Bidder Selection Plan

Nhon Trach Chemical Plant Project

  Watching      
Find: 11:19 25/06/2026
Contractor Selection Plan ID
PL2500181721-09
Publishing time
11:18 25/06/2026
Posting Status
Published
Contractor selection plan name
Nhon Trach Chemical Plant Project
Investment objective
- Implementing the policy of converting Bien Hoa 1 Industrial Park into Urban - Trade - Service Area of Dong Nai People's Committee, Southern Basic Chemical Joint Stock Company will relocate the existing production lines of 03 factories located in Bien Hoa 1 Industrial Park to Nhon Trach Vi Industrial Park. Planning to build synchronous and modern manufacturing factories, creating stability in the long run and sustainable development orientation at the new production location.
Project management forms
The investor hires a project management consultant
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Project number
PR2500043356-00
Name of project
Total investment
To view full information, please Login or Register
Spending Category
Investment and Development Spending
Project group
Group B
Project implementation time
78 Month
Authority that issues the decision
Hội đồng quản trị Công ty Cổ phần Hóa chất Cơ bản Miền Nam
Approval date
25/06/2026
Approval ID
862/QĐ-HĐQT
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Related announcements

- Change: Approval date, Approval ID, Publication date, Bidding package information (View changes)

- Change: Approval date, Approval ID, Publication date, Bidding package information (View changes)

- Change: Highest bid price, Decision-making agency, Approval date, Approval ID, Publication date, Bidding package information (View changes)

- Change: Approval date, Approval ID, Publication date, Bidding package information (View changes)

- Change: Approval date, Approval ID, Publication date, Bidding package information (View changes)

- Change: Approval date, Approval ID, Publication date, Bidding package information (View changes)

- Change: Decision-making agency, Approval date, Approval ID, Publication date, Bidding package information (View changes)

- Change: Investor, Approval date, Approval ID, Publication date, Bidding package information (View changes)

- Change: Approval date, Approval ID, Publication date, Bidding package information (View changes)

- Change: Lowest bid price, Highest bid price, Approval date, Approval ID, Publication date, Bidding package information (View changes)

Posted for the first time (View changes)

