Data analysis results of DauThau.info software for bid solicitors NORTHERN MARITIME PILOTAGE ONE MEMBER LIMITED LIABITITY COMPANY as follows:
- Has relationships with 1 project owners.
- Has relationships with 59 contractor.
- Announced 13 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 48 contractor selection plans with a total of 82 bidding packages, of which 37 prequalification documents have not found the investment project.
- Has invited bids for 9 packages (with 10 tender notices), and conducted prequalification for 0 packages.
- There are 1 bidding packages with content that needs clarification.
- Announced the results of 71 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 64 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 5 packages that have not fully posted the contractor selection results. Of these 4 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.13 contractors.
- Breakdown by bidding field: Goods 40.00%, Construction 0%, Consultancy 0%, Non-consultancy 60.00%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 16,109,968,861 VND, of which the total winning bid value is: 16,029,192,952 VND.
- The savings rate is: 0.50%.
Data analysis results of DauThau.info software for bid solicitors NORTHERN MARITIME PILOTAGE ONE MEMBER LIMITED LIABITITY COMPANY as follows:
- Has relationships with 59 contractor.
- The average number of contractors participating in each bidding package is: 1.13 contractors.
- Proportion of bidding fields: Goods 40.00%, Construction 0%, Consulting 0%, Non-consulting 60.00%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 16,109,968,861 VND, in which the total winning value is: 16,029,192,952 VND.
- The savings rate is: 0.50%.
This Bid solicitor is also an investor. The analysis results of data for the investor NORTHERN MARITIME PILOTAGE ONE MEMBER LIMITED LIABITITY COMPANY are as follows:
- Is the investor of 13 development investment projects.
- Is the investor of 81 contractor selection plans, of which 48 were self-published, and 33 were published by other entities.
- Is the investor of 27 Tender Notices, of which 10 were self-invited, and 17 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
NORTHERN MARITIME PILOTAGE ONE MEMBER LIMITED LIABITITY COMPANY announced the results of the bid package Package No. 01: Survey, estimate .
- Winning bidder: hai phong ship design limited company
12/01/2026 15:57
NORTHERN MARITIME PILOTAGE ONE MEMBER LIMITED LIABITITY COMPANY announced the results of the bid package Buy 2026 Year of the Horse gifts for the Company's Managers, Employees and customer partners .
- Winning bidder: Hai Dang Tourism Group Joint Stock Company
12/01/2026 15:47
NORTHERN MARITIME PILOTAGE ONE MEMBER LIMITED LIABITITY COMPANY publishes the plan Bidding packages for the preparation phase of project implementation: Repair of Hong Long 2 ship with 2 bidding package .
07/01/2026 14:18
NORTHERN MARITIME PILOTAGE ONE MEMBER LIMITED LIABITITY COMPANY announced the results of the bid package No. 02: Providing AIS Pilot equipment .
- Winning bidder: ĐỈNH AN TECHNOLOGY JOINT STOCK COMPANY
22/12/2025 16:30
NORTHERN MARITIME PILOTAGE ONE MEMBER LIMITED LIABITITY COMPANY publishes Tender Notice Buy 2026 Year of the Horse gifts for the Company's Managers, Employees and customer partners in the form Open bidding .
22/12/2025 16:27
NORTHERN MARITIME PILOTAGE ONE MEMBER LIMITED LIABITITY COMPANY announced the results of the bid package Organize the second phase of the resource program in 2025 .
- Winning bidder: CÔNG TY CỔ PHẦN DU LỊCH BLUE TOUR QUỐC TẾ
15/12/2025 11:26
NORTHERN MARITIME PILOTAGE ONE MEMBER LIMITED LIABITITY COMPANY announced the results of the bid package No. 02: Providing office shoes for the Company's employees .
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI DỊCH VỤ SÀI GÒN ĐÔNG HẢI
10/12/2025 17:06
NORTHERN MARITIME PILOTAGE ONE MEMBER LIMITED LIABITITY COMPANY publishes the plan Organize the second phase of the resource program in 2025 with 1 bidding package .
10/12/2025 17:05
NORTHERN MARITIME PILOTAGE ONE MEMBER LIMITED LIABITITY COMPANY announced the results of the bid package Organize a program to return to sources in 2025 .
- Winning bidder: VIET NAM OCEAN SHIPPING AGENCY CORPORATION
02/12/2025 11:24
NORTHERN MARITIME PILOTAGE ONE MEMBER LIMITED LIABITITY COMPANY announced the results of the bid package Program to disseminate knowledge of labor law in 2025 .
- Winning bidder: Southern Institute of Social Resource Development
02/12/2025 11:21
The data sheet has been partially hidden, to see the full information please Login or Register
NORTHERN MARITIME PILOTAGE ONE MEMBER LIMITED LIABITITY COMPANY announced the results of the bid package Package 04: appraisal .
- Winning bidder: DHA ADVISORY AND VALUATION COMPANY LIMITED
11/11/2025 15:10
NORTHERN MARITIME PILOTAGE ONE MEMBER LIMITED LIABITITY COMPANY announced the results of the bid package Package No. 05: Consulting verification of feasibility study reports .
- Winning bidder: VIET NAM CONSTRUCTION TECHNOLOGY- ECONOMIC CONSULTING JOINT STOCK COMPANY
03/10/2025 15:29
NORTHERN MARITIME PILOTAGE ONE MEMBER LIMITED LIABITITY COMPANY announced the results of the bid package Bidding package 04: Consulting on supervision survey, geology .
- Winning bidder: VIET NAM CONSTRUCTION TECHNOLOGY- ECONOMIC CONSULTING JOINT STOCK COMPANY
03/10/2025 15:24
NORTHERN MARITIME PILOTAGE ONE MEMBER LIMITED LIABITITY COMPANY announced the results of the bid package Package 09: Shipbuilding Insurance .
