Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
History of active status changes
| Updated time | Active status | Lý do |
|---|---|---|
|
9:55 AM 11/18/2022 |
Pause |
Temporarily suspended due to overdue fees |
|
4:12 PM 11/18/2022 |
Active |
At the request of QTHT |
|
8:32 AM 01/30/2023 |
Pause |
Temporarily suspended due to overdue fees |
|
11:50 AM 01/30/2023 |
Active |
At the request of QTHT |
|
1:59 AM 07/01/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
4:10 PM 07/18/2024 |
Active |
At the request of QTHT |
|
1:10 AM 04/01/2025 |
Pause |
Temporarily suspended due to overdue fees |
Data analysis results of DauThau.info software for contractors AN NGAI MECHANICS AND CONSTRUCTION JOINT STOCK COMPANY are as follows:
You need to Login or Sign up to view all informations.
- Participated in 486 bidding packages, of which 166 were won, 312 were lost, 5 are pending results, and 3 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 14.88% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 94.05% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Quảng Ngãi (79), TP.Hồ Chí Minh (64), Đồng Tháp (62), Gia Lai (45), Đà Nẵng (40), Lâm Đồng (37), Khánh Hòa (12), Đắk Lắk (8), Quảng Trị (5), Tây Ninh (4), Cà Mau (2), An Giang (2), Cần Thơ (1), Huế (1), Undefined (125)
- Provinces before the merger where the contractor has participated in bidding : Quảng Ngãi (68), Tiền Giang (61), Bà Rịa - Vũng Tàu (45), Bình Định (38), Bình Thuận (33), Đà Nẵng (26), Quảng Nam (14), TP.Hồ Chí Minh (12), Khánh Hòa (11), Kon Tum (11), Bình Dương (7), Gia Lai (7), Phú Yên (6), Quảng Trị (5), Long An (4), Đắk Nông (4), Đắk Lắk (2), Hậu Giang (1), Cà Mau (1), Kiên Giang (1), Bạc Liêu (1), Ninh Thuận (1), Huế (1), An Giang (1), Đồng Tháp (1), Undefined (125)
- Has relationships with 76 Bid Solicitors
- Has relationships with 43 Bid Investors
- Has competed against 275 contractors in 404 bidding packages, won 86 packages, lost 312 packages, 3 are pending results, and 3 were canceled.
- Has collaborated with 35 contractors in 90 bidding packages, won 51 packages, lost 37 packages, 2 are pending results, and 0 were canceled.
- Received 1 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 20 bidding packages with 8 roles.
- Building organization name: CÔNG TY CỔ PHẦN CƠ KHÍ VÀ XÂY LẮP AN NGÃI
- Construction capacity certificate code: 00002628
- Issuing Authority: Sở Kế hoạch và Đầu tư tỉnh Quảng Ngãi
- Field:
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Hạ tầng kỹ thuật (hệ thống chiếu sáng)
⚬ Khảo sát xây dựng: Địa hình
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Công nghiệp Năng lượng (Đường dây và TBA)
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Dân dụng
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Công nghiệp (nhẹ)
⚬ Giám sát thi công xây dựng công trình: Công nghiệp Năng lượng (Đường dây và TBA)
⚬ Thi công xây dựng công trình: Công nghiệp Năng lượng (Đường dây và TBA)
⚬ Thi công xây dựng công trình: Dân dụng
⚬ Thi công xây dựng công trình: Công nghiệp
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 41 | 24.7% |
| Lower by 10% to 20% | 18 | 10.8% |
| Lower by 5% to 10% | 33 | 19.9% |
| Lower by 1% to 5% | 43 | 25.9% |
| Lower by 0% to 1% | 17 | 10.2% |
| 0% | 4 | 2.4% |
| Higher by 0% to 1% | 2 | 1.2% |
| Higher by 1% to 5% | 0 | 0% |
| Higher by 5% to 10% | 0 | 0% |
| Higher by 10% or more | 8 | 4.8% |
| Unknown | 0 | 0% |
| Total | 166 | 100% |
AN NGAI MECHANICS AND CONSTRUCTION JOINT STOCK COMPANY lost the bidding for the Package No. 03/TV: Supervision of construction and equipment installation of projects: Completing and preventing overloading of the power grid in Ly Son district in 2025; Investing in additional 22kV feeders after Quang Ngai 110kV substation in 2025 package, which was invited for bidding by the POWER COMPANY OF QUANG NGAI – BRANCH OF CENTRAL POWER CORPORATION through an Open bidding as an independent entity. One other contractors also participated.
- Result: Lost
12/12/2024 09:46
AN NGAI MECHANICS AND CONSTRUCTION JOINT STOCK COMPANY lost the bidding for the Package No. 03/TV: Supervision of construction and equipment installation of projects: Completing and preventing overloading of the power grid in Duc Pho town area in 2025; Improve electricity supply reliability in Duc Pho town area by 2025 package, which was invited for bidding by the POWER COMPANY OF QUANG NGAI – BRANCH OF CENTRAL POWER CORPORATION through an Open bidding as an independent entity. Two other contractors also participated.
- Result: Lost
12/12/2024 09:01
AN NGAI MECHANICS AND CONSTRUCTION JOINT STOCK COMPANY lost the bidding for the Package No. 03/TV: Supervision of construction and equipment installation of projects: Completing and preventing overloading of the power grid in Ba To district in 2025; Complete and prevent overloading of the power grid in Nghia Hanh and Minh Long districts by 2025 package, which was invited for bidding by the POWER COMPANY OF QUANG NGAI – BRANCH OF CENTRAL POWER CORPORATION through an Open bidding as an independent entity. One other contractors also participated.
- Result: Lost
12/12/2024 08:34
AN NGAI MECHANICS AND CONSTRUCTION JOINT STOCK COMPANY lost the bidding for the Package No. 03/TV: Supervision of construction and equipment installation of projects: Completing and preventing overloading of the power grid in Son Tinh district in 2025; Improve electricity supply reliability in Son Tinh district by 2025 package, which was invited for bidding by the POWER COMPANY OF QUANG NGAI – BRANCH OF CENTRAL POWER CORPORATION through an Open bidding as an independent entity. Two other contractors also participated.
- Result: Lost
12/12/2024 08:19
AN NGAI MECHANICS AND CONSTRUCTION JOINT STOCK COMPANY join for the Package No. 03/TV: Supervision of construction and equipment installation of projects: Completing and preventing overloading of the power grid in Ly Son district in 2025; Investing in additional 22kV feeders after Quang Ngai 110kV substation in 2025 package, which was invited for bidding by the POWER COMPANY OF QUANG NGAI – BRANCH OF CENTRAL POWER CORPORATION through an Open bidding as an independent entity. One other contractors also participated.
- Result: Tender opening completed
13/11/2024 08:47
AN NGAI MECHANICS AND CONSTRUCTION JOINT STOCK COMPANY join for the Package No. 03/TV: Supervision of construction and equipment installation of projects: Completing and preventing overloading of the power grid in Ba To district in 2025; Complete and prevent overloading of the power grid in Nghia Hanh and Minh Long districts by 2025 package, which was invited for bidding by the POWER COMPANY OF QUANG NGAI – BRANCH OF CENTRAL POWER CORPORATION through an Open bidding as an independent entity. One other contractors also participated.
- Result: Tender opening completed
13/11/2024 08:46
AN NGAI MECHANICS AND CONSTRUCTION JOINT STOCK COMPANY join for the Package No. 03/TV: Supervision of construction and equipment installation of projects: Completing and preventing overloading of the power grid in Son Tinh district in 2025; Improve electricity supply reliability in Son Tinh district by 2025 package, which was invited for bidding by the POWER COMPANY OF QUANG NGAI – BRANCH OF CENTRAL POWER CORPORATION through an Open bidding as an independent entity. Two other contractors also participated.
- Result: Tender opening completed
13/11/2024 08:45
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder AN NGAI MECHANICS AND CONSTRUCTION JOINT STOCK COMPANY participated in 486 package, of which 166 package was won, failed 312 packages, 5 packages with no results, 3 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor AN NGAI MECHANICS AND CONSTRUCTION JOINT STOCK COMPANY is related to 76 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor AN NGAI MECHANICS AND CONSTRUCTION JOINT STOCK COMPANY has a relationship with 43 the investor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor AN NGAI MECHANICS AND CONSTRUCTION JOINT STOCK COMPANY competed with 275 contractors in 404 package, won 86 package, lost 312 package, 3 bidding package has no results, 3 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor AN NGAI MECHANICS AND CONSTRUCTION JOINT STOCK COMPANY once entered into a partnership with 35 contractors in 90 package, won bid 51 package, lost 37 package, 2 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor AN NGAI MECHANICS AND CONSTRUCTION JOINT STOCK COMPANY participated in bidding in 14 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor AN NGAI MECHANICS AND CONSTRUCTION JOINT STOCK COMPANY participated in bidding in 25 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 72,215 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
Add contractor