List of Bid:
Number of packages: 42
1.Package TV-02.03: Consulting on preparation of bidding documents, evaluation of bidding documents for bidding packages TV, MB, MA, XL round 2
Tender/ Prequalification Notice ID
Contract execution period
90 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Summary of main tasks of the bid package
Carry out consulting work to prepare bidding documents and evaluate bids for bidding packages TV, MB, MA, XL phase 2 (not including bidding packages TV-02.01, TV-02.02).
Capital source details
Own capital and commercial loan
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2026
Type of contract
All in One
Implementation location (After merge)
Prequalification
No
2.Bidding Package TV-02: Consulting on making bidding doctors, evaluating Bids of TV, MB, XL bidding packages
Tender/ Prequalification Notice ID
Contract execution period
188 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Carry out consultancy for bidding documents, evaluate bids for bidding packages, construction, purchase and procurement of projects of the project (excluding bidding packages with bidding packages from MA-01 to MA-09; TV-02.01).
Capital source details
Equity capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Third quarter, 2025
Type of contract
All in One
Implementation location (After merge)
Prequalification
No
3.Package TV-03: Geological survey of works in the period of TKBVTCC
Tender/ Prequalification Notice ID
Contract execution period
20 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Summary of main tasks of the bid package
Conducting geological surveys of construction drawing stage.
Capital source details
Own capital and commercial loan
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Third quarter, 2025
Type of contract
All in One
Implementation location (After merge)
Prequalification
No
4.Package TV-04: Supervisor of geological surveys of works in the period of TKBVTTC and construction of leveling, fence, security house
Tender/ Prequalification Notice ID
Contract execution period
120 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Summary of main tasks of the bid package
Monitoring of geological surveys of works in the design of construction drawings and construction of leveling, fence and security houses.
Capital source details
Equity capital
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Third quarter, 2025
Type of contract
All in One
Implementation location (After merge)
Prequalification
No
5.Package TV-06.02: Construction supervision of phase 2 and fire protection
Tender/ Prequalification Notice ID
Contract execution period
280 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Summary of main tasks of the bid package
Carry out construction supervision consulting work for phase 2 works: - Construction and installation of project items and factories; - Construction and installation of equipment supports, technology pipeline supports; - Construction and installation of water supply and drainage systems; manholes, wastewater collection pits of construction items; - Installing cranes for factories; - Installing the car scale - Installation of electrical lighting systems for construction items and overall lighting systems; - Installation of grounding and lightning protection systems for the entire premises; - Installing a fire protection system for the entire factory including: fire protection system, emergency lighting system and escape instructions, automatic fire alarm system.
Capital source details
Own capital and commercial loan
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Second quarter, 2026
Type of contract
All in One
Implementation location (After merge)
Prequalification
No
6.Package TV-07.02: Supervision of construction and installation of technological and electrical equipment for phase 2
Tender/ Prequalification Notice ID
Contract execution period
420 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Summary of main tasks of the bid package
Carrying out consulting and supervising construction and installation of technological and electrical equipment for phase 2, specifically as follows: - Dismantling and transporting technological equipment and electrical equipment; - Installation of technological equipment; - Installation of technological pipes for production lines; installation of water supply pipes and wastewater drainage for the total area; installation of NG gas supply system; - Installation of electrical, measurement and control equipment; - Installation of electric cable systems and cable ladders; - Installation of medium voltage power supply lines; - Install a grounding system in the factory.
Capital source details
Own capital and commercial loan
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Second quarter, 2026
Type of contract
All in One
Implementation location (After merge)
Prequalification
No
7.TV-MT-01 package: Advice on applying for an environmental license
Tender/ Prequalification Notice ID
Contract execution period
180 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Perform consulting work for environmental permits of the project.
Capital source details
Own capital and commercial loan
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Implementation location (After merge)
Prequalification
No
8.TV-KT Package: Audit to settlement of the project completed
Tender/ Prequalification Notice ID
Contract execution period
313 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Carry out the Audit Audit to the completed project settlement.
Capital source details
Own capital and commercial loan
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Third quarter, 2025
Type of contract
All in One
Implementation location (After merge)
Prequalification
No
9.BH-01 package: Construction insurance
Tender/ Prequalification Notice ID
Contract execution period
35 months
Domestic/ International
Domestic
Bidding method
Directly
Fields
Non-consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Perform construction work insurance work.
Capital source details
Own capital and commercial loan
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Third quarter, 2025
Type of contract
By percentage
Implementation location (After merge)
Prequalification
No
10.Package MA-01: Rectifier transformer system for electrolytic tanks
Tender/ Prequalification Notice ID
Contract execution period
300 days
Domestic/ International
International
Bidding method
Directly
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
- Providing equipment and accessories for rectifier systems for electrolyzers; - Testing, completion, instructions for use and training; Test run the equipment and accept the equipment after the Investor completely installs and connects it.
Capital source details
Own capital and commercial loan
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
In the third quarter, 2026
Type of contract
All in One
Implementation location (After merge)
Prequalification
No
11.Bidding package MA-02: Saline filter equipment
Tender/ Prequalification Notice ID
Contract execution period
260 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Providing materials, equipment, and accessories for the ceramic membrane salt water filtration system; Provide materials, equipment, accessories and complete installation of the salt water ion exchange filtration system; Inspect and accept the system after the Owner completes the connection. Includes 02 lots: Lot 1: Ceramic membrane salt water filtration system. - Providing materials, equipment, and accessories for the ceramic membrane salt water filtration system; - Inspect and accept the system after the Investor installs equipment, technology pipes, electrodynamics, measurement and control and complete connections. Lot 2: Salt water ion exchange filtration system - Providing materials, equipment, and accessories for the salt water ion exchange filtration system; - Install equipment, technological pipes, electrical measurement and control systems of the salt water ion exchange filtration system; - Check and accept the system after the Owner completes the connection.
Capital source details
Own capital and commercial loan
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2026
Type of contract
All in One
Implementation location (After merge)
Prequalification
No
12.Package MA-04: Centrifugal pumps of all types
Tender/ Prequalification Notice ID
Contract execution period
240 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Providing all types of centrifugal pumps and spare parts; Inspect and accept equipment after the Investor installs the equipment, installs technology pipes and completes connections. Includes 03 lots: Lot 1: Centrifugal pump, plastic lined cast iron material - Providing plastic-lined cast iron centrifugal pumps and spare parts; - Supply of centrifugal pumps, self-priming type, plastic-lined cast iron materials and spare parts; - Providing magnetic drive centrifugal pumps; material in contact with fluid: PTFE or ETFE; - Inspect and accept equipment after the Investor installs the equipment, installs technology pipes and completes connections. Lot 2: Centrifugal pump, PP material - Supply of PP plastic material centrifugal pumps and spare parts; - Inspect and accept equipment after the investor installs the equipment, installs technology pipes and completes connections. Lot 3: Centrifugal pump of steel and stainless steel materials - Providing centrifugal pumps with steel materials and spare parts; - Providing stainless steel centrifugal pumps and spare parts; - Inspect and accept equipment after the Investor installs the equipment, installs technology pipes and completes connections.
Capital source details
Own capital and commercial loan
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
In the third quarter, 2026
Type of contract
All in One
Implementation location (After merge)
Prequalification
No
13.MA-06 Package: Heat exchange device
Tender/ Prequalification Notice ID
Contract execution period
300 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Providing heat exchange equipment of all types; Inspect, complete and accept equipment after the Investor completes the connection. Includes 02 lots: Lot 1: Plate heat exchanger. - Providing equipment and accessories for plate heat exchangers of all kinds; - Inspect, complete and accept equipment after the investor installs and connects completely. Lot 2: Welded plate heat exchanger. - Providing equipment and accessories for welded plate heat exchangers; - Inspect, complete and accept equipment after the Investor installs and connects completely.
Capital source details
Own capital and commercial loan
Contractor Selection Type
Competitive Offer
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
In the third quarter, 2026
Type of contract
All in One
Implementation location (After merge)
Prequalification
No
14.Bidding package MA-07: Auxiliary equipment
Tender/ Prequalification Notice ID
Contract execution period
240 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