- Winning bidder: military insurance corporation
24/09/2025 09:21
NORTHERN MARITIME PILOTAGE ONE MEMBER LIMITED LIABITITY COMPANY announced the results of the bid package No. 07: Supervision of repair and installation of equipment .
- Winning bidder: Maritime Research Institute (MRI)
14/08/2025 16:31
NORTHERN MARITIME PILOTAGE ONE MEMBER LIMITED LIABITITY COMPANY announced the results of the bid package Number 06: Convert Hong Long 1 .
- Winning bidder: OSHICO JOINT STOCK COMPANY
01/08/2025 08:35
NORTHERN MARITIME PILOTAGE ONE MEMBER LIMITED LIABITITY COMPANY announced the results of the bid package Package No. 08: Construction supervision .
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN CÔNG TRÌNH THUỶ BỘ XUÂN PHÚ
29/07/2025 14:08
NORTHERN MARITIME PILOTAGE ONE MEMBER LIMITED LIABITITY COMPANY announced the results of the bidding package Number 06: Convert Hong Long 1 with 1 participating contractors .
07/07/2025 09:14
NORTHERN MARITIME PILOTAGE ONE MEMBER LIMITED LIABITITY COMPANY announced the results of the bid package Number 04: Supervision of construction of Hong Long ship repair works 2 .
- Winning bidder: Maritime Research Institute (MRI)
20/06/2025 16:55
NORTHERN MARITIME PILOTAGE ONE MEMBER LIMITED LIABITITY COMPANY announced the results of the bid package Package No. 04: Repairing Hong Long ship 10 .
- Winning bidder: SON HAI SHIPBUILDING ONE MEMBER LIMITED COMPANY
18/06/2025 16:35
The data sheet has been partially hidden, to see the full information please Login or Register
NORTHERN MARITIME PILOTAGE ONE MEMBER LIMITED LIABITITY COMPANY announced the results of the bid package Package No. 01: Survey, estimate .
- Winning bidder: hai phong ship design limited company
12/01/2026 15:57
NORTHERN MARITIME PILOTAGE ONE MEMBER LIMITED LIABITITY COMPANY announced the results of the bid package Buy 2026 Year of the Horse gifts for the Company's Managers, Employees and customer partners .
- Winning bidder: Hai Dang Tourism Group Joint Stock Company
12/01/2026 15:47
NORTHERN MARITIME PILOTAGE ONE MEMBER LIMITED LIABITITY COMPANY publishes the plan Bidding packages for the preparation phase of project implementation: Repair of Hong Long 2 ship with 2 bidding package .
07/01/2026 14:18
NORTHERN MARITIME PILOTAGE ONE MEMBER LIMITED LIABITITY COMPANY announced the results of the bid package No. 02: Providing AIS Pilot equipment .
- Winning bidder: ĐỈNH AN TECHNOLOGY JOINT STOCK COMPANY
22/12/2025 16:30
NORTHERN MARITIME PILOTAGE ONE MEMBER LIMITED LIABITITY COMPANY publishes Tender Notice Buy 2026 Year of the Horse gifts for the Company's Managers, Employees and customer partners in the form Open bidding .
22/12/2025 16:27
NORTHERN MARITIME PILOTAGE ONE MEMBER LIMITED LIABITITY COMPANY announced the results of the bid package Organize the second phase of the resource program in 2025 .
- Winning bidder: CÔNG TY CỔ PHẦN DU LỊCH BLUE TOUR QUỐC TẾ
15/12/2025 11:26
NORTHERN MARITIME PILOTAGE ONE MEMBER LIMITED LIABITITY COMPANY announced the results of the bid package No. 02: Providing office shoes for the Company's employees .
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI DỊCH VỤ SÀI GÒN ĐÔNG HẢI
10/12/2025 17:06
NORTHERN MARITIME PILOTAGE ONE MEMBER LIMITED LIABITITY COMPANY publishes the plan Organize the second phase of the resource program in 2025 with 1 bidding package .
10/12/2025 17:05
NORTHERN MARITIME PILOTAGE ONE MEMBER LIMITED LIABITITY COMPANY announced the results of the bid package Organize a program to return to sources in 2025 .
- Winning bidder: VIET NAM OCEAN SHIPPING AGENCY CORPORATION
02/12/2025 11:24
NORTHERN MARITIME PILOTAGE ONE MEMBER LIMITED LIABITITY COMPANY announced the results of the bid package Program to disseminate knowledge of labor law in 2025 .
- Winning bidder: Southern Institute of Social Resource Development
02/12/2025 11:21
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s NORTHERN MARITIME PILOTAGE ONE MEMBER LIMITED LIABITITY COMPANY has posted 48 of the contractor selection plan, which contains 82 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor NORTHERN MARITIME PILOTAGE ONE MEMBER LIMITED LIABITITY COMPANY has posted 10 Tender Notices in 9 bidding packages. Among these, 10 Tender Notices were self-invited, and 0 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor NORTHERN MARITIME PILOTAGE ONE MEMBER LIMITED LIABITITY COMPANY has posted 71 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 71 package, canceled the bid 0 package (among the bidding packages above).
- There are 64 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor NORTHERN MARITIME PILOTAGE ONE MEMBER LIMITED LIABITITY COMPANY has a relationship with 59 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor NORTHERN MARITIME PILOTAGE ONE MEMBER LIMITED LIABITITY COMPANY has a relationship with 10 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity NORTHERN MARITIME PILOTAGE ONE MEMBER LIMITED LIABITITY COMPANY has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects