- Has relationships with 3 project owners.
- Has relationships with 2 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 10 contractor selection plans with a total of 29 bidding packages, of which 10 prequalification documents have not found the investment project.
- Has invited bids for 2 packages (with 2 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 2 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 2 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 29 packages that have not fully posted the contractor selection results. Of these 29 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 100.00%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 16,389,953,741 VND, of which the total winning bid value is: 16,384,859,000 VND.
- The savings rate is: 0.03%.
Data analysis results of DauThau.info software for bid solicitors Site clearance board Phu Ly city as follows:
- Has relationships with 2 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 100.00%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 16,389,953,741 VND, in which the total winning value is: 16,384,859,000 VND.
- The savings rate is: 0.03%.
This Bid solicitor is also an investor. The analysis results of data for the investor Site clearance board Phu Ly city are as follows:
- Is the investor of 0 development investment projects.
- Is the investor of 6 contractor selection plans, of which 6 were self-published, and 0 were published by other entities.
- Is the investor of 0 Tender Notices, of which 0 were self-invited, and 0 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Site clearance board Phu Ly city has posted the request Relocating 0.4KV low voltage power line to serve site clearance of the project: Construction and construction of technical infrastructure of housing area for officials and employees of key medical project management board - Ministry of Health. Location: Liem Tuyen commune - Phu Ly city - Ha Na province of the investor Site clearance board Phu Ly city with 3 bidding package.
13/03/2018 09:57
The Bid solicitor Site clearance board Phu Ly city has posted the results of the bidding package Package 01: Construction and installation (construction, temporary houses and other direct) of the investor Site clearance board Phu Ly city.
27/09/2016 09:49
The Bid solicitor Site clearance board Phu Ly city has posted the results of the bidding package Package 02: Construction and installation phase 1 (including construction, equipment, general costs) of the investor Site clearance board Phu Ly city.
- Winning bidder: Công ty TNHH xây dựng Tùng Phát
27/09/2016 09:19
The Bid solicitor Site clearance board Phu Ly city has posted the request Moving the 0.4KV power line to serve the site clearance of the construction investment project of National Highway 1, bypassing Phu Ly city and strengthening the road surface of National Highway 1, section Km 215+775 - Km 235+885 in Ha Nam province of the investor Site clearance board Phu Ly city with 3 bidding package.
27/09/2016 08:28
The Bid solicitor Site clearance board Phu Ly city has posted the request Moving the 0.4kV line after the Thanh Binh 1 substation to serve the site clearance to implement the project of building a road connecting the Hanoi - Hai Phong expressway with the Cau Gie - Ninh Binh expressway, Dinh Xa commune. , Phu Ly city, Ha Nam province of the investor Site clearance board Phu Ly city with 3 bidding package.
05/09/2016 09:41
The Bid solicitor Site clearance board Phu Ly city has posted the request Moving the 0.4kV power line after the Liem Tuyen 3 cooperative substation for site clearance, implementing the project of building a road connecting Hanoi - Hai Phong highway with Cau Gie - Ninh Binh expressway, Liem commune area Tuyen, Phu Ly city, Ha Nam province of the investor Site clearance board Phu Ly city with 3 bidding package.
05/09/2016 09:22
The Bid solicitor Site clearance board Phu Ly city has posted the request Move the 22KV line 471E24.2 to Ly Nhan from column 08 to pole 11 and the 35KV line 372E3.5 to Binh Luc from column 22 to column 25 to serve site clearance to carry out the project of road construction. Hanoi - Hai Phong highway with Cau Gie - Ninh Binh highway, Trinh Xa commune - Phu Ly city - Ha Nam province of the investor Site clearance board Phu Ly city with 3 bidding package.
05/09/2016 08:57
The Bid solicitor Site clearance board Phu Ly city has posted the request Installing culverts to return canals in the planning ground for the resettlement area and supporting land 7% for ground clearance for construction project 2 - Bach Mai Hospital of the investor Site clearance board Phu Ly city with 1 bidding package.
01/08/2016 10:02
The data sheet has been partially hidden, to see the full information please Login or Register
Site clearance board Phu Ly city publishes the plan Relocating 0.4KV low voltage power line to serve site clearance of the project: Construction and construction of technical infrastructure of housing area for officials and employees of key medical project management board - Ministry of Health. Location: Liem Tuyen commune - Phu Ly city - Ha Na province with 3 bidding package .
13/03/2018 09:57
Site clearance board Phu Ly city publishes the plan Moving 10kV, 35kV medium voltage lines for project clearance: Renovating and upgrading national highway 21B from Km41+00 to Km57+950 (oil market - Ba Da) the section passing through Kim Binh commune, city Phu Ly with 3 bidding package .
25/05/2017 16:33
Site clearance board Phu Ly city publishes the plan Moving the 0.4kV transmission line in service of site clearance of the project: Renovating Phan Trong Tue street. Location: Thanh Chau ward, Phu Ly city, Ha Nam province with 3 bidding package .
28/11/2016 09:11
Site clearance board Phu Ly city announced the results of the bid package Package 01: Construction and installation (construction, temporary houses and other direct) .
- Winning bidder: Công ty TNHH thương mại dịch vụ xây dựng Hồng Phú
27/09/2016 09:49
Site clearance board Phu Ly city announced the results of the bid package Package 02: Construction and installation phase 1 (including construction, equipment, general costs) .
- Winning bidder: Công ty TNHH xây dựng Tùng Phát
27/09/2016 09:19
Site clearance board Phu Ly city publishes the plan Moving the 0.4KV power line to serve the site clearance of the construction investment project of National Highway 1, bypassing Phu Ly city and strengthening the road surface of National Highway 1, section Km 215+775 - Km 235+885 in Ha Nam province with 3 bidding package .
27/09/2016 08:28
Site clearance board Phu Ly city publishes the plan Moving the 0.4kV line after the Thanh Binh 1 substation to serve the site clearance to implement the project of building a road connecting the Hanoi - Hai Phong expressway with the Cau Gie - Ninh Binh expressway, Dinh Xa commune. , Phu Ly city, Ha Nam province with 3 bidding package .
05/09/2016 09:41
Site clearance board Phu Ly city publishes the plan Moving the 0.4kV power line after the Liem Tuyen 3 cooperative substation for site clearance, implementing the project of building a road connecting Hanoi - Hai Phong highway with Cau Gie - Ninh Binh expressway, Liem commune area Tuyen, Phu Ly city, Ha Nam province with 3 bidding package .
05/09/2016 09:22
Site clearance board Phu Ly city publishes the plan Move the 22KV line 471E24.2 to Ly Nhan from column 08 to pole 11 and the 35KV line 372E3.5 to Binh Luc from column 22 to column 25 to serve site clearance to carry out the project of road construction. Hanoi - Hai Phong highway with Cau Gie - Ninh Binh highway, Trinh Xa commune - Phu Ly city - Ha Nam province with 3 bidding package .
05/09/2016 08:57
Site clearance board Phu Ly city publishes the plan Moving the 22kV transmission line 476 E3.5 from pole 67 to pole CDPT 476/75 and from pole 73 to pole 76 to serve site clearance for implementation of the road construction project connecting Hanoi - Hai Phong highway with the bridge Gie - Ninh Binh highway, Dinh Xa commune, Phu Ly city, Ha Nam province with 3 bidding package .
05/09/2016 08:41
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Site clearance board Phu Ly city has posted the request Relocating 0.4KV low voltage power line to serve site clearance of the project: Construction and construction of technical infrastructure of housing area for officials and employees of key medical project management board - Ministry of Health. Location: Liem Tuyen commune - Phu Ly city - Ha Na province of the investor Site clearance board Phu Ly city with 3 bidding package.
13/03/2018 09:57
The Bid solicitor Site clearance board Phu Ly city has posted the results of the bidding package Package 01: Construction and installation (construction, temporary houses and other direct) of the investor Site clearance board Phu Ly city.
27/09/2016 09:49
The Bid solicitor Site clearance board Phu Ly city has posted the results of the bidding package Package 02: Construction and installation phase 1 (including construction, equipment, general costs) of the investor Site clearance board Phu Ly city.
- Winning bidder: Công ty TNHH xây dựng Tùng Phát
27/09/2016 09:19
The Bid solicitor Site clearance board Phu Ly city has posted the request Moving the 0.4KV power line to serve the site clearance of the construction investment project of National Highway 1, bypassing Phu Ly city and strengthening the road surface of National Highway 1, section Km 215+775 - Km 235+885 in Ha Nam province of the investor Site clearance board Phu Ly city with 3 bidding package.
27/09/2016 08:28
The Bid solicitor Site clearance board Phu Ly city has posted the request Moving the 0.4kV line after the Thanh Binh 1 substation to serve the site clearance to implement the project of building a road connecting the Hanoi - Hai Phong expressway with the Cau Gie - Ninh Binh expressway, Dinh Xa commune. , Phu Ly city, Ha Nam province of the investor Site clearance board Phu Ly city with 3 bidding package.
05/09/2016 09:41
The Bid solicitor Site clearance board Phu Ly city has posted the request Moving the 0.4kV power line after the Liem Tuyen 3 cooperative substation for site clearance, implementing the project of building a road connecting Hanoi - Hai Phong highway with Cau Gie - Ninh Binh expressway, Liem commune area Tuyen, Phu Ly city, Ha Nam province of the investor Site clearance board Phu Ly city with 3 bidding package.
05/09/2016 09:22
The Bid solicitor Site clearance board Phu Ly city has posted the request Move the 22KV line 471E24.2 to Ly Nhan from column 08 to pole 11 and the 35KV line 372E3.5 to Binh Luc from column 22 to column 25 to serve site clearance to carry out the project of road construction. Hanoi - Hai Phong highway with Cau Gie - Ninh Binh highway, Trinh Xa commune - Phu Ly city - Ha Nam province of the investor Site clearance board Phu Ly city with 3 bidding package.
05/09/2016 08:57
The Bid solicitor Site clearance board Phu Ly city has posted the request Installing culverts to return canals in the planning ground for the resettlement area and supporting land 7% for ground clearance for construction project 2 - Bach Mai Hospital of the investor Site clearance board Phu Ly city with 1 bidding package.
01/08/2016 10:02
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Site clearance board Phu Ly city has posted 10 of the contractor selection plan, which contains 29 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Site clearance board Phu Ly city has posted 2 Tender Notices in 2 bidding packages. Among these, -1 Tender Notices were self-invited, and 3 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Site clearance board Phu Ly city has posted 2 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 2 package, canceled the bid 0 package (among the bidding packages above).
- There are 2 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Site clearance board Phu Ly city has a relationship with 2 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Site clearance board Phu Ly city has a relationship with 4 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects