Data analysis results of DauThau.info software for bid solicitors SOUTHERN VIETNAM POWER PROJECT MANAGEMENT BOARD as follows:
- Has relationships with 5 project owners.
- Has relationships with 142 contractor.
- Announced 4 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 250 contractor selection plans with a total of 774 bidding packages, of which 218 prequalification documents have not found the investment project.
- Has invited bids for 512 packages (with 530 tender notices), and conducted prequalification for 0 packages.
- There are 24 bidding packages with content that needs clarification.
- Announced the results of 395 package, and canceled bids for 2 packages (among the packages mentioned above).
- There are 151 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 642 packages that have not fully posted the contractor selection results. Of these 633 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.86 contractors.
- Breakdown by bidding field: Goods 40.75%, Construction 15.66%, Consultancy 27.74%, Non-consultancy 9.43%, Mixed 0.19%, Other fields 6.23%.
- The total value according to the packages with valid contractor selection results is: 8,241,090,153,203 VND, of which the total winning bid value is: 5,503,791,921,559 VND.
- The savings rate is: 33.22%.
Data analysis results of DauThau.info software for bid solicitors SOUTHERN VIETNAM POWER PROJECT MANAGEMENT BOARD as follows:
- Has relationships with 142 contractor.
- The average number of contractors participating in each bidding package is: 2.86 contractors.
- Proportion of bidding fields: Goods 40.75%, Construction 15.66%, Consulting 27.74%, Non-consulting 9.43%, Mixed 0.19%, Other 6.23%.
- The total value according to the bidding package with valid IMP is: 8,241,090,153,203 VND, in which the total winning value is: 5,503,791,921,559 VND.
- The savings rate is: 33.22%.
This Bid solicitor is also an investor. The analysis results of data for the investor SOUTHERN VIETNAM POWER PROJECT MANAGEMENT BOARD are as follows:
- Is the investor of 4 development investment projects.
- Is the investor of 26 contractor selection plans, of which 19 were self-published, and 7 were published by other entities.
- Is the investor of 225 Tender Notices, of which 138 were self-invited, and 87 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor SOUTHERN VIETNAM POWER PROJECT MANAGEMENT BOARD has posted the results of the bidding package Package 13: Supply and install the second VTTB, configure the integrated protection control system, TTLL and SCADA for the expansion compartment at SPP 220 kV Phu My ND (including transportation of the second VTTB) arrive of the investor SOUTHERN VIETNAM POWER PROJECT MANAGEMENT BOARD.
07/11/2022 15:48
The Bid solicitor SOUTHERN VIETNAM POWER PROJECT MANAGEMENT BOARD has posted the results of the bidding package Package 5: Auditing the completed project settlement report of the investor SOUTHERN VIETNAM POWER PROJECT MANAGEMENT BOARD.
- Winning bidder: Công ty TNHH kiểm toán và định giá Việt Nam
26/07/2022 16:50
The Bid solicitor SOUTHERN VIETNAM POWER PROJECT MANAGEMENT BOARD has posted the results of the bidding package Package 5: Auditing the completed project settlement report of the investor SOUTHERN VIETNAM POWER PROJECT MANAGEMENT BOARD.
- Winning bidder: Công ty TNHH kiểm toán và định giá Việt Nam
26/07/2022 16:47
The Bid solicitor SOUTHERN VIETNAM POWER PROJECT MANAGEMENT BOARD has posted the results of the bidding package Package No. 9: Supply of galvanized steel columns of the investor SOUTHERN VIETNAM POWER PROJECT MANAGEMENT BOARD.
26/07/2022 16:27
The Bid solicitor SOUTHERN VIETNAM POWER PROJECT MANAGEMENT BOARD has posted the results of the bidding package Package 6 "Construction and installation of T5 Tan Dinh M2" of the investor SOUTHERN VIETNAM POWER PROJECT MANAGEMENT BOARD.
- Winning bidder: Công ty cổ phần Alphanam E và C
26/07/2022 15:55
Bid solicitor SOUTHERN VIETNAM POWER PROJECT MANAGEMENT BOARD has posted Tender Notice Package 19: Supply and delivery of transformers 220 kV - 250 MVA of the investor SOUTHERN VIETNAM POWER PROJECT MANAGEMENT BOARD with the form National competitive bidding.
