Invitation To Bid ( ITB, Tender Notice)

The road from National Highway 40B to Tu Level village, Tu Mo Rong commune, Tu Mo Rong district

    Watching    
Project Contractor selection plan Tender notice Bid Opening Result Bid award
Find: 10:51 26/04/2019
Procurement Category
Civil Works
Name of project
Poverty Reduction Project in the Central Highlands of Tu Mo Rong District
Name of Tender Notice
The road from National Highway 40B to Tu Level village, Tu Mo Rong commune, Tu Mo Rong district
Funding source
Funding from the World Bank (International Development Association IDA capital)
Range
Outside the scope of the Law on Bidding
Contract Period
To view full information, please Login or Register
Contractor selection methods
Appoint contractors
Contract Execution Location
Time of bid closing
09:04 18/04/2019

Main content

1. Project name: Road from National Highway 40B to Tu Level village, Tu Mo Rong commune, Tu Mo Rong district.

2. Investor: Poverty Reduction Project Management Board in Central Highlands, Tu Mo Rong district

3. Construction site: Tu Mo Rong commune

4. Contract Type: Package

5. Method of selection of contractors: Offers through the national bidding network.

6. Package price: 2,995,200,421 VND

7. Funding source: ODA (World Bank)

8. Scope of works

- Length of route L=885m

- Width of foundation, surface, roadside is designed as follows:

+ Section Km0+ 00-km0+575; Width of roadbed Bn=5m; Road surface width Bm=3.5m; Sidewalk width Bl= (0.75x2)=1.5m (In the curve, there is an expansion according to regulations).

+ Section Km0+575-km0+885; Width of roadbed Bn=4m; Road surface width Bm=3m; Curb width Bl= (0.5x2)=1m (In the curve, there is an expansion according to regulations).

- The surface and curb structure from top to bottom is as follows: 1x2 grade 250 BTXM road surface, 18cm thick; 01 layer of oil paper; Grade I crushed stone, Dmax25mm, 14cm thick; K95 compaction roadbed.

- Construction of shrinkage joints, pavement expansion joints according to temporary regulations on design of ordinary cement concrete pavements according to Decision 3230/QD-BGTVT, dated December 14, 2014 by the Minister of Transport, design of a contractile joint, an expansion joint in the form of a fake slot without a force rod (Details attached to TKBVTC).

b. Vertical drainage ditch: Trapezoidal groove design (40x40x120)cm; Rock structure 1x2 grade 150, bottom 10cm thick, wall 7cm thick for sections with vertical slope i ≥6%, trench sections connecting to culverts and sections with unstable geology. The remaining sections are dug bare earth trench

c. Village sluice: Design 02 village culverts constructed at the intersection Dimensions (60x60)cm (L=5m) foundation structure, wall, yard of culvert with cement stone 2x4 grade 150; Knitting sheets, beams made of reinforced concrete stone 1x2 mark 200.

d. Round culvert D150, At km 0+841 repair: reuse the sewer pipe, renew the head wall, wing wall, culvert yard with stone structure 2x4 mark 150, culvert roof reinforced with 1x2 stone cement concrete grade 150 10cm thick, foot tray KT (40x80)cm concrete stone 2x4 mark 150.

Participating in tenders

Bidding method
Online
Tender documents submission start from
13:49 11/04/2019
to
09:04 18/04/2019
Document Submission Fees
Tender Document Submission at
To view full information, please Login or Register

Bidding documents

Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent.
To download, please Login or Register

Bidding party analysis

Data analysis results of DauThau.info software for bid solicitors BAN QUẢN LÝ DỰ ÁN GIẢM NGHÈO KHU VỰC TÂY NGUYÊN HUYỆN TU MƠ RÔNG as follows:

  • Has relationships with 4 contractor.
  • The average number of contractors participating in each bidding package is: 1.20 contractors.
  • Proportion of bidding fields: Goods 0%, Construction 100.00%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
  • The total value according to the bidding package with valid IMP is: 8,912,680,000 VND, in which the total winning value is: 8,912,680,000 VND.
  • The savings rate is: 0.00%.
DauThau.info software reads from national bidding database

Utilities for you

Bidding information tracking
The Bid Tracking function helps you to quickly and promptly receive email notifications of changes to your bid package "The road from National Highway 40B to Tu Level village, Tu Mo Rong commune, Tu Mo Rong district". In addition, you will also receive notification of bidding results and contractor selection results when the results are posted to the system.
Receive similar invitation to bid by email
To be one of the first to be emailed to tender notices of similar packages: "The road from National Highway 40B to Tu Level village, Tu Mo Rong commune, Tu Mo Rong district" as soon as they are posted, sign up for DauThau.info's VIP 5 package .

Support and Error reporting

Support
What support do you need?
Reporting
Is there an error in the data on the page? You will be rewarded if you discover that the bidding package and KHLCNT have not met the online bidding regulations but DauThau.info does not warn or warns incorrectly.
Views: 44

Greeting
Greeting,
You are not logged in, please log in to use our various functions for members.

You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!

If you are still not our member, please sign up.

Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.

Search for bid information
Click for advanced search
Statistical
  • 8384 Projects are waiting for contractors
  • 1055 Tender notices posted in the last 24 hours
  • 1892 Contractor selection plan posted in the last 24 hours
  • 25328 Tender notices posted in the past month
  • 40507 Contractor selection plan posted in the last month
Consultants are supporting you
You are not logged in.
To view information, please Login or Register if you do not have an account.
Signing up is simple and completely free.
You did not use the site, Click here to remain logged. Timeout: 60 second