Bidder Selection Plan

Nhon Trach Chemical Plant Project

  Watching      
Find: 14:20 17/09/2025
Contractor Selection Plan ID
PL2500181721-02
Publishing time
14:18 17/09/2025
Posting Status
Published
Contractor selection plan name
Nhon Trach Chemical Plant Project
Investment objective
- Implementing the policy of converting Bien Hoa 1 Industrial Park into Urban - Trade - Service Area of Dong Nai People's Committee, Southern Basic Chemical Joint Stock Company will relocate the existing production lines of 03 factories located in Bien Hoa 1 Industrial Park to Nhon Trach Vi Industrial Park. Planning to build synchronous and modern manufacturing factories, creating stability in the long run and sustainable development orientation at the new production location.
Project management forms
The investor hires a project management consultant
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Project number
PR2500043356-00
Name of project
Total investment
To view full information, please Login or Register
Spending Category
Investment and Development Spending
Project group
Group B
Project implementation time
78 Month
Authority that issues the decision
Hội đồng quản trị Công ty Cổ phần Hóa chất Cơ bản Miền Nam
Approval date
17/09/2025
Approval ID
1256/QĐ-HĐQT
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Related announcements

- Change: Investor, Approval date, Approval ID, Publication date, Bidding package information (View changes)

- Change: Approval date, Approval ID, Publication date, Bidding package information (View changes)

- Change: Lowest bid price, Highest bid price, Approval date, Approval ID, Publication date, Bidding package information (View changes)

Posted for the first time (View changes)

