Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register
| Number | Business Registration ID ( on new Public Procuring System) | Tax ID | Consortium Name | Contractor's name | Bid price | Technical score | Winning price | Adjusted bid price after excess deviation correction | Bid package execution period | Contract Period | Contract date |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | vn0300602502 | 0300602502 |
CONSTRUCTION AND BUILDING MATERIASL NO 2 JOINT STOCK COMPANY |
9.889.005.368 VND | 9.889.005.368 VND | 90 day |
| Number | Business Registration ID ( on new Public Procuring System) | Tax ID | Consortium Name | Contractor's name | Reason for failure |
|---|---|---|---|---|---|
| 1 | vn3701864490 | 3701864490 | Hoàn Thành Phát - Thanh Bình | CÔNG TY TNHH XÂY DỰNG HOÀN THÀNH PHÁT | -Results of evaluation of the validity of E-HSDT: The contractor does not meet the bidding criteria in accordance with the regulations of E-HSMT. - Regarding capacity and experience (reference marks): Contractors do not meet the criteria for financial resources for the bidding package. - Technical (reference mark): + Technical solutions: Contractors do not meet the criteria for requirements on materials and construction materials (specified in Section III, Chapter V. The requirements of construction and installation) in accordance with E-HSMT. + Quality assurance measures: Contractors do not have quality guarantee measures in accordance with E-HSMT (contractors with quality guarantee measures. However, the contractor does not have a plan to check, accept and experiment as prescribed). + Construction progress: The contractor does not have a reasonable and feasible construction schedule in accordance with the technical proposal and meets the requirements of E-HSMT (the contractor does not have the explanation of proposing the mobilization of equipment and human resources in accordance with the construction progress and the contractor does not have a reasonable, feasible construction schedule and in accordance with the technical proposal and meets the requirements of E-HSMT). + Occupational safety, fire prevention, environmental sanitation: Contractors do not have occupational safety measures: Reasonable and feasible labor safety measures in accordance with the proposal on construction measures in accordance with the regulations of E-HSMT (contractors with labor safety explanation. (Details according to the attached report) |
| 2 | vn3702649231 | 3702649231 | Hoàn Thành Phát - Thanh Bình | CÔNG TY TNHH XÂY DỰNG DỊCH VỤ PHÒNG CHÁY CHỮA CHÁY THANH BÌNH | -Results of evaluation of the validity of E-HSDT: The contractor does not meet the bidding criteria in accordance with the regulations of E-HSMT. - Regarding capacity and experience (reference marks): Contractors do not meet the criteria for financial resources for the bidding package. - Technical (reference mark): + Technical solutions: Contractors do not meet the criteria for requirements on materials and construction materials (specified in Section III, Chapter V. The requirements of construction and installation) in accordance with E-HSMT. + Quality assurance measures: Contractors do not have quality guarantee measures in accordance with E-HSMT (contractors with quality guarantee measures. However, the contractor does not have a plan to check, accept and experiment as prescribed). + Construction progress: The contractor does not have a reasonable and feasible construction schedule in accordance with the technical proposal and meets the requirements of E-HSMT (the contractor does not have the explanation of proposing the mobilization of equipment and human resources in accordance with the construction progress and the contractor does not have a reasonable, feasible construction schedule and in accordance with the technical proposal and meets the requirements of E-HSMT). + Occupational safety, fire prevention, environmental sanitation: Contractors do not have occupational safety measures: Reasonable and feasible labor safety measures in accordance with the proposal on construction measures in accordance with the regulations of E-HSMT (contractors with labor safety explanation. (Details according to the attached report) |