- Providing air compressor equipment and accessories; - Provide materials, equipment and complete installation of water cooling towers; - Providing chiller equipment and accessories; - Providing materials, equipment, and accessories for boiler gas burners - Providing all kinds of tank equipment; - Install equipment on the foundation/complete installation; - Install, calibrate and complete burner connections - Inspect and accept equipment after the Investor installs technology pipes and complete connections. Includes 05 lots: Lot 1: Air compressor and accessories. - Providing air compressors and accessories; - Install equipment on the foundation; - Inspect and accept equipment after the Investor installs technology pipes and complete connections. Lot 2: Cooling Water cooling tower. - Providing materials, equipment, and accessories for cooling water towers; - Complete installation of cooling water cooling tower; - Inspect and accept equipment after the Investor installs technology pipes and complete connections. Lot 3: Water Chiller and accessories. - Providing water chillers and accessories; - Install equipment on the foundation; - Inspect and accept equipment after the Investor installs technology pipes and complete connections. Lot 4: Gas burner for boiler. - Providing materials, equipment, and accessories for boiler gas burners - Install, calibrate and complete burner connections - Inspect and accept the system after the Investor installs the technology pipeline and completes the connection. Lot 5: Tank equipment of all kinds. - Providing all kinds of tank equipment; - Inspect, complete and accept equipment after the Investor installs and connects completely.
Capital source details
Own capital and commercial loan
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
In the third quarter, 2026
Type of contract
All in One
Implementation location (After merge)
Prequalification
No
15.Bidding package MB-04: Control measuring device
Tender/ Prequalification Notice ID
Contract execution period
380 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Providing materials, measuring and control equipment of all kinds; Providing all kinds of control valve materials; Check and accept after the investor installs and connects completely. Includes 04 lots: Lot 1: Control valves of all kinds. - Supply of control valve materials of all kinds; - Check and accept after the Investor installs and connects completely. Lot 2: Control valve with cast iron body and steel lining. - Supply of control valve materials: cast iron and steel lining body materials of all kinds; - Check and accept after the Investor installs and connects completely. Lot 3: Mechanical measuring equipment. - Supply of materials, measurement and control equipment: mechanical measuring equipment; - Check and accept after the Investor installs and connects completely. Lot 4: Electronic measuring equipment. - Supply of materials, measurement and control equipment: electronic measuring equipment; - Check and accept after the Investor installs and connects completely.
Capital source details
Own capital and commercial loan
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
In the third quarter, 2026
Type of contract
All in One
Implementation location (After merge)
Prequalification
No
16.Bidding package MB-05: Automation system for electrolytic tanks
Tender/ Prequalification Notice ID
Contract execution period
300 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
- Provide materials, equipment, accessories and complete installation of the automation control system; - Testing, completion, instructions for use and training; Test run and accept the entire system after the Investor completes the connection. - Auxiliary control system.
Capital source details
Own capital and commercial loan
Contractor Selection Type
Competitive Offer
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
In the third quarter, 2026
Type of contract
All in One
Implementation location (After merge)
Prequalification
No
17.Package MB-06: Chlorine system valve and metal valve
Tender/ Prequalification Notice ID
Contract execution period
240 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Supply valves of all types; Check and accept after the Investor installs and connects completely. Includes 02 lots: Lot 1: Chlorine system valve. - Provide valves for chlorine tank systems - Check and accept after the Investor installs and connects completely. Lot 2: Metal valves and accessories. - Providing metal valves and accessories of all kinds - Check and accept after the Investor installs and connects completely.
Capital source details
Own capital and commercial loan
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
In the third quarter, 2026
Type of contract
All in One
Implementation location (After merge)
Prequalification
No
18.Bidding package MB-07: Plastic valve
Tender/ Prequalification Notice ID
Contract execution period
240 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Providing plastic valves of all kinds; Check and accept after the investor installs and connects completely. Includes 02 lots: Lot 1: Plastic valves - Group A. - Supply of plastic valves of all types: EU, G7 origin. - Check and accept after the Investor installs and connects completely Lot 2: Plastic valve - Group B-Supply of all kinds of plastic valves. - Check and accept after the Investor installs and connects completely.
Capital source details
Own capital and commercial loan
Contractor Selection Type
Competitive Offer
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
In the third quarter, 2026
Type of contract
All in One
Implementation location (After merge)
Prequalification
No
19.Package MB-08: Valve liner
Tender/ Prequalification Notice ID
Contract execution period
