Improving urban infrastructure in Van Chuong ward by 2023 (Renovating sidewalks of Trung Tien alley; Renovating alleys and drainage systems in alleys 199 Van Chuong lane, 33 alley Van Chuong 2; alley 24, 36, 46, 48, etc.) 51, 59 Linh Quang, 70 lanes Van Chuong and Huy Van alleys)