06/06/2022 11:36
The Bid solicitor SOUTHERN VIETNAM POWER PROJECT MANAGEMENT BOARD has posted the results of the bidding package Package 12: “Audit the completed project settlement report” of the investor SOUTHERN VIETNAM POWER PROJECT MANAGEMENT BOARD.
12/07/2021 08:19
The Bid solicitor SOUTHERN VIETNAM POWER PROJECT MANAGEMENT BOARD has posted the results of the bidding package Package 13: Transport of 220 kV-125 MVA transformer. of the investor SOUTHERN VIETNAM POWER PROJECT MANAGEMENT BOARD.
21/05/2021 16:28
Bid solicitor SOUTHERN VIETNAM POWER PROJECT MANAGEMENT BOARD has posted Tender Notice Package 13: Transport of 220 kV-125 MVA transformer. of the investor SOUTHERN VIETNAM POWER PROJECT MANAGEMENT BOARD with the form National competitive bidding.
23/04/2021 16:14
The Bid solicitor SOUTHERN VIETNAM POWER PROJECT MANAGEMENT BOARD has posted the results of the bidding package Package 12: Auditing the completed project settlement report. of the investor SOUTHERN VIETNAM POWER PROJECT MANAGEMENT BOARD.
09/03/2021 13:23
The data sheet has been partially hidden, to see the full information please Login or Register
SOUTHERN VIETNAM POWER PROJECT MANAGEMENT BOARD announced the results of the bid package Package 13: Supply and install the second VTTB, configure the integrated protection control system, TTLL and SCADA for the expansion compartment at SPP 220 kV Phu My ND (including transportation of the second VTTB) arrive .
- Winning bidder: CÔNG TY TNHH NNB VIỆT NAM, CÔNG TY TNHH THƯƠNG MẠI DỊCH VỤ VIỄN THÔNG HAI KẾT NỐI
07/11/2022 15:48
SOUTHERN VIETNAM POWER PROJECT MANAGEMENT BOARD publishes Tender Notice Package 13: Supply and install the second VTTB, configure the integrated protection control system, TTLL and SCADA for the expansion compartment at SPP 220 kV Phu My ND (including transportation of the second VTTB) arrive in the form National competitive bidding .
29/08/2022 15:50
SOUTHERN VIETNAM POWER PROJECT MANAGEMENT BOARD announced the results of the bidding package Tender package No 8: Configuration of integrated protection control system. with 1 participating contractors .
23/08/2022 10:39
SOUTHERN VIETNAM POWER PROJECT MANAGEMENT BOARD announced the results of the bidding package Package 17: Construction and installation from G22 to G30 (including G30) with 3 participating contractors .
16/08/2022 15:20
SOUTHERN VIETNAM POWER PROJECT MANAGEMENT BOARD publishes Tender Notice Tender package No 8: Configuration of integrated protection control system. in the form National competitive bidding .
02/08/2022 16:59
SOUTHERN VIETNAM POWER PROJECT MANAGEMENT BOARD announced the results of the bid package Package 5: Auditing the completed project settlement report .
- Winning bidder: Công ty TNHH kiểm toán và định giá Việt Nam
26/07/2022 16:50
SOUTHERN VIETNAM POWER PROJECT MANAGEMENT BOARD announced the results of the bid package Package 5: Auditing the completed project settlement report .
- Winning bidder: Công ty TNHH kiểm toán và định giá Việt Nam
26/07/2022 16:47
SOUTHERN VIETNAM POWER PROJECT MANAGEMENT BOARD announced the results of the bid package Package No. 9: Supply of galvanized steel columns .
- Winning bidder: Công ty cổ phần Tập đoàn Đầu tư Thương mại Công nghiệp Việt Á
26/07/2022 16:27
SOUTHERN VIETNAM POWER PROJECT MANAGEMENT BOARD announced the results of the bid package Package 6 "Construction and installation of T5 Tan Dinh M2" .
- Winning bidder: Công ty cổ phần Alphanam E và C
26/07/2022 15:55
SOUTHERN VIETNAM POWER PROJECT MANAGEMENT BOARD announced the results of the bidding package Package 14: Construction of clearing mines and explosives with 1 participating contractors .