240 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Supply valve liners of all types; Check and accept after the investor installs and connects completely. Includes 04 lots: Lot 1: Ball valve - Group A. - Supply of lined valves, ball valve types: EU, G7 origin. - Check and accept after the Investor installs and connects completely. Lot 2: Butterfly valve - Group A. - Supply of lined valves, butterfly valve types: EU, G7 origin. - Check and accept after the Investor installs and connects completely. Lot 3 Diaphragm valves, check valves and accessories - Group A. - Providing diaphragm valve liners, one-way valves and accessories of all kinds: EU, G7 origin. - Check and accept after the Investor installs and connects completely. Lot 4: Valves and accessories - Group B. - Supply valve liners and accessories of all kinds. - Check and accept after the Investor installs and connects completely.
Capital source details
Own capital and commercial loan
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
In the third quarter, 2026
Type of contract
All in One
Implementation location (After merge)
Prequalification
No
20.Bidding package MB-09: Waste water treatment system
Tender/ Prequalification Notice ID
Contract execution period
420 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Summary of main tasks of the bid package
- Provide equipment, accessories and complete installation of the system: including equipment; technological pipes and accessories; measuring and control equipment; electrodynamics; - Test operation; - Testing, completion, instructions for use and training; acceptance.
Capital source details
Own capital and commercial loan
Contractor Selection Type
Competitive Offer
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2026
Type of contract
All in One
Implementation location (After merge)
Prequalification
No
21.Bidding package XL-01: construction of ground level, fence, security house
Tender/ Prequalification Notice ID
Contract execution period
120 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Summary of main tasks of the bid package
- Construction of leveling; - Construction of fence walls, gates and security houses
Capital source details
Own capital and commercial loan
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Third quarter, 2025
Type of contract
Fixed unit price
Implementation location (After merge)
Prequalification
No
22.Package XL-02.02: Construction of phase 2 work items
Tender/ Prequalification Notice ID
Contract execution period
280 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
- Construction and installation of project items and factories. - Construction and installation of equipment supports, technology pipeline supports; - Construction and installation of water supply and drainage systems; manholes, wastewater collection pits of construction items; - Supply and installation of cranes for factories; - Supply and installation of car scales - Installation of electrical lighting systems for construction items and overall lighting systems; - Installation of grounding and lightning protection systems for the entire premises; - Installing a fire protection system for the entire factory including: fire protection system, emergency lighting system and escape instructions, automatic fire alarm system.
Capital source details
Own capital and commercial loan
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2026
Type of contract
Package and Fixed Price
Implementation location (After merge)
Prequalification
No
23.Package XL-04.02: Dismantling, transporting, installing equipment and technology pipelines, phase 2
Tender/ Prequalification Notice ID
Contract execution period
420 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
- Dismantle and transport equipment from Bien Hoa Industrial Park 1 (Bien Hoa Chemical Factory) to Nhon Trach VI Industrial Park; - Installation of technological equipment (relocated and new) of production lines; - Supply of materials, accessories and complete installation of technological pipes for production lines; - Supply of materials, accessories and complete installation of water supply and wastewater pipes for the total area; - Supply of materials, equipment and complete installation of the NG gas supply system.
Capital source details
Own capital and commercial loan
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2026
Type of contract
Package and Fixed Price
Implementation location (After merge)
Prequalification
No
24.Package XL-05: Dismantling, transportation, installation of electrical, measurement and control equipment, phase 2
Tender/ Prequalification Notice ID
Contract execution period
420 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
- Dismantle and transport electrical equipment from Bien Hoa Industrial Park I (Bien Hoa Chemical Factory) to Nhon Trach IV Industrial Park; - Supply of materials and accessories for electrical, measurement and control equipment (remaining areas); - Complete installation of electrical equipment, measurement and control of production lines according to design documents (remaining areas). - Provide materials, accessories and complete installation of electric cable systems and cable trays according to design documents (total floor plan). - Supply and installation of ATS switching system - Shopping for copper bars - Installation of medium voltage power supply lines: Provide materials, equipment and complete installation of medium voltage power supply system according to design documents.
Capital source details
Own capital and commercial loan
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
In the third quarter, 2026
Type of contract
All in One
Implementation location (After merge)
Prequalification
No
25.Package XL-09: Tank manufacturing equipment
Tender/ Prequalification Notice ID
Contract execution period
260 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
- Provide materials, accessories, organize fabrication and installation of tanks according to design documents. - Check and accept after the Investor installs the technology pipeline and completes the connection.
Capital source details
Own capital and commercial loan
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
In the third quarter, 2026
Type of contract
All in One
Implementation location (After merge)
Prequalification
No
26.Bidding Package TV-02.01: Consulting on making bidding doctors, evaluating Bid dossier construction level, fence, security house
Tender/ Prequalification Notice ID
Contract execution period
20 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Summary of main tasks of the bid package
Consulting for bidding documents, evaluating bidding documents for leveling and leveling
Capital source details
Equity capital
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Third quarter, 2025
Type of contract
All in One
Implementation location (After merge)
Prequalification
No
27.Package TV-08: Prepare documents for local adjustment of detailed construction planning, scale 1/500
Tender/ Prequalification Notice ID
Contract execution period
20 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Carry out consulting work to prepare documents for local adjustment of detailed construction planning, scale 1/500 for the Nhon Trach Chemical Factory project.
Capital source details
Equity capital
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Implementation location (After merge)
Prequalification
No
28.Bidding package TV-02.02: Consulting on preparation of bidding documents, evaluation of bidding documents for bidding packages TV, MB, MA, XL phase 1
Tender/ Prequalification Notice ID
Contract execution period
90 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Summary of main tasks of the bid package
Carry out consulting work to prepare bidding documents and evaluate bids for bidding packages TV-06.01, TV-07.01, XL-02.01, XL-04.01, MA-10, MB-02, MB-03, MB-12, MB-13.
Capital source details
Capital itself.
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2026
Type of contract
All in One
Implementation location (After merge)
Prequalification
No
29.Package TV-06.01: Construction supervision of phase 1 work items
Tender/ Prequalification Notice ID
Contract execution period
270 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Summary of main tasks of the bid package
Carry out construction supervision consulting work for phase 1 project items
Capital source details
Own capital and commercial loan
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Quarter I, 2026
Type of contract
All in One
Implementation location (After merge)
Prequalification
No
30.Package TV-07.01: Supervision of construction and installation of technological and electrical equipment for phase 1
Tender/ Prequalification Notice ID
Contract execution period
270 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Summary of main tasks of the bid package
Carrying out consulting and supervising construction and installation of technological and electrical equipment for phase 1
Capital source details
Own capital and commercial loan
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Quarter I, 2026
Type of contract
All in One
Implementation location (After merge)
Prequalification
No
31.Package XL-02.01: Construction of phase 1 work items
Tender/ Prequalification Notice ID
Contract execution period
270 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction of work items in areas 1, 3, 6.8, 6.9, 12.1, 14, 15, internal roads, sidewalks, rainwater drainage system; lighting and grounding electricity for construction items in areas 1, 3, 6.8, 6.9, 12.1, 14; Test the static pile load of the entire project.
Capital source details
Own capital and commercial loan
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2026
Type of contract
Package and Fixed Price
Implementation location (After merge)
Prequalification
No
32.Package XL-04.01: Dismantling and transportation; Installation of equipment, technological pipes and electrical equipment, measurement and control phase 1
Tender/ Prequalification Notice ID
Contract execution period
270 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Summary of main tasks of the bid package
- Dismantle and transport technological equipment and electrical equipment from Bien Hoa 1 Industrial Park (Tan Binh 2 Chemical Factory, MgSO4 line of Bien Hoa Chemical Factory) to Nhon Trach VI Industrial Park; - Providing materials, piping equipment accessories; electrical supplies for measurement, control, electric cables, cable trays and complete installation of the entire system of equipment (relocated and new), technological piping system; electric cable system, electric cable tray; Electrical equipment, measurement and control systems of production lines (areas 3, 14) according to design documents.
Capital source details
Own capital and commercial loan
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2026
Type of contract
Package and Fixed Price
Implementation location (After merge)
Prequalification
No
33.Package MA-10: Procurement equipment for technical sulfuric acid line
Tender/ Prequalification Notice ID
Contract execution period
270 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Summary of main tasks of the bid package
Provide tube-tube heat exchanger; Providing exhaust gas treatment equipment; Install the equipment on the foundation; Inspect and accept equipment after the investor installs the technology pipeline and completes the connection.
Capital source details
Own capital and commercial loan
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2026
Type of contract
All in One
Implementation location (After merge)
Prequalification
No
34.Bid package MB-02: Manufacturing equipment for technical sulfuric acid line
Tender/ Prequalification Notice ID
Contract execution period
270 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Summary of main tasks of the bid package
Provide materials, accessories, organize manufacturing and installation of equipment according to design documents. Inspect and accept equipment after the investor installs the technology pipeline and completes the connection.
Capital source details
Own capital and commercial loan
Contractor Selection Type
Competitive Offer
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2026
Type of contract
All in One
Implementation location (After merge)
Prequalification
No
35.Bidding package MB-03: transformer and generator
Tender/ Prequalification Notice ID
Contract execution period
270 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Summary of main tasks of the bid package
- Provide equipment and accessories for generators; - Supply transformer; - Check, complete and accept equipment after the investor installs and connects complete.
Capital source details
Own capital and commercial loan
Contractor Selection Type
Competitive Offer
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2026
Type of contract
All in One
Implementation location (After merge)
Prequalification
No
36.Bid package MB-12: Heat-resistant and acid-resistant materials for technical sulfuric acid line
Tender/ Prequalification Notice ID
Contract execution period
120 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Summary of main tasks of the bid package
Providing heat-resistant materials and acid-resistant materials for repair equipment of the technical sulfuric acid line
Capital source details
Own capital and commercial loan
Contractor Selection Type
Competitive Offer
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2026
Type of contract
All in One
Implementation location (After merge)
Prequalification
No
37.Bidding package MB-13: Technology valve phase 1
Tender/ Prequalification Notice ID
Contract execution period
240 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Summary of main tasks of the bid package
Providing technological valves and accessories; plastic valves, lined valves
Capital source details
Own capital and commercial loan
Contractor Selection Type
Competitive Offer
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2026
Type of contract
All in One
Implementation location (After merge)
Prequalification
No
38.Bidding package TV-09 "Preparation of adjusted feasibility study report"
Tender/ Prequalification Notice ID
Contract execution period
40 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Carry out consulting work to prepare a feasibility study report to adjust the Nhon Trach Chemical Factory project.
Capital source details
Own capital and commercial loan
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2026
Type of contract
All in One
Implementation location (After merge)
Prequalification
No
39.Bidding package TV-10 "Verification of adjusted feasibility study report"
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Carrying out consulting work to verify the feasibility study report for adjusting the Nhon Trach Chemical Factory project.
Capital source details
Own capital and commercial loan
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2026
Type of contract
All in One
Implementation location (After merge)
Prequalification
No
40.Package TV-11 "Prevention and response planning for chemical incidents"
Tender/ Prequalification Notice ID
Contract execution period
120 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Carrying out consulting work on planning to prevent and respond to chemical incidents at Nhon Trach Chemical Factory project.
Capital source details
Own capital and commercial loan
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2026
Type of contract
All in One
Implementation location (After merge)
Prequalification
No
41.Package PTV-04.01: Dismantling and transporting equipment of Dong Nai Chemical Factory
Tender/ Prequalification Notice ID
Contract execution period
150 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Non-consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Summary of main tasks of the bid package
Dismantle and transport technological equipment and electrical equipment of Dong Nai Chemical Factory from Bien Hoa 1 Industrial Park to Nhon Trach VI Industrial Park.
Capital source details
Own capital and commercial loan
Contractor Selection Type
Competitive Offer
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2026
Type of contract
All in One
Implementation location (After merge)
Prequalification
No
42.Bidding package TV-12 "Valuation of construction materials"
Tender/ Prequalification Notice ID
Contract execution period
18 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Conducting price appraisal of some major construction materials to serve adjustment and estimation of work items under the Nhon Trach Chemical Factory Project.
Capital source details
Own capital and commercial loan
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2026
Type of contract
All in One
Implementation location (After merge)
Prequalification
No

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Nhon Trach Chemical Plant Project". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email