair Project (WB8) includes: Repairing and improving safety 08 colonial reservoirs Binh Son, Son Tinh and Duc Pho townships, Quang Ngai province.

2. Sub-projects to be implemented: 2018 -:- 2022.

3. The main goals and tasks of the service will be accomplished through the following related tasks:

3.1. The main objective of the service: Consulting survey, design construction drawings and cost estimates to fully show technical parameters, materials used and structural details in accordance with standards and technical regulations. applied techniques and detailed and complete cost estimates, ensuring sufficient conditions for the construction of works.

3.2. Main tasks of the service: Carry out surveys, design construction drawings and estimate for 08 reservoirs, of which Tuyen Tung Reservoir: The spillway is in the middle, the 2nd part is on the right bank, the left side of the dam is not. allow spillway, side wall downstream of the dam, management house, construction road combined with management; 07 water reservoirs: Earth dam, flood spillway, water intake culvert, road construction combined with management, management house, Son Rai lake alone does not build a management house.

4. Quang Ngai Province Dam Repair and Safety Improvement Project Management Board invites qualified consultants to express their interest in the above consulting services. Interested Consultants must provide information showing that they have the relevant qualifications and experience to perform the services.

Interested consultants should pay attention to paragraph 1.9 of the WB's Guide to Selection and Hiring of Consultants in IBRD Loans and IDA Credits & Grants to Bank Borrowers The World was published in January 2011, stipulating in the WB's policy when there is a conflict of interest.

5. Consultants may associate with other consulting units in the form of joint ventures, joint ventures, or subcontractors to enhance the consultant's capacity.

6. Consultants are selected according to the method of selection on the basis of the consultant's competence (CQS), specified in the WB's Consultant Guidelines.

7. Dossier of interest must be sent in hard copy and written form in Vietnamese (01 original and 04 copies) to the following address (delivered by mail, by fax) to the address listed below. here at or before 09:00, (Hanoi time) October 28, 2020.

8. Eligible interested bidders may obtain further information and request for EOI at the address below between 2:00 p.m. (Hanoi time), October 13. 2020 to before 09:00 (Hanoi time), October 28, 2020 (during office hours).

Project Management Board for Repairing and Improving Safety of Dams in Quang Ngai Province

Address: 3rd floor, No. 182 Hung Vuong street, Quang Ngai city, Quang Ngai province

Phone number: 84.0255.3816869-3826869

Fax: 84.0255.3735745

Email: [email protected]

Participating in tenders

Bidding method
Direct
Tender documents start selling in
14:00 13/10/2020
to
14:30 02/11/2020
Tender Document Submission at
To view full information, please Login or Register
Document Submission Fees

Bid award

Award date
Price Tender value
The estimate of the bidding package is not published in the Tender Notice (including the Tender Notice published in the bidding newspaper and the Tender Notice published in the public procurement system/national procurement network). Only DauThau.info has the exclusive feature of "scanning" the bid package price. To check the exact price of the software package, please register for one of the VIP software packages (VIP1, VIP2, VIP3...) .
Estimated Tender value
Bid Opening Result
No results. Upgrade to a VIP1 account to receive email notifications as soon as the results are posted.
Bid award
See details here . If you want to receive automatic contractor selection results via email, please upgrade your VIP1 account .

Bidding documents

Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent.
To download, please Login or Register

Bidding party analysis

Data analysis results of DauThau.info software for bid solicitors Ban Quản lý dự án Sửa chữa và nâng cao an toàn đập tỉnh Quảng Ngãi as follows:

  • Has relationships with 40 contractor.
  • The average number of contractors participating in each bidding package is: 2.80 contractors.
  • Proportion of bidding fields: Goods 0.00%, Construction 27.59%, Consulting 55.17%, Non-consulting 10.34%, Mixed 0.00%, Other 6.9%.
  • The total value according to the bidding package with valid IMP is: 372,342,600,000 VND, in which the total winning value is: 335,872,683,188 VND.
  • The savings rate is: 9.79%.
DauThau.info software reads from national bidding database

Utilities for you

Bidding information tracking
The Bid Tracking function helps you to quickly and promptly receive email notifications of changes to your bid package "Package 5 (C1-QN-GD2-CS3): Survey consultancy, construction drawing design and cost estimate". In addition, you will also receive notification of bidding results and contractor selection results when the results are posted to the system.
Receive similar invitation to bid by email
To be one of the first to be emailed to tender notices of similar packages: "Package 5 (C1-QN-GD2-CS3): Survey consultancy, construction drawing design and cost estimate" as soon as they are posted, sign up for DauThau.info's VIP 5 package .

Support and Error reporting

Support
What support do you need?
Reporting
Is there an error in the data on the page? You will be rewarded if you discover that the bidding package and KHLCNT have not met the online bidding regulations but DauThau.info does not warn or warns incorrectly.
Views: 167

You did not use the site, Click here to remain logged. Timeout: 60 second