22/07/2022 16:03
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor SOUTHERN VIETNAM POWER PROJECT MANAGEMENT BOARD has posted the results of the bidding package Package 13: Supply and install the second VTTB, configure the integrated protection control system, TTLL and SCADA for the expansion compartment at SPP 220 kV Phu My ND (including transportation of the second VTTB) arrive of the investor SOUTHERN VIETNAM POWER PROJECT MANAGEMENT BOARD.
07/11/2022 15:48
The Bid solicitor SOUTHERN VIETNAM POWER PROJECT MANAGEMENT BOARD has posted the results of the bidding package Package 5: Auditing the completed project settlement report of the investor SOUTHERN VIETNAM POWER PROJECT MANAGEMENT BOARD.
- Winning bidder: Công ty TNHH kiểm toán và định giá Việt Nam
26/07/2022 16:50
The Bid solicitor SOUTHERN VIETNAM POWER PROJECT MANAGEMENT BOARD has posted the results of the bidding package Package 5: Auditing the completed project settlement report of the investor SOUTHERN VIETNAM POWER PROJECT MANAGEMENT BOARD.
- Winning bidder: Công ty TNHH kiểm toán và định giá Việt Nam
26/07/2022 16:47
The Bid solicitor SOUTHERN VIETNAM POWER PROJECT MANAGEMENT BOARD has posted the results of the bidding package Package No. 9: Supply of galvanized steel columns of the investor SOUTHERN VIETNAM POWER PROJECT MANAGEMENT BOARD.
26/07/2022 16:27
The Bid solicitor SOUTHERN VIETNAM POWER PROJECT MANAGEMENT BOARD has posted the results of the bidding package Package 6 "Construction and installation of T5 Tan Dinh M2" of the investor SOUTHERN VIETNAM POWER PROJECT MANAGEMENT BOARD.
- Winning bidder: Công ty cổ phần Alphanam E và C
26/07/2022 15:55
Bid solicitor SOUTHERN VIETNAM POWER PROJECT MANAGEMENT BOARD has posted Tender Notice Package 19: Supply and delivery of transformers 220 kV - 250 MVA of the investor SOUTHERN VIETNAM POWER PROJECT MANAGEMENT BOARD with the form National competitive bidding.
06/06/2022 11:36
The Bid solicitor SOUTHERN VIETNAM POWER PROJECT MANAGEMENT BOARD has posted the results of the bidding package Package 12: “Audit the completed project settlement report” of the investor SOUTHERN VIETNAM POWER PROJECT MANAGEMENT BOARD.
12/07/2021 08:19
The Bid solicitor SOUTHERN VIETNAM POWER PROJECT MANAGEMENT BOARD has posted the results of the bidding package Package 13: Transport of 220 kV-125 MVA transformer. of the investor SOUTHERN VIETNAM POWER PROJECT MANAGEMENT BOARD.
21/05/2021 16:28
Bid solicitor SOUTHERN VIETNAM POWER PROJECT MANAGEMENT BOARD has posted Tender Notice Package 13: Transport of 220 kV-125 MVA transformer. of the investor SOUTHERN VIETNAM POWER PROJECT MANAGEMENT BOARD with the form National competitive bidding.
23/04/2021 16:14
The Bid solicitor SOUTHERN VIETNAM POWER PROJECT MANAGEMENT BOARD has posted the results of the bidding package Package 12: Auditing the completed project settlement report. of the investor SOUTHERN VIETNAM POWER PROJECT MANAGEMENT BOARD.
09/03/2021 13:23
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s SOUTHERN VIETNAM POWER PROJECT MANAGEMENT BOARD has posted 250 of the contractor selection plan, which contains 774 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor SOUTHERN VIETNAM POWER PROJECT MANAGEMENT BOARD has posted 530 Tender Notices in 512 bidding packages. Among these, 149 Tender Notices were self-invited, and 381 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor SOUTHERN VIETNAM POWER PROJECT MANAGEMENT BOARD has posted 395 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 395 package, canceled the bid 2 package (among the bidding packages above).
- There are 151 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor SOUTHERN VIETNAM POWER PROJECT MANAGEMENT BOARD has a relationship with 142 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor SOUTHERN VIETNAM POWER PROJECT MANAGEMENT BOARD has a relationship with 22 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity SOUTHERN VIETNAM POWER PROJECT MANAGEMENT BOARD has a relationship with 7 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects