Invitation To Bid ( ITB, Tender Notice)

Traffic road of Buon Blak, Cu Pui commune, 2 axes (axis 1: from Ma Ren's house to Y Tru's house; axis 2: From canal to Ma Vu's house)

    Watching    
Project Contractor selection plan Tender notice Bid Opening Result Bid award
Find: 07:17 05/08/2019
Procurement Category
Civil Works
Name of project
Project on poverty reduction in the Central Highlands region
Name of Tender Notice
Traffic road of Buon Blak, Cu Pui commune, 2 axes (axis 1: from Ma Ren's house to Y Tru's house; axis 2: From canal to Ma Vu's house)
Funding source
ODA
Range
Outside the scope of the Law on Bidding
Contract Period
To view full information, please Login or Register
Contractor selection methods
Competitive Offer
Contract Execution Location
Time of bid closing
14:30 08/08/2019

Main content

Project Name: Poverty Reduction Project in the Central Highlands;

Investor: Cu Pui Commune Development Board;

Tendering Entity: Cu Commune Development Board Pui;

Address: Cu Pui Commune, Krong Bong District, Dak Lak Province;

Phone: 0262 3728022.

1. Package name: Buon Blak traffic road, Cu Pui commune, 2 axis (axis 1: from Ma Ren house to Y Tru house; axis 2: From canal to Ma Vu house);

2. Package price: 854.100.000 VND Funding source: ODA;

4. Type of bidding package: Construction and installation bidding package;

5. Method of selection of contractors: Competitive offers under a shortened online process;

6. Contractor selection method: One stage, one dossier bag;

7. Contract form: Package;

8. Contract performance time: 90 days;

9. Main contents of the bidding package:

- Technical scale: Grade B rural road according to TCVN 10380:2014 Road and Decision No: 4927/QD-BGTVT;

- Total construction length: 536.40m. 02 axes;

- Width of roadbed: Bn=4.0m;

- Width of road surface: Bm=3.0 m;

- Sidewalk width: Bl=0.5x2=1.0m;

- Roadbed structure:

+Embankment: Required compaction to ensure compaction Kyc > 0.95.

+The roadbed is excavated or unexcavated, not filled, requiring treatment of compaction to reach Kyc > 0.95.

- Top-down pavement structure as follows:

+Stone concrete pavement 1x2 M250 16cm thick.

+A layer of oil paper (or nylon tarpaulin) to create flatness and prevent shrinkage of the road surface.

< p>+Structural base type 1 (Dmax=37.5mm) 12cm thick Kyc > 0.98.

- Roadside structure:

Using the existing roadbed as a curb road, embankment section, the excavated soil should be used to fill the curb and compact Kyc > 0.95.

- Structure of drainage works:

+Take advantage of works existing drainage on the route, if still in good use.

+Design of trapezoidal trench, bottom size 50cm, height from bottom to shoulder 50cm, roof 1/1,5.

+ New construction of new concrete block culvert Lo=80cm. ( 01 piece/7m)

- Traffic safety system.

10. Bid validity period: 90 days;

11. Time, cost and place for bidding:

- Time for issuance of Bidding Documents: Starting from the time of posting the notice of invitation for bids on the System until 14:30, August 08, 2019;

- Bidding opening time: 15h00, August 8, 2019;

- Cost of purchasing bidding documents: Free;

- Venue to receive bidding documents: Website http://muasamcong.mpi.gov.vn.

- Venue for bid opening: Website: http://muasamcong.mpi.gov.vn.

Participating in tenders

Bidding method
Online
Tender documents submission start from
07:15 05/08/2019
to
14:30 08/08/2019
Document Submission Fees
Tender Document Submission at
To view full information, please Login or Register

Bidding documents

Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent.
To download, please Login or Register

Bidding party analysis

Data analysis results of DauThau.info software for bid solicitors Ban phát triển xã Cư Pui as follows:

  • Has relationships with 7 contractor.
  • The average number of contractors participating in each bidding package is: 3.00 contractors.
  • Proportion of bidding fields: Goods 0.00%, Construction 100.00%, Consulting 0.00%, Non-consulting 0.00%, Mixed 0.00%, Other 0%.
  • The total value according to the bidding package with valid IMP is: 5,412,104,000 VND, in which the total winning value is: 5,216,181,000 VND.
  • The savings rate is: 3.62%.
DauThau.info software reads from national bidding database

Utilities for you

Bidding information tracking
The Bid Tracking function helps you to quickly and promptly receive email notifications of changes to your bid package "Traffic road of Buon Blak, Cu Pui commune, 2 axes (axis 1: from Ma Ren's house to Y Tru's house; axis 2: From canal to Ma Vu's house)". In addition, you will also receive notification of bidding results and contractor selection results when the results are posted to the system.
Receive similar invitation to bid by email
To be one of the first to be emailed to tender notices of similar packages: "Traffic road of Buon Blak, Cu Pui commune, 2 axes (axis 1: from Ma Ren's house to Y Tru's house; axis 2: From canal to Ma Vu's house)" as soon as they are posted, sign up for DauThau.info's VIP 5 package .

Support and Error reporting

Support
What support do you need?
Reporting
Is there an error in the data on the page? You will be rewarded if you discover that the bidding package and KHLCNT have not met the online bidding regulations but DauThau.info does not warn or warns incorrectly.
Views: 108

Greeting
Greeting,
You are not logged in, please log in to use our various functions for members.

You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!

If you are still not our member, please sign up.

Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.

Search for bid information
Click for advanced search
Statistical
  • 8282 Projects are waiting for contractors
  • 1107 Tender notices posted in the last 24 hours
  • 1783 Contractor selection plan posted in the last 24 hours
  • 24322 Tender notices posted in the past month
  • 38542 Contractor selection plan posted in the last month
Consultants are supporting you
You are not logged in.
To view information, please Login or Register if you do not have an account.
Signing up is simple and completely free.
You did not use the site, Click here to remain logged. Timeout: 60 second