Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Ban quản lý cảng Bến Đầm as follows:
- Has relationships with 1 project owners.
- Has relationships with 9 contractor.
- Announced 9 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 2 contractor selection plans with a total of 16 bidding packages, of which 2 prequalification documents have not found the investment project.
- Has invited bids for 1 packages (with 1 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 5 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 4 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 16 packages that have not fully posted the contractor selection results. Of these 16 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 100.00%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 13,860,210,620 VND, of which the total winning bid value is: 13,306,402,330 VND.
- The savings rate is: 4.00%.
Data analysis results of DauThau.info software for bid solicitors Ban quản lý cảng Bến Đầm as follows:
- Has relationships with 9 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 100.00%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 13,860,210,620 VND, in which the total winning value is: 13,306,402,330 VND.
- The savings rate is: 4.00%.
This Bid solicitor is also an investor. The analysis results of data for the investor Ban quản lý cảng Bến Đầm are as follows:
- Is the investor of 9 development investment projects.
- Is the investor of 2 contractor selection plans, of which 2 were self-published, and 0 were published by other entities.
- Is the investor of 16 Tender Notices, of which 0 were self-invited, and 16 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Investor Ban quản lý cảng Bến Đầm has posted an investment and development project Refurbishment of Ben Dam port infrastructure - Item: Solidify embankment and embankment crest road, improve parking lot and upgrade branch road.
14/09/2022 07:00
Investor Ban quản lý cảng Bến Đầm has posted an investment and development project Repair and maintain the system of navigation buoys and mooring buoys in the storm shelter for Con Dao fishing vessels.
10/12/2021 07:00
The Bid solicitor Ban quản lý cảng Bến Đầm has posted the results of the bidding package Construction of technical infrastructure works and the rest of hydraulic works of the investor Ban quản lý cảng Bến Đầm.
14/10/2021 16:01
The Bid solicitor Ban quản lý cảng Bến Đầm has posted the results of the bidding package Construction of architectural works and installation of equipment of the investor Ban quản lý cảng Bến Đầm.
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ XÂY DỰNG OSC
14/10/2021 15:55
Investor Ban quản lý cảng Bến Đầm has posted an investment and development project Con Dao passenger port, Con Dao district.
29/04/2021 07:00
Investor Ban quản lý cảng Bến Đầm has posted an investment and development project Renovating the block of fish picking house to wait for the addition of public toilets at Ben Dam Port.
05/03/2021 07:00
Investor Ban quản lý cảng Bến Đầm has posted an investment and development project Item of repairing the connecting road from the bridge to the port gate, the parking lot around the temporary shelter under the renovation project of the port infrastructure.
05/03/2021 07:00
Investor Ban quản lý cảng Bến Đầm has posted an investment and development project Repairing the headquarters and embankment section of the Ben Dam Port Management Board.
20/11/2020 07:00
The Bid solicitor Ban quản lý cảng Bến Đầm has posted the results of the bidding package Drainage system of the investor Ban quản lý cảng Bến Đầm.
10/12/2018 13:51
The Bid solicitor Ban quản lý cảng Bến Đầm has posted the results of the bidding package Construction of piers of the investor Ban quản lý cảng Bến Đầm.
06/12/2018 14:05
The data sheet has been partially hidden, to see the full information please Login or Register
Ban quản lý cảng Bến Đầm announced the results of the bid package Construction of technical infrastructure works and the rest of hydraulic works .
- Winning bidder: Công ty cổ phần dịch vụ xây lắp hạ tầng
14/10/2021 16:01
Ban quản lý cảng Bến Đầm announced the results of the bid package Construction of architectural works and installation of equipment .
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ XÂY DỰNG OSC
14/10/2021 15:55
Ban quản lý cảng Bến Đầm announced the results of the bid package Drainage system .
- Winning bidder: Công ty cổ phần dịch vụ xây lắp hạ tầng
10/12/2018 13:51
Ban quản lý cảng Bến Đầm announced the results of the bid package Construction of piers .
- Winning bidder: Công Ty Cổ Phần Công Trình Cầu Phà Thành Phố Hồ Chí Minh
06/12/2018 14:05
Ban quản lý cảng Bến Đầm announced the results of the bid package Ship repair and maintenance .
- Winning bidder: CÔNG TY CỔ PHẦN TRỤC VỚT CỨU HỘ VIỆT NAM
19/11/2018 07:58
Ban quản lý cảng Bến Đầm announced the results of the bid package Repair and maintenance of air conditioning systems .
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI VÀ DỊCH VỤ EBISU
06/11/2018 15:14
Ban quản lý cảng Bến Đầm announced the results of the bid package Repair and maintenance of life-saving fire fighting equipment .
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI VÀ DỊCH VỤ KỸ THUẬT KIM NAM
06/11/2018 15:03
Ban quản lý cảng Bến Đầm announced the results of the bid package Repair and maintenance of marine and radio equipment .
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI VÀ DỊCH VỤ EBISU
05/11/2018 14:53
Ban quản lý cảng Bến Đầm announced the results of the bid package Repair and maintenance of air conditioning systems .
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI VÀ DỊCH VỤ EBISU
22/10/2018 11:29
Ban quản lý cảng Bến Đầm announced the results of the bid package Repair and maintenance of life-saving fire fighting equipment .
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI VÀ DỊCH VỤ KỸ THUẬT KIM NAM
22/10/2018 11:12
The data sheet has been partially hidden, to see the full information please Login or Register
Investor Ban quản lý cảng Bến Đầm has posted an investment and development project Refurbishment of Ben Dam port infrastructure - Item: Solidify embankment and embankment crest road, improve parking lot and upgrade branch road.
14/09/2022 07:00
Investor Ban quản lý cảng Bến Đầm has posted an investment and development project Repair and maintain the system of navigation buoys and mooring buoys in the storm shelter for Con Dao fishing vessels.
10/12/2021 07:00
The Bid solicitor Ban quản lý cảng Bến Đầm has posted the results of the bidding package Construction of technical infrastructure works and the rest of hydraulic works of the investor Ban quản lý cảng Bến Đầm.
14/10/2021 16:01
The Bid solicitor Ban quản lý cảng Bến Đầm has posted the results of the bidding package Construction of architectural works and installation of equipment of the investor Ban quản lý cảng Bến Đầm.
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ XÂY DỰNG OSC
14/10/2021 15:55
Investor Ban quản lý cảng Bến Đầm has posted an investment and development project Con Dao passenger port, Con Dao district.
29/04/2021 07:00
Investor Ban quản lý cảng Bến Đầm has posted an investment and development project Renovating the block of fish picking house to wait for the addition of public toilets at Ben Dam Port.
05/03/2021 07:00
Investor Ban quản lý cảng Bến Đầm has posted an investment and development project Item of repairing the connecting road from the bridge to the port gate, the parking lot around the temporary shelter under the renovation project of the port infrastructure.
05/03/2021 07:00
Investor Ban quản lý cảng Bến Đầm has posted an investment and development project Repairing the headquarters and embankment section of the Ben Dam Port Management Board.
20/11/2020 07:00
The Bid solicitor Ban quản lý cảng Bến Đầm has posted the results of the bidding package Drainage system of the investor Ban quản lý cảng Bến Đầm.
10/12/2018 13:51
The Bid solicitor Ban quản lý cảng Bến Đầm has posted the results of the bidding package Construction of piers of the investor Ban quản lý cảng Bến Đầm.
06/12/2018 14:05
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ban quản lý cảng Bến Đầm has posted 2 of the contractor selection plan, which contains 16 of the bidding package. See full list here
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Ban quản lý cảng Bến Đầm has posted 1 Tender Notices in 1 bidding packages. Among these, -2 Tender Notices were self-invited, and 3 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ban quản lý cảng Bến Đầm has posted 5 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 5 package, canceled the bid 0 package (among the bidding packages above).
- There are 4 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Ban quản lý cảng Bến Đầm has a relationship with 9 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Ban quản lý cảng Bến Đầm has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects