Bidder Selection Plan

Technical plan of the project Bridge technical infrastructure system combined with roads at both ends of the bridge through Minh Tien village, Quang Minh commune, Ba Don town

  Watching      
Find: 10:00 19/05/2025
Contractor Selection Plan ID
PL2400189771-02
Publishing time
09:59 19/05/2025
Posting Status
Published
Contractor selection plan name
Technical plan of the project Bridge technical infrastructure system combined with roads at both ends of the bridge through Minh Tien village, Quang Minh commune, Ba Don town
Investment objective
Create favorable conditions for travel, daily activities, and ensure traffic safety for people in Minh Tien village, Quang Minh commune in particular, and Ba Don town in general; contributing to eliminating community division, helping inter-regional connection to ensure sustainable development, ensuring synchronization with regional transport infrastructure, gradually building and perfecting infrastructure, beautifying the city. town to promote socio-economic development of Ba Don town and surrounding areas
Project management forms
BQLDA major - area
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Project number
PR2400049642-00
Total investment
To view full information, please Login or Register
Spending Category
Investment and Development Spending
Project group
Group C
Project implementation time
3 Years
Authority that issues the decision
UBND tỉnh Quảng Bình
Approval date
07/05/2025
Approval ID
1425/QĐ-UBND
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Related announcements

- Change: Approval date, Approval ID, Publication date, Bidding package information (View changes)

- Change: Publication date, Bidding package information (View changes)

Posted for the first time (View changes)

List of Bid:
Number of packages: 11
1.Set up a construction survey task for the step of establishing the TKBVTC
Tender/ Prequalification Notice ID
Contract execution period
15 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Make an outline of the survey task
Capital source details
- Medium-term public investment capital from the provincial budget: 45,000 million VND - Ba Don town budget source (balanced in the town's medium-term public investment plan for the period 2021-2025 and 2026-2030)
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q3 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Ba Đồn Town, Quảng Trị
Implementation location (Before merge)
Quang Binh province
2.Supervising and surveying the steps of setting up a TKBVTC
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Survey monitoring
Capital source details
- Medium-term public investment capital from the provincial budget: 45,000 million VND - Ba Don town budget source (balanced in the town's medium-term public investment plan for the period 2021-2025 and 2026-2030)
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q3 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Ba Đồn Town, Quảng Trị
Implementation location (Before merge)
Quang Binh province
3.Surveying, designing and estimating
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Survey, prepare financial protection and estimates
Capital source details
- Medium-term public investment capital from the provincial budget: 45,000 million VND - Ba Don town budget source (balanced in the town's medium-term public investment plan for the period 2021-2025 and 2026-2030)
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Q3 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Ba Đồn Town, Quảng Trị
Implementation location (Before merge)
Quang Binh province
4.Verification of BVTC and estimates
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Verify the Documents of the TCTC step
Capital source details
- Medium-term public investment capital from the provincial budget: 45,000 million VND - Ba Don town budget source (balanced in the town's medium-term public investment plan for the period 2021-2025 and 2026-2030)
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q3 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Ba Đồn Town, Quảng Trị
Implementation location (Before merge)
Quang Binh province
5.Valuation
Tender/ Prequalification Notice ID
Contract execution period
10 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Appraisal of equipment, products, and raw materials not included in SXD's price announcement
Capital source details
- Medium-term public investment capital from the provincial budget: 45,000 million VND - Ba Don town budget source (balanced in the town's medium-term public investment plan for the period 2021-2025 and 2026-2030)
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q3 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Ba Đồn Town, Quảng Trị
Implementation location (Before merge)
Quang Binh province
6.Clearing mines
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Non-consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Search and handle bombs, mines and explosives within the scope of project influence
Capital source details
- Medium-term public investment capital from the provincial budget: 45,000 million VND - Ba Don town budget source (balanced in the town's medium-term public investment plan for the period 2021-2025 and 2026-2030)
Contractor Selection Type
Specify reference
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q3 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Ba Đồn Town, Quảng Trị
Implementation location (Before merge)
Quang Binh province
7.Construction insurance
Tender/ Prequalification Notice ID
Contract execution period
30 months
Domestic/ International
Domestic
Bidding method
Directly
Fields
Non-consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction insurance
Capital source details
- Medium-term public investment capital from the provincial budget: 45,000 million VND - Ba Don town budget source (balanced in the town's medium-term public investment plan for the period 2021-2025 and 2026-2030)
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2025
Type of contract
By percentage
Prequalification
No
Implementation location (After merge)
Ba Đồn Town, Quảng Trị
Implementation location (Before merge)
Quang Binh province
8.Construction supervision
Tender/ Prequalification Notice ID
Contract execution period
18 months
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Supervise construction and equipment installation according to approved documents
Capital source details
- Medium-term public investment capital from the provincial budget: 45,000 million VND - Ba Don town budget source (balanced in the town's medium-term public investment plan for the period 2021-2025 and 2026-2030)
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Second quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Ba Đồn Town, Quảng Trị
Implementation location (Before merge)
Quang Binh province
9.Construction quality inspection
Tender/ Prequalification Notice ID
Contract execution period
18 months
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Check and evaluate the quality of works, through experiments, calculations and analysis according to current standards.
Capital source details
- Medium-term public investment capital from the provincial budget: 45,000 million VND - Ba Don town budget source (balanced in the town's medium-term public investment plan for the period 2021-2025 and 2026-2030)
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Ba Đồn Town, Quảng Trị
Implementation location (Before merge)
Quang Binh province
10.Drilled pile test
Tender/ Prequalification Notice ID
Contract execution period
12 months
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Testing and evaluating pile quality
Capital source details
- Medium-term public investment capital from the provincial budget: 45,000 million VND - Ba Don town budget source (balanced in the town's medium-term public investment plan for the period 2021-2025 and 2026-2030)
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Ba Đồn Town, Quảng Trị
Implementation location (Before merge)
Quang Binh province
11.Construction
Tender/ Prequalification Notice ID
Contract execution period
18 months
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction and equipment installation according to approved design documents
Capital source details
- Medium-term public investment capital from the provincial budget: 45,000 million VND - Ba Don town budget source (balanced in the town's medium-term public investment plan for the period 2021-2025 and 2026-2030)
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2025
Type of contract
According to adjusted unit price
Prequalification
No
Implementation location (After merge)
Ba Đồn Town, Quảng Trị
Implementation location (Before merge)
Quang Binh province

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Technical plan of the project Bridge technical infrastructure system combined with roads at both ends of the bridge through Minh Tien village, Quang Minh commune, Ba Don town". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Technical plan of the project Bridge technical infrastructure system combined with roads at both ends of the bridge through Minh Tien village, Quang Minh commune, Ba Don town" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 21

You did not use the site, Click here to remain logged. Timeout: 60 second