List of Bid:
Number of packages: 38
1.TV-01 package: Consulting on making bidding doctors, evaluating Bids
Tender/ Prequalification Notice ID
Contract execution period
50 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Carry out the consulting work to compile bidding documents, evaluate bidding documents for bidding packages that do not depend on the construction drawing design (packages with bidding packages from MA-01 to MA-09).
Capital source details
Own capital and commercial loan
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Third quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
2.Bidding Package TV-02: Consulting on making bidding doctors, evaluating Bids of TV, MB, XL bidding packages
Tender/ Prequalification Notice ID
Contract execution period
188 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Carry out consultancy for bidding documents, evaluate bids for bidding packages, construction, purchase and procurement of projects of the project (excluding bidding packages with bidding packages from MA-01 to MA-09; TV-02.01).
Capital source details
Equity capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Third quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
3.Package TV-03: Geological survey of works in the period of TKBVTCC
Tender/ Prequalification Notice ID
Contract execution period
20 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Summary of main tasks of the bid package
Conducting geological surveys of construction drawing stage.
Capital source details
Own capital and commercial loan
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Third quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
4.Package TV-04: Supervisor of geological surveys of works in the period of TKBVTTC and construction of leveling, fence, security house
Tender/ Prequalification Notice ID
Contract execution period
120 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Summary of main tasks of the bid package
Monitoring of geological surveys of works in the design of construction drawings and construction of leveling, fence and security houses.
Capital source details
Equity capital
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Third quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
5.TV-06 Package: Supervision of construction and fire prevention and fighting
Tender/ Prequalification Notice ID
Contract execution period
266 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Carrying out the work of supervising construction supervision of construction works and fire prevention.
Capital source details
Own capital and commercial loan
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Third quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
6.Package TV-07: Supervision of construction and installation of technological equipment, electricity
Tender/ Prequalification Notice ID
Contract execution period
240 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Carry out the work of supervising construction and installation of technological equipment, electricity, specifically as follows: - Installing technological equipment; - Installing electrical equipment, measurement and control; - Installation of medium voltage power routes; - Installing lighting, geomorphic and lightning protection systems; - Installing the system of gas supply.
Capital source details
Own capital and commercial loan
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
7.TV-MT-01 package: Advice on applying for an environmental license
Tender/ Prequalification Notice ID
Contract execution period
180 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Perform consulting work for environmental permits of the project.
Capital source details
Own capital and commercial loan
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
8.TV-KT Package: Audit to settlement of the project completed
Tender/ Prequalification Notice ID
Contract execution period
313 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Carry out the Audit Audit to the completed project settlement.
Capital source details
Own capital and commercial loan
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Third quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
9.BH-01 package: Construction insurance
Tender/ Prequalification Notice ID
Contract execution period
35 months
Domestic/ International
Domestic
Bidding method
Directly
Fields
Non-consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Perform construction work insurance work.
Capital source details
Own capital and commercial loan
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Third quarter, 2025
Type of contract
By percentage
Prequalification
No
Implementation location (After merge)
10.MA-01 bidding package: Rectifier system and copper bar
Tender/ Prequalification Notice ID
Contract execution period
286 days
Domestic/ International
International
Bidding method
Directly
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
- Provide rectifier equipment and accessories; - Checking, completing, instructions for use and training; Test equipment and accept the device after the investor installs and connects complete.
Capital source details
Own capital and commercial loan
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Third quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
11.Bidding package MA-02: Saline filter equipment
Tender/ Prequalification Notice ID
Contract execution period
210 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
- Provide supplies, equipment, accessories and complete installation of Ceramic filtration system; - Provide supplies, equipment, accessories and complete the installation of ion exchange system; - Checking, completing, instructions for use and training; Test equipment and accept the device after the investor installs and connects complete.
Capital source details
Own capital and commercial loan
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Third quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
12.MA-03 Package: Alloy centrifugal pump
Tender/ Prequalification Notice ID
Contract execution period
210 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
- Provide equipment and accessories of all kinds; - Check, complete and accept equipment after the investor installs and connects complete.
Capital source details
Own capital and commercial loan
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Third quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
13.MA-04 Bidding Package: Plastic and cast iron centrifugal pump
Tender/ Prequalification Notice ID
Contract execution period
210 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
- Provide equipment and accessories of all kinds; - Check, complete and accept equipment after the investor installs and connects complete.
Capital source details
Own capital and commercial loan
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Third quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
14.MA-05 Package: Stainless steel and stainless steel pump
Tender/ Prequalification Notice ID
Contract execution period
210 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
- Provide equipment and accessories of all kinds; - Check, complete and accept equipment after the investor installs and connects complete.
Capital source details
Own capital and commercial loan
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Third quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
15.MA-06 Package: Heat exchange device
Tender/ Prequalification Notice ID
Contract execution period
210 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
- Provide equipment and accessories for heat exchange equipment of all kinds; - Providing a beam -type heat exchange device; - Check, complete and accept equipment after the investor installs and connects complete.
Capital source details
Own capital and commercial loan
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Third quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
16.Bidding package MA-07: Auxiliary equipment
Tender/ Prequalification Notice ID
Contract execution period
210 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
- Provide equipment and accessories of air compressors; - Supplying materials and equipment and completing the installation of water cooling tower; - Provide chiller equipment and accessories; - Supply of centrifugal equipment and accessories; - Supplying filter press equipment and accessories; - Check, complete and accept equipment after the investor installs and connects complete.
Capital source details
Own capital and commercial loan
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Third quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
17.MA-08 Bidding Package: Reaction device, tanks of all kinds
Tender/ Prequalification Notice ID
Contract execution period
210 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
- Provide reactive equipment, tanks of all kinds; - Provide reactive equipment, tanks of all kinds; - Check, complete and accept equipment after the investor installs and connects complete.
Capital source details
Own capital and commercial loan
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Third quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
18.MA-09 bidding package: Boiler treatment equipment
Tender/ Prequalification Notice ID
Contract execution period
210 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
- Provide supplies and equipment and complete installation of boiler smoke treatment system; - Check, complete and accept the system after the investor connects complete.
Capital source details
Own capital and commercial loan
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Third quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
19.Bidding package MB-01: Tank manufacturing equipment
Tender/ Prequalification Notice ID
Contract execution period
240 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
- Supplying materials, accessories, processing and installing tanks and equipment according to the design documents.
Capital source details
Own capital and commercial loan
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
20.Bidding package MB-02: Equipment for technical sulfuric acid lines
Tender/ Prequalification Notice ID
Contract execution period
149 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
- Supplying materials, accessories, processing and installing equipment according to the design documents.
Capital source details
Own capital and commercial loan
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
21.Bidding package MB-03: transformer and generator
Tender/ Prequalification Notice ID
Contract execution period
149 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
- Provide equipment and accessories for generators; - Supply transformer; - Check, complete and accept equipment after the investor installs and connects complete.
Capital source details
Own capital and commercial loan
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
22.Bidding package MB-04: Control measuring device
Tender/ Prequalification Notice ID
Contract execution period
240 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
- Provide measuring and control equipment of all kinds; - Provide valve control materials of all kinds; - Check and acceptance after the investor installs and connects complete.
Capital source details
Own capital and commercial loan
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
23.Bidding package MB-05: Automation system for electrolytic tanks
Tender/ Prequalification Notice ID
Contract execution period
240 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
- Provide supplies, equipment, accessories and complete the system installation; - Checking, completing, instructions for use and training; Test run and accept the whole system after the investor connects complete.
Capital source details
Own capital and commercial loan
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
24.Bidding package MB-06: Lot valve
Tender/ Prequalification Notice ID
Contract execution period
240 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Provide valves of all kinds.
Capital source details
Own capital and commercial loan
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
25.Bidding package MB-07: Plastic valve
Tender/ Prequalification Notice ID
Contract execution period
149 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Provide valves of all kinds.
Capital source details
Own capital and commercial loan
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
26.Bidding package MB-08: Technology valve
Tender/ Prequalification Notice ID
Contract execution period
149 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Provide valves of all kinds.
Capital source details
Own capital and commercial loan
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
27.Bidding package MB-09: Waste water treatment system
Tender/ Prequalification Notice ID
Contract execution period
149 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
- Provide equipment and accessories and complete the system installation; - Test operation; - Checking, completing, instructions for use and training; Acceptance.
Capital source details
Own capital and commercial loan
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
28.Bidding package MB-10: 80 ton car weighing system
Tender/ Prequalification Notice ID
Contract execution period
149 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
- Supplying materials, equipment and completing the installation of the scale system; - Check, test and acceptance.
Capital source details
Own capital and commercial loan
Contractor Selection Type
Competitive Offer
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
29.Bidding package MB-11: Other technology equipment
Tender/ Prequalification Notice ID
Contract execution period
235 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
- Supply equipment and accessories; - Check, complete and accept equipment after the investor installs and connects complete.
Capital source details
Own capital and commercial loan
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
30.Bidding package XL-01: construction of ground level, fence, security house
Tender/ Prequalification Notice ID
Contract execution period
120 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Summary of main tasks of the bid package
- Construction of leveling; - Construction of fence walls, gates and security houses
Capital source details
Own capital and commercial loan
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Third quarter, 2025
Type of contract
Fixed unit price
Prequalification
No
Implementation location (After merge)
31.Package XL-02: Building works
Tender/ Prequalification Notice ID
Contract execution period
266 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
- Construction of construction items, including: + Workshop works, warehouses, operators (excluding gates and security houses); + Machinery support, equipment, technology pipes; - Construction of infrastructure items including internal roads, rainwater drainage ditch systems, wastewater treatment areas.
Capital source details
Own capital and commercial loan
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Third quarter, 2025
Type of contract
Package and Fixed Price
Prequalification
No
Implementation location (After merge)
32.Package XL-03: Installation of fire prevention and fighting system
Tender/ Prequalification Notice ID
Contract execution period
266 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
- Provide supplies, equipment and complete the system installation according to the design documents; - Perform related procedures to accept fire prevention and fighting to put the system into use.
Capital source details
Own capital and commercial loan
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Third quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
33.Package XL-04: Installing technology equipment
Tender/ Prequalification Notice ID
Contract execution period
212 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
- Removing and transporting equipment from Bien Hoa 1 Industrial Park to Nhon Trach 6 Industrial Park; - Supplying materials, accessories, pipes; - Installing complete equipment, technology pipes of production lines according to design documents.
Capital source details
Own capital and commercial loan
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
Package and Fixed Price
Prequalification
No
Implementation location (After merge)
34.Bidding package XL-05: Installing electrical equipment, measurement, control
Tender/ Prequalification Notice ID
Contract execution period
212 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
- Removing and transporting electrical equipment from Bien Hoa 1 Industrial Park to Nhon Trach 6 Industrial Park; - Supplying materials, accessories for electrical equipment, measurement of control; - Supplying materials and accessories and completing the installation of electric cable systems and cable trays according to the design documents; - Installation of electrical equipment complete, measure and control the production lines according to the design documents.
Capital source details
Own capital and commercial loan
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
Package and Fixed Price
Prequalification
No
Implementation location (After merge)
35.Package XL-06: Installation of medium voltage power supply routes
Tender/ Prequalification Notice ID
Contract execution period
149 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
- Supplying materials, equipment and completing the installation of the medium voltage supply system according to the design document.
Capital source details
Own capital and commercial loan
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
36.Bidding package XL-07: Installing lighting, geography, lightning protection system
Tender/ Prequalification Notice ID
Contract execution period
240 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
- Provide supplies, equipment and complete the system installation according to the design documents.
Capital source details
Own capital and commercial loan
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
Fixed unit price
Prequalification
No
Implementation location (After merge)
37.Bidding package XL-08: Installation of gas supply system
Tender/ Prequalification Notice ID
Contract execution period
149 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
- Provide supplies and equipment and complete installation of the system of gas supply according to the design documents.
Capital source details
Own capital and commercial loan
Contractor Selection Type
Competitive Offer
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
38.Bidding Package TV-02.01: Consulting on making bidding doctors, evaluating Bid dossier construction level, fence, security house
Tender/ Prequalification Notice ID
Contract execution period
20 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Summary of main tasks of the bid package
Consulting for bidding documents, evaluating bidding documents for leveling and leveling
Capital source details
Equity capital
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Third quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Nhon Trach Chemical Plant Project". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Nhon Trach Chemical Plant Project" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 14

You did not use the site, Click here to remain logged. Timeout: 60 second