Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for bid solicitors The Management Unit of Projects and Clearance in Economic Zone Area as follows:
- Has relationships with 41 contractor.
- Announced 1 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 15 contractor selection plans with a total of 25 bidding packages, of which 12 prequalification documents have not found the investment project.
- Has invited bids for 24 packages (with 26 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 18 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 1 packages with results that do not have tender notice or prequalification notice.
- There are 14 packages that have not fully posted the contractor selection results. Of these 10 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 3.05 contractors.
- Breakdown by bidding field: Goods 3.85%, Construction 53.85%, Consultancy 38.46%, Non-consultancy 3.85%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 264,598,109,000 VND, of which the total winning bid value is: 259,889,379,187 VND.
- The savings rate is: 1.78%.
Data analysis results of DauThau.info software for bid solicitors The Management Unit of Projects and Clearance in Economic Zone Area as follows:
- Has relationships with 41 contractor.
- The average number of contractors participating in each bidding package is: 3.05 contractors.
- Proportion of bidding fields: Goods 3.85%, Construction 53.85%, Consulting 38.46%, Non-consulting 3.85%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 264,598,109,000 VND, in which the total winning value is: 259,889,379,187 VND.
- The savings rate is: 1.78%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 1 investment and development projects.
- As the owner of 10 Contractor selection plan in which 10 Contractor selection plan is self-published, and 0 Contractor selection plan is posted by other units.
- Being the investor of 13 bidding packages in which 13 packages are self-invited, and 0 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
Bid solicitor The Management Unit of Projects and Clearance in Economic Zone Area has posted Tender Notice Consulting survey, making feasibility study report of the investor The Management Unit of Projects and Clearance in Economic Zone Area with the form Open bidding.
24/10/2024 11:08
The Bid solicitor The Management Unit of Projects and Clearance in Economic Zone Area has posted the request Contractor selection plan in preparation for investment of the investor The Management Unit of Projects and Clearance in Economic Zone Area with 3 bidding package.
24/10/2024 09:06
The Bid solicitor The Management Unit of Projects and Clearance in Economic Zone Area has posted the request Contractor selection plan in preparation for investment of the investor The Management Unit of Projects and Clearance in Economic Zone Area with 3 bidding package.
23/10/2024 15:35
Bid solicitor The Management Unit of Projects and Clearance in Economic Zone Area has posted Tender Notice Tender package No 01: Infrastructure repair construction of the investor The Management Unit of Projects and Clearance in Economic Zone Area with the form Competitive Offer.
08/10/2024 15:06
The Bid solicitor The Management Unit of Projects and Clearance in Economic Zone Area has posted the request Repair and maintenance of technical infrastructure works in Nhon Hoi Economic Zone in 2024 (phase 2) of the investor The Management Unit of Projects and Clearance in Economic Zone Area with 2 bidding package.
07/10/2024 15:15
Bid solicitor The Management Unit of Projects and Clearance in Economic Zone Area has posted Tender Notice Package 01: Procurement and installation of equipment of the investor The Management Unit of Projects and Clearance in Economic Zone Area with the form Open bidding.
25/09/2024 14:27
The Bid solicitor The Management Unit of Projects and Clearance in Economic Zone Area has posted the request Contractor selection plan Implementing the work of completing the equipment system of the automatic wastewater monitoring station at the centralized wastewater treatment plant in Nhon Hoi Industrial Park of the investor The Management Unit of Projects and Clearance in Economic Zone Area with 2 bidding package.
24/09/2024 11:00
The Bid solicitor The Management Unit of Projects and Clearance in Economic Zone Area has posted the request Contractor selection plan Implementing the work of completing the equipment system of the automatic wastewater monitoring station at the centralized wastewater treatment plant in Nhon Hoi Industrial Park of the investor The Management Unit of Projects and Clearance in Economic Zone Area with 2 bidding package.
05/09/2024 16:06
Bid solicitor The Management Unit of Projects and Clearance in Economic Zone Area has posted Tender Notice Prepare a report on the proposal for an environmental permit of the investor The Management Unit of Projects and Clearance in Economic Zone Area with the form Competitive Offer.
31/08/2024 14:46
The Bid solicitor The Management Unit of Projects and Clearance in Economic Zone Area has posted the request Plan for selecting contractors to prepare a Report proposing issuance of Environmental Permit of the investor The Management Unit of Projects and Clearance in Economic Zone Area with 1 bidding package.
30/08/2024 10:51
The data sheet has been partially hidden, to see the full information please Login or Register
The Management Unit of Projects and Clearance in Economic Zone Area publishes Tender Notice Consulting survey, making feasibility study report in the form Open bidding .
24/10/2024 11:08
The Management Unit of Projects and Clearance in Economic Zone Area publishes the plan Contractor selection plan in preparation for investment with 3 bidding package .
24/10/2024 09:06
The Management Unit of Projects and Clearance in Economic Zone Area publishes the plan Contractor selection plan in preparation for investment with 3 bidding package .
23/10/2024 15:35
The Management Unit of Projects and Clearance in Economic Zone Area announced the results of the bidding package Tender package No 01: Infrastructure repair construction with 3 participating contractors .
15/10/2024 09:00
The Management Unit of Projects and Clearance in Economic Zone Area announced the results of the bidding package Package 01: Procurement and installation of equipment with 7 participating contractors .
10/10/2024 10:46
The Management Unit of Projects and Clearance in Economic Zone Area publishes Tender Notice Tender package No 01: Infrastructure repair construction in the form Competitive Offer .
08/10/2024 15:06
The Management Unit of Projects and Clearance in Economic Zone Area publishes the plan Repair and maintenance of technical infrastructure works in Nhon Hoi Economic Zone in 2024 (phase 2) with 2 bidding package .
07/10/2024 15:15
The Management Unit of Projects and Clearance in Economic Zone Area publishes Tender Notice Package 01: Procurement and installation of equipment in the form Open bidding .
25/09/2024 14:27
The Management Unit of Projects and Clearance in Economic Zone Area publishes the plan Contractor selection plan Implementing the work of completing the equipment system of the automatic wastewater monitoring station at the centralized wastewater treatment plant in Nhon Hoi Industrial Park with 2 bidding package .
24/09/2024 11:00
The Management Unit of Projects and Clearance in Economic Zone Area publishes the plan Contractor selection plan Implementing the work of completing the equipment system of the automatic wastewater monitoring station at the centralized wastewater treatment plant in Nhon Hoi Industrial Park with 2 bidding package .
05/09/2024 16:06
The data sheet has been partially hidden, to see the full information please Login or Register
Bid solicitor The Management Unit of Projects and Clearance in Economic Zone Area has posted Tender Notice Consulting survey, making feasibility study report of the investor The Management Unit of Projects and Clearance in Economic Zone Area with the form Open bidding.
24/10/2024 11:08
The Bid solicitor The Management Unit of Projects and Clearance in Economic Zone Area has posted the request Contractor selection plan in preparation for investment of the investor The Management Unit of Projects and Clearance in Economic Zone Area with 3 bidding package.
24/10/2024 09:06
The Bid solicitor The Management Unit of Projects and Clearance in Economic Zone Area has posted the request Contractor selection plan in preparation for investment of the investor The Management Unit of Projects and Clearance in Economic Zone Area with 3 bidding package.
23/10/2024 15:35
Bid solicitor The Management Unit of Projects and Clearance in Economic Zone Area has posted Tender Notice Tender package No 01: Infrastructure repair construction of the investor The Management Unit of Projects and Clearance in Economic Zone Area with the form Competitive Offer.
08/10/2024 15:06
The Bid solicitor The Management Unit of Projects and Clearance in Economic Zone Area has posted the request Repair and maintenance of technical infrastructure works in Nhon Hoi Economic Zone in 2024 (phase 2) of the investor The Management Unit of Projects and Clearance in Economic Zone Area with 2 bidding package.
07/10/2024 15:15
Bid solicitor The Management Unit of Projects and Clearance in Economic Zone Area has posted Tender Notice Package 01: Procurement and installation of equipment of the investor The Management Unit of Projects and Clearance in Economic Zone Area with the form Open bidding.
25/09/2024 14:27
The Bid solicitor The Management Unit of Projects and Clearance in Economic Zone Area has posted the request Contractor selection plan Implementing the work of completing the equipment system of the automatic wastewater monitoring station at the centralized wastewater treatment plant in Nhon Hoi Industrial Park of the investor The Management Unit of Projects and Clearance in Economic Zone Area with 2 bidding package.
24/09/2024 11:00
The Bid solicitor The Management Unit of Projects and Clearance in Economic Zone Area has posted the request Contractor selection plan Implementing the work of completing the equipment system of the automatic wastewater monitoring station at the centralized wastewater treatment plant in Nhon Hoi Industrial Park of the investor The Management Unit of Projects and Clearance in Economic Zone Area with 2 bidding package.
05/09/2024 16:06
Bid solicitor The Management Unit of Projects and Clearance in Economic Zone Area has posted Tender Notice Prepare a report on the proposal for an environmental permit of the investor The Management Unit of Projects and Clearance in Economic Zone Area with the form Competitive Offer.
31/08/2024 14:46
The Bid solicitor The Management Unit of Projects and Clearance in Economic Zone Area has posted the request Plan for selecting contractors to prepare a Report proposing issuance of Environmental Permit of the investor The Management Unit of Projects and Clearance in Economic Zone Area with 1 bidding package.
30/08/2024 10:51
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s The Management Unit of Projects and Clearance in Economic Zone Area has posted 15 of the contractor selection plan, which contains 25 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor The Management Unit of Projects and Clearance in Economic Zone Area has posted 26 Tender Notice in the 24 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor The Management Unit of Projects and Clearance in Economic Zone Area has posted 18 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 18 package, canceled the bid 0 package (among the bidding packages above).
- There are 1 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor The Management Unit of Projects and Clearance in Economic Zone Area has a relationship with 41 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor The Management Unit of Projects and Clearance in Economic Zone Area has a relationship with 1 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor The Management Unit of Projects and Clearance in Economic Zone Area is the investor of 13 package, of which 13 package is self-invited, other units invite bid 0 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor The Management Unit of Projects and Clearance in Economic Zone Area is the owner of 10 contractor selection plan. In which, they self-invite 10 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
Summary: Investor The Management Unit of Projects and Clearance in Economic Zone Area is an investor with 34 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor The Management Unit of Projects and Clearance in Economic Zone Area is the investor of 1 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code