Contractor selection plan
Package No. 02/2024-ĐTXD: “Supply of materials, equipment and accessories”
Project: i) Lowering the voltage of line 379E1.4 loads, improving power supply reliability; ii) Lower the voltage of loads on line 375E1.4-376E.4, improving power supply reliability; iii) Depressurize the loads of Oanh Thuong branch and Bien Giang pump branch, line 378E1.4; iv) Renovating the power grid of high-rise apartment buildings in Mo Lao ward; v) Renovating the low voltage power grid in Mo Lao urban area; vi) Renovating underground lines 378, 379 E1.4 section from Ba La to Yen Nghia bus station; vii) Construction of new substations in Ha Dong District in 2024 -
Phase 1 (Phu Luong Ward, Yen Nghia, Van Quan, Phuc La); viii) New construction of 01 22kV feeder behind Chuong My 110kV substation; ix) Install additional SCADA remote control and monitoring equipment for the power grid in Ha Dong district in the period of 2023-2024; x) Install RMU cabinets with remote monitoring and control functions on the medium voltage power grid of Ha Dong District in the period of 2024