Invitation To Bid ( ITB, Tender Notice)

Tender package No 14: Construction, supply and installation of construction equipment

    Watching    
Project Contractor selection plan Tender notice Bid Opening Result Bid award
Find: 20:57 10/01/2026
Notice Status
Published
Public procurement field
Civil Works
Name of project
Component project 2: Road passing through Song Khoai Industrial Park to complete the entire connection route from Ha Long - Hai Phong expressway to Dong Trieu
Bidding package name
Tender package No 14: Construction, supply and installation of construction equipment
Contractor Selection Plan ID
Name of Contractor selection plan
Contractor selection plan for the bidding package to be implemented after project approval (Phase 5) Component project 2: Road passing through Song Khoai Industrial Park to complete the entire connection route from Ha Long - Hai Phong expressway to Dong Trieu
Spending category
Investment and Development Spending
Domestic/ International
Domestic
Capital source details
Provincial budget
Range
Within the scope of the Law on Bidding
Contractor selection method
Single Stage Single Envelope
Contract Type
Fixed unit price
Contract Period
To view full information, please Login or Register
Contractor selection methods
Open bidding
Contract Execution location
- Phường Đông Mai, Province/City Quảng Ninh
- Phường Hiệp Hòa
Related announcements
Time of bid closing
09:00 21/01/2026
Validity of bid documents
60 days
Approval ID
17/QĐ-BKVI
Approval date
10/01/2026 20:56
Approval Authority
Ban Quản lý dự án đầu tư xây dựng khu vực I tỉnh Quảng Ninh
Approval Documents

Bidding documents on the Public Procurement System may be infected with viruses or errors, some files require computers using Windows operating systems and need to install Client Agent software (Linux and MacOS operating systems cannot install Client software) to be able to download. Using DauThau.info software, you can check all the above problems as well as preview the total size of the bidding documents to prevent missing files from downloading.
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files. To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611

Participating in tenders

Bidding form
Online
Tender documents submission start from
20:56 10/01/2026
to
09:00 21/01/2026
Document Submission Fees
330.000 VND
Location for receiving E-Bids
To view full information, please Login or Register

Bid award

Bid opening time
09:00 21/01/2026
Bid opening location
https://muasamcong.mpi.gov.vn
Price Tender value
To view full information, please Login or Register
Amount in text format
To view full information, please Login or Register
Estimated Tender value
To view full information, please Login or Register
Amount in text format
To view full information, please Login or Register
Bid Opening Result
No results. Upgrade to a VIP1 account to receive email notifications as soon as the results are posted.
Bid award
No results. Upgrade to a VIP1 account to receive email notifications as soon as the results are posted.

Bid Security

Notice type
Guarantee letter or guarantee insurance certificate
Bid security amount
21.434.000.000 VND
Amount in words
Twenty one billion four hundred thirty four million dong

Tender Invitation Information

Bidding documents on the Public Procurement System may be infected with viruses or errors, some files require computers using Windows operating systems and need to install Client Agent software (Linux and MacOS operating systems cannot install Client software) to be able to download. Using DauThau.info software, you can check all the above problems as well as preview the total size of the bidding documents to prevent missing files from downloading.
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611

List of consulting units who have participated in the package

# Unit name Role Address
1 Công ty cổ phần xây dựng và tư vấn giao thông Quảng Ninh Technical design consultancy, construction drawing design (for two -step design works), estimates Tổ 5, khu 1, phường Bãi Cháy, tỉnh Quảng Ninh
2 Công ty cổ phần tư vấn xây dựng và quy hoạch hạ tầng Quảng Ninh Consulting on technical design verification, construction drawing design (for two -step design works), estimates Số 151 phố Khâm Thiện, phường Văn Miếu – Quốc Tử Giám, thành phố Hà Nội
3 VIET NAM VALUATION AND INVESTMENT CONSULTANCY JOINT STOCK COMPANY Valuation consulting Số 5, ngõ 111/11, đường Thụy Phương, phường Đông Ngạc, thành phố Hà Nội
4 QUANG NINH TRAFFIC CONSULTANCY JOINT STOCK COMPANY Consulting on creating construction drawing design - joint venture contractor Tổ 5, khu 1, đường Cái Lân, phường Bãi Cháy, tỉnh Quảng Ninh
5 GEO HALONG JOINT STOCK COMPANY Consulting on creating construction drawing design - joint venture contractor Tổ 2, khu 1, phường Bãi Cháy, tỉnh Quảng Ninh
6 Công ty cổ phần thương mại và xây lắp điện Quảng Ninh Consulting on creating construction drawing design - joint venture contractor Số nhà 45, tổ 6, khu 3, phường Hạ Long, tỉnh Quảng Ninh

Requirements for main construction equipment

Number Type of device and device characteristics Minimum quantity required
1
Máy đào, dung tích gầu ≥ 1.25m3
5
2
Máy ủi ≥ 110CV
5
3
Máy rải cấp phối đá dăm
2
4
Máy rải bê tông nhựa
2
5
Lu rung ≥ 16T
6
6
Lu bánh lốp ≥ 16T
3
7
Lu bánh thép ≥ 8T
3
8
Ô tô tưới nhựa hoặc máy tưới nhựa
1
9
Ô tô tự đổ ≥ 7 tấn
10
10
Máy khoan cọc nhồi
2
11
Máy khoan cọc xi măng đất
1
12
Phòng thí nghiệm chuyên ngành xây dựng được công nhận
1

List of construction items:

Form No. 01B. Bill of Quantities:

Number Job Description Bidding Amount Calculation Unit Technical requirements/Main technical instructions Note
1
Ống nhựa HDPE D65/50
7.58
100m
Theo quy định tại Chương V
2
Gỗ dán chèn khe dày 5mm
0.5753
m3
Theo quy định tại Chương V
3
Ván khuôn gờ lan can
22.0505
100m2
Theo quy định tại Chương V
4
SX thép tấm mạ kẽm
0.6029
tấn
Theo quy định tại Chương V
5
Mạ kẽm
0.6029
tấn
Theo quy định tại Chương V
6
Lắp dựng thép tấm
0.6029
tấn
Theo quy định tại Chương V
7
Tay vịn mạ kẽm
Theo quy định tại Chương V
8
Thép ống mạ kẽm
15.5131
tấn
Theo quy định tại Chương V
9
Thép hộp mạ kẽm
14.6087
tấn
Theo quy định tại Chương V
10
THép bản mạ kẽm
22.9031
tấn
Theo quy định tại Chương V
11
Bu lông M16
6048
cái
Theo quy định tại Chương V
12
Bu lông M22 L=650
1512
cái
Theo quy định tại Chương V
13
Gia công lan can thép
53.0248
tấn
Theo quy định tại Chương V
14
Lắp dựng lan can
53.0248
tấn
Theo quy định tại Chương V
15
Khe co giãn răng lược ( dạng neo)
Theo quy định tại Chương V
16
Cốt thép khe co giãn
2.5949
tấn
Theo quy định tại Chương V
17
Vữa không co ngót sikagrout 214-11
8.835
m3
Theo quy định tại Chương V
18
Bê tông không co ngót C50
18.1118
m3
Theo quy định tại Chương V
19
Khe co giãn kiểu răng lược 100mm
116.4
m
Theo quy định tại Chương V
20
Thoát nước mặt cầu
Theo quy định tại Chương V
21
ống thoát nước gang D162, L=0.23m
26
cái
Theo quy định tại Chương V
22
ống thoát nước gang D162, L=0.5m
48
cái
Theo quy định tại Chương V
23
Năp đậy làm bằng gang D220
74
cái
Theo quy định tại Chương V
24
Phếu thu, cổ đõì làm bằng gang D239
74
cái
Theo quy định tại Chương V
25
Lắp đặt ống nhựa đường kính ống 160mm
0.768
100m
Theo quy định tại Chương V
26
Lắp đặt ống nhựa đường kính ống 225m
3.1192
100m
Theo quy định tại Chương V
27
Bu lông M12, L=40
264
bộ
Theo quy định tại Chương V
28
Cút nối T1 (D225)
26
cái
Theo quy định tại Chương V
29
Cút nối T3 (D225)
12
cái
Theo quy định tại Chương V
30
Ống nối cao su (D225)
8
cái
Theo quy định tại Chương V
31
Bịt đầu cút nối D225
24
cái
Theo quy định tại Chương V
32
Sản xuất thép bản mạ kẽm
1.3605
tấn
Theo quy định tại Chương V
33
Lắp đặt thép bản
1.3605
tấn
Theo quy định tại Chương V
34
Bệ đỡ cột đèn
Theo quy định tại Chương V
35
Cốt thép bệ đỡ đk cốt thép <= 18mm
0.6779
tấn
Theo quy định tại Chương V
36
Hộp kỹ thuật 200x200x200mm
22
bộ
Theo quy định tại Chương V
37
SX thép tấm mạ kẽm
0.0277
tấn
Theo quy định tại Chương V
38
Lắp dựng thép tấm
0.0277
tấn
Theo quy định tại Chương V
39
Bê tông móng bệ đúc,C30
4.3725
m3
Theo quy định tại Chương V
40
Ván khuôn bệ đỡ
0.1573
100m2
Theo quy định tại Chương V
41
Bu lông neo M24
88
bộ
Theo quy định tại Chương V
42
Lắp đặt ống nhựa xoắn đường kính ống 30mm
0.1474
100m
Theo quy định tại Chương V
43
Ống thép mạ kẽm D150 dày 6mm
2.6843
100m
Theo quy định tại Chương V
44
Neo dầm
Theo quy định tại Chương V
45
Chốt thép D60 (CB240-T) mạ kẽm
4.7942
tấn
Theo quy định tại Chương V
46
Sản xuất tấm thép bản
1.0297
tấn
Theo quy định tại Chương V
47
Lắp đặt tấm thép bản
1.0297
tấn
Theo quy định tại Chương V
48
Bi tim chèn khe
0.0272
m3
Theo quy định tại Chương V
49
Gối cầu
Theo quy định tại Chương V
50
Gối chậu loại A, ULS=1875kN, dọc ±50mm, ngang ±10mm
72
cái
Theo quy định tại Chương V

Utilities for you

Bidding information tracking
The Bid Tracking function helps you to quickly and promptly receive email notifications of changes to your bid package "Tender package No 14: Construction, supply and installation of construction equipment". In addition, you will also receive notification of bidding results and contractor selection results when the results are posted to the system.
Receive similar invitation to bid by email
To be one of the first to be emailed to tender notices of similar packages: "Tender package No 14: Construction, supply and installation of construction equipment" as soon as they are posted, sign up for DauThau.info's VIP 1 package .

Bidding cost calculator

Costs related to contractors when conducting bidding on public procurement (Article 12 of Decree 24/2024/ND-CP)

Cost type Calculation formula Applicable fees (VND)
Annual account maintenance cost
Bid submission cost
Bid submission cost
Bid winning cost
Electronic bid bond connection cost
Total estimated cost

To view bid costs

You need to Login or Register to view the bidding cost.
Support and Error reporting
Support
What support do you need?
Reporting
Is there an error in the data on the page? You will be rewarded if you discover that the bidding package and KHLCNT have not met the online bidding regulations but DauThau.info does not warn or warns incorrectly.
Views: 4

You did not use the site, Click here to remain logged. Timeout: 60 second