Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
-- You will be rewarded if you detect false warnings! See instructions here!
Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent. To download, please Login or Register
Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent.
To download, please Login or Register
Number | Category | Amount | Calculation Unit | Description | Execution location | since date | The latest delivery date | Note |
---|---|---|---|---|---|---|---|---|
1 | Nhập khẩu, bảo quản, phân phối, điều chuyển bao cao su (dự kiến 21.902.400 chiếc) giai đoạn 2024-2026. | 1 | Dịch vụ | Theo quy định tại Chương V | ||||
2 | Nhập khẩu, bảo quản, phân phối, điều chuyển sinh phẩm xét nghiệm nhanh HIV (dự kiến 1.253.725 test) giai đoạn 2024-2026. | 1 | Dịch vụ | Theo quy định tại Chương V | Dịch vụ cung cấp đến 34 tỉnh/thành phố thuộc dự án hoặc theo yêu cầu của BQLDA | 30 tháng kể từ ngày hợp đồng có hiệu lực |
Data analysis results of DauThau.info software for bid solicitors Ban Quản lý các dự án hỗ trợ phòng, chống HIV/AIDS as follows:
- Has relationships with 37 contractor.
- The average number of contractors participating in each bidding package is: 2.45 contractors.
- Proportion of bidding fields: Goods 54.55%, Construction 0%, Consulting 4.55%, Non-consulting 40.91%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 61,607,003,010 VND, in which the total winning value is: 54,421,004,378 VND.
- The savings rate is: 11.66%.
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code
Similar goods purchased by Bid solicitor Ban Quản lý dự án hỗ trợ kỹ thuật "Quỹ toàn cầu phòng chống HIV/AIDS giai đoạn 2024-2026":
No similar goods purchased by the soliciting party were found.
Similar goods purchased by other Bid solicitors excluding Ban Quản lý dự án hỗ trợ kỹ thuật "Quỹ toàn cầu phòng chống HIV/AIDS giai đoạn 2024-2026":
No similar goods have been found that other Bid solicitors have purchased.
Similar goods for which the bidding results of the Ministry of Health have been announced:
No similar goods have been found in the bidding results of the Ministry of Health.