Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
History of active status changes
Data analysis results of DauThau.info software for contractors /. are as follows:
You need to Login or Sign up to view all informations.
- Participated in 60 bidding packages, of which 41 were won, 18 were lost, 1 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 49.31% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 99.69% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : An Giang (35), Cần Thơ (4), Đồng Tháp (5), Vĩnh Long (3), Tây Ninh (2), Cà Mau (1), Undefined (10)
- Provinces before the merger where the contractor has participated in bidding : An Giang (31), Cần Thơ (4), Kiên Giang (2), Đồng Tháp (4), Vĩnh Long (3), Tiền Giang (1), Trà Vinh (1), Long An (1), Bạc Liêu (1), Undefined (13)
- Has relationships with 20 Bid Solicitors
- Has relationships with 17 Bid Investors
- Has competed against 45 contractors in 57 bidding packages, won 38 packages, lost 18 packages, 1 are pending results, and 0 were canceled.
- Has collaborated with 5 contractors in 3 bidding packages, won 3 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 56 bidding packages with 21 roles.
- Building organization name: Công ty TNHH tư vấn đầu tư xây dựng B&V
- Construction capacity certificate code: 00002709
- Issuing Authority: Sở Kế hoạch và Đầu tư tỉnh An Giang
- Field:
⚬ Khảo sát xây dựng: Khảo sát địa hình
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Giao thông (cầu, đường bộ)
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Hạ tầng kỹ thuật (cấp nước, thoát nước)
⚬ Tư vấn giám sát thi công xây dựng công trình: Giao thông (cầu, đường bộ)
⚬ Tư vấn giám sát thi công xây dựng công trình: Dân dụng; phục vụ NN&PTNT; HTKT (cấp nước, thoát nước)
- Lab name: Construction materials laboratory and construction quality testing.
- Laboratory code: LAS-XD 946
- Certifications:
⚬
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 9 | 0% |
| Lower by 10% to 20% | 0 | |
| Lower by 5% to 10% | 1 | 0% |
| Lower by 1% to 5% | 6 | 0% |
| Lower by 0% to 1% | 12 | 0% |
| 0% | 13 | 0% |
| Higher by 0% to 1% | 0 | |
| Higher by 1% to 5% | 0 | |
| Higher by 5% to 10% | 0 | |
| Higher by 10% or more | 0 | |
| Unknown | 0 | |
| Total | 41 | 100% |
/. join for the Construction supervision consultancy package, which was invited for bidding by the KHU QUẢN LÝ ĐƯỜNG BỘ IV through an as an independent entity. Four other contractors also participated.
10/08/2026 09:36
/. Won the bidding for the Package No. 02: Verification of technical and economic reports on investment in construction works. Partial repair of road surface sections Km11+800 - Km14+000, provincial road 951 package, which was invited for bidding by the Sở Xây dựng An Giang through an as an independent entity.
- Result: Won
05/07/2026 22:58
/. Won the bidding for the Package No. 02: Verification of technical and economic reports on investment in construction works. Partial repair of road surface section Km3+550 Km6+400, provincial road 946 package, which was invited for bidding by the Sở Xây dựng An Giang through an as an independent entity.
- Result: Won
05/07/2026 22:47
/. Won the bidding for the Verification of economic and technical reports on construction investment: Repairing damage to the foundation and road surface of sections Km88 + 360 - Km89 + 928, Km92 + 245 - Km92 + 690, Km92 + 943 - Km93 + 742, National Highway 80B package, which was invited for bidding by the Sở Xây dựng An Giang through an as an independent entity.
- Result: Won
05/07/2026 22:41
/. Won the bidding for the Package No. 02: Verification of economic and technical reports on construction investment: Repairing damage to the foundation and road surface of sections Km63+520 - Km65+280, Km65+749 - Km65+915, National Highway 80B package, which was invited for bidding by the Sở Xây dựng An Giang through an as an independent entity.
- Result: Won
05/07/2026 22:33
/. Won the bidding for the Package No. 02: Verification of economic and technical report on investment in construction of Reinforcement and landslide recovery works on the National Highway
91 (Nang Gu annex), Binh My commune, An Giang province package, which was invited for bidding by the Sở Xây dựng An Giang through an as an independent entity.
- Result: Won
05/07/2026 00:10
/. Won the bidding for the Package No. 02: Verification of technical and economic reports on construction investment Unscheduled repairs, ensuring traffic safety
clearing embankments and landslides of roadbeds and national highway 91 package, which was invited for bidding by the Sở Xây dựng An Giang through an as an independent entity.
- Result: Won
05/07/2026 00:05
/. Won the bidding for the Bidding package No. 02: Verification of economic and technical reports on construction investment package, which was invited for bidding by the Sở Xây dựng An Giang through an as an independent entity.
- Result: Won
04/07/2026 23:58
/. Won the bidding for the Bidding package No. 01: Survey and prepare economic and technical reports for construction investment package, which was invited for bidding by the Sở Xây dựng An Giang through an as an independent entity.
- Result: Won
29/06/2026 21:15
/. Won the bidding for the Bidding package No. 01: Survey and prepare economic and technical reports for construction investment package, which was invited for bidding by the Sở Xây dựng An Giang through an as an independent entity.
- Result: Won
06/05/2026 17:46
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder /. participated in 60 package, of which 41 package was won, failed 18 packages, 1 packages with no results, 0 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor /. is related to 20 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor /. has a relationship with 17 the investor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor /. competed with 45 contractors in 57 package, won 38 package, lost 18 package, 1 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor /. once entered into a partnership with 5 contractors in 3 package, won bid 3 package, lost 0 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor /. participated in bidding in 6 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor /. participated in bidding in 9 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 71,201 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
Add contractor