Bidder Selection Plan

Designing, supplying equipment, installing replacement systems to speed up the H1 and H4 machine

  Watching      
Project Contractor selection plan Tender notice Bid Opening Result Bid award
Find: 16:34 29/05/2025
Contractor Selection Plan ID
PL2500130992-00
Publishing time
16:33 29/05/2025
Posting Status
Published
Contractor selection plan name
Designing, supplying equipment, installing replacement systems to speed up the H1 and H4 machine
Procurement name
Designing, supplying equipment, installing replacement systems to speed up the H1 and H4 machine
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Shopping budget
To view full information, please Login or Register
Spending Category
Mandatory spending
Authority that issues the decision
Công ty Cổ phần thủy điện Geruco Sông Côn
Approval date
26/05/2025
Approval ID
104/QĐ-GSC
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Related announcements

- Change: Decision-making agency, Approval date, Approval ID, Publication date, Bidding package information (View changes)

Posted for the first time (View changes)

List of Bid:
Number of packages: 2
1.Designing, supplying equipment, installing replacement systems to speed up the H1 and H4 machine
Tender/ Prequalification Notice ID
Contract execution period
147 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Designing, supplying equipment, installing replacement systems to speed up the H1 and H4 machine
Capital source details
Production capital of the company in 2025
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2025
Type of contract
All in One
Implementation location
Đông Giang District, Province Quảng Nam
Implementation location (After merge)
Prequalification
No
2.Consulting E-HSMT and E-HSDT evaluation for the bidding package "Designing, providing equipment, installing instead of the system to speed up the H1 and H4 machines-Song Con 2 Hydroelectric Plant"
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Consulting E-HSMT and E-HSDT evaluation for the bidding package "Designing, providing equipment, installing instead of the system to speed up the H1 and H4 machines-Song Con 2 Hydroelectric Plant"
Capital source details
Production capital of the company in 2025
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2025
Type of contract
All in One
Implementation location
Đông Giang District, Province Quảng Nam
Implementation location (After merge)
Prequalification
No

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Designing, supplying equipment, installing replacement systems to speed up the H1 and H4 machine". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Designing, supplying equipment, installing replacement systems to speed up the H1 and H4 machine" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 18

You did not use the site, Click here to remain logged. Timeout: 60 second