Data analysis results of DauThau.info software for contractors \ are as follows:
You need to Login or Sign up to view all informations.
- Participated in 66 bidding packages, of which 59 were won, 3 were lost, 4 are pending results, and 0 were canceled.
- Total bid-winning value: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Lowest bid rate when participating: 85.02% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 99.45% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces participated in the bidding: Hà Nội (44), Bắc Ninh (2), Undefined (20)
- Has relationships with 22 Bid Solicitors
- Has competed against 29 contractors in 20 bidding packages, won 14 packages, lost 0 packages, 6 are pending results, and 0 were canceled.
- Has collaborated with 22 contractors in 20 bidding packages, won 19 packages, lost 0 packages, 1 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Building organization name: Công ty TNHH thiết kế xây dựng và thương mại Đức Thịnh
- Construction capacity certificate code: 00017566
- Issuing Authority: Sở Kế hoạch và Đầu tư thành phố Hà Nội
- Field:
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Competitiveness | ??? |
Enterprise scale | ??? |
Violation history | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
---|---|---|
Lower by 20% or more | 0 | 0% |
Lower by 10% to 20% | 2 | 3.4% |
Lower by 5% to 10% | 4 | 6.8% |
Lower by 1% to 5% | 6 | 10.2% |
Lower by 0% to 1% | 39 | 66.1% |
0% | 0 | 0% |
Higher by 0% to 1% | 1 | 1.7% |
Higher by 1% to 5% | 2 | 3.4% |
Higher by 5% to 10% | 2 | 3.4% |
Higher by 10% or more | 3 | 5.1% |
Unknown | 0 | 0% |
Total | 59 | 100% |
\ lost the bidding for the Construction package, which was invited for bidding by the Ban quản lý Dự án ĐTXD huyện Hoài Đức through an Open bidding as an independent entity.
- Result: Lost
23/10/2024 14:45
\ join for the Tender package No 04: Construction work package, which was invited for bidding by the ỦY BAN NHÂN DÂN XÃ LẠI YÊN through an Open bidding as an independent entity.
18/10/2024 10:49
\ Won the bidding for the Tender package No 03: Construction work package, which was invited for bidding by the Ban quản lý Dự án ĐTXD huyện Hoài Đức through an Open bidding as an independent entity.
- Result: Won
10/10/2024 16:02
\ Won the bidding for the Package No. 05: Construction of works and ensuring traffic safety package, which was invited for bidding by the Ban quản lý dự án đầu tư xây dựng huyện Quốc Oai through an Open bidding as sub-joint of CÔNG TY CỔ PHẦN THIẾT KẾ XÂY DỰNG VÀ THƯƠNG MẠI TẤT THỊNH. Two other contractors also participated.
- Result: Won
30/09/2024 18:06
\ Won the bidding for the No. 03: Construction works and ensuring traffic safety package, which was invited for bidding by the Ban quản lý dự án đầu tư xây dựng huyện Phúc Thọ through an Open bidding as an independent entity.
- Result: Won
23/09/2024 22:30
\ join for the Tender package No 03: Construction work package, which was invited for bidding by the Ban quản lý Dự án ĐTXD huyện Hoài Đức through an Open bidding as an independent entity. Two other contractors also participated.
12/08/2024 09:09
\ lost the bidding for the Number 06: Construction of works package, which was invited for bidding by the Ban quản lý dự án đầu tư xây dựng huyện Phúc Thọ through an Open bidding as an independent entity. Three other contractors also participated.
- Result: Lost
31/07/2024 08:02
\ lost the bidding for the Package No. 25: Construction work (line 2) package, which was invited for bidding by the Ban quản lý dự án đầu tư xây dựng Quận Bắc Từ Liêm through an Open bidding as sub-joint of CÔNG TY TNHH THIẾT KẾ XÂY DỰNG VÀ THƯƠNG MẠI ĐỨC THỊNH. Six other contractors also participated.
- Result: Lost
23/07/2024 10:37
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder \ participated in 66 package, of which 59 package was won, failed 3 packages, 4 packages with no results, 0 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor \ is related to 22 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor \ competed with 29 contractors in 20 package, won 14 package, lost 0 package, 6 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor \ once entered into a partnership with 22 contractors in 20 package, won bid 19 package, lost 0 package, 1 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor \ participated in bidding in 2 provinces/cities, 0 bidding packages were carried out nationwide, 0 bidding packages were carried out outside of Vietnam. The data table has been partially hidden, to see the full information please Login or Register
There are 63,681 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code