Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
History of active status changes
| Updated time | Active status | Lý do |
|---|---|---|
|
9:54 AM 11/18/2022 |
Pause |
Temporarily suspended due to overdue fees |
|
8:42 AM 11/23/2022 |
Active |
At the request of QTHT |
|
12:01 AM 05/14/2023 |
Pause |
Temporarily suspended due to overdue fees |
|
3:38 PM 05/23/2023 |
Active |
At the request of QTHT |
|
12:17 AM 07/18/2023 |
Pause |
Temporarily suspended due to overdue fees |
|
9:22 AM 07/21/2023 |
Active |
At the request of QTHT |
|
12:09 AM 08/11/2023 |
Pause |
Temporarily suspended due to overdue fees |
|
9:39 AM 08/25/2023 |
Active |
At the request of QTHT |
|
12:04 AM 10/07/2023 |
Pause |
Temporarily suspended due to overdue fees |
|
8:17 AM 10/09/2023 |
Active |
At the request of QTHT |
|
12:11 AM 10/26/2023 |
Pause |
Temporarily suspended due to overdue fees |
|
3:31 PM 11/02/2023 |
Active |
At the request of QTHT |
|
11:43 PM 12/23/2023 |
Pause |
Temporarily suspended due to overdue fees |
|
4:29 PM 01/01/2024 |
Active |
At the request of QTHT |
|
11:30 PM 01/17/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
2:08 PM 01/23/2024 |
Active |
At the request of QTHT |
|
11:30 PM 03/27/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
4:49 PM 04/08/2024 |
Active |
At the request of QTHT |
|
12:05 AM 06/08/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
11:42 AM 06/11/2024 |
Active |
At the request of QTHT |
|
12:05 AM 06/27/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
8:31 AM 06/29/2024 |
Active |
At the request of QTHT |
Data analysis results of DauThau.info software for contractors BAC DO CONSTRUCTION JOINT STOCK COMPANY are as follows:
You need to Login or Sign up to view all informations.
- Participated in 141 bidding packages, of which 77 were won, 60 were lost, 2 are pending results, and 2 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 42.29% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 96.07% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Hà Nội (26), Phú Thọ (17), Tuyên Quang (9), Lạng Sơn (8), Khánh Hòa (8), Hưng Yên (7), Lâm Đồng (6), TP.Hồ Chí Minh (4), Lai Châu (4), Đà Nẵng (4), Điện Biên (4), Cao Bằng (3), Bắc Ninh (3), Hải Phòng (3), Thanh Hoá (2), An Giang (2), Thái Nguyên (1), Đắk Lắk (1), Đồng Nai (1), Quảng Ninh (1), Vĩnh Long (1), Ninh Bình (1), Undefined (25)
- Provinces before the merger where the contractor has participated in bidding : Hà Nội (26), Hòa Bình (9), Lạng Sơn (8), Tuyên Quang (5), Ninh Thuận (5), Hà Giang (4), Lai Châu (4), Thái Bình (4), Phú Thọ (4), Vĩnh Phúc (4), Đà Nẵng (4), Lâm Đồng (4), Điện Biên (4), TP.Hồ Chí Minh (3), Cao Bằng (3), Hưng Yên (3), Bắc Giang (3), Hải Phòng (3), Khánh Hòa (3), Thanh Hoá (2), Kiên Giang (2), Bình Thuận (2), Bắc Kạn (1), Phú Yên (1), Đồng Nai (1), Quảng Ninh (1), Bến Tre (1), Ninh Bình (1), Undefined (26)
- Has relationships with 72 Bid Solicitors
- Has competed against 132 contractors in 105 bidding packages, won 41 packages, lost 59 packages, 3 are pending results, and 2 were canceled.
- Has collaborated with 33 contractors in 34 bidding packages, won 24 packages, lost 10 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 28 bidding packages with 3 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 4 | 5.2% |
| Lower by 10% to 20% | 3 | 3.9% |
| Lower by 5% to 10% | 15 | 19.5% |
| Lower by 1% to 5% | 25 | 32.5% |
| Lower by 0% to 1% | 24 | 31.2% |
| 0% | 4 | 5.2% |
| Higher by 0% to 1% | 0 | 0% |
| Higher by 1% to 5% | 1 | 1.3% |
| Higher by 5% to 10% | 1 | 1.3% |
| Higher by 10% or more | 0 | 0% |
| Unknown | 0 | 0% |
| Total | 77 | 100% |
BAC DO CONSTRUCTION JOINT STOCK COMPANY lost the bidding for the Equipping infrastructure for online payment gateway system package, which was invited for bidding by the CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC MIỀN NAM TNHH - CÔNG TY CÔNG NGHỆ THÔNG TIN ĐIỆN LỰC MIỀN NAM through an Open bidding as an independent entity. Two other contractors also participated.
- Result: Lost
17/12/2025 00:58
BAC DO CONSTRUCTION JOINT STOCK COMPANY join for the Equipping infrastructure for online payment gateway system package, which was invited for bidding by the CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC MIỀN NAM TNHH - CÔNG TY CÔNG NGHỆ THÔNG TIN ĐIỆN LỰC MIỀN NAM through an Open bidding as an independent entity. Two other contractors also participated.
- Result: Tender opening completed
29/11/2025 19:46
BAC DO CONSTRUCTION JOINT STOCK COMPANY Won the bidding for the Equipped with replacement infrastructure system HP C7000 system and dedicated offline data backup system package, which was invited for bidding by the southern power corporation through an Open bidding as sub-joint of Liên danh PIDI - BACDO. Five other contractors also participated.
- Result: Won
12/06/2025 08:02
BAC DO CONSTRUCTION JOINT STOCK COMPANY lost the bidding for the Supply and installation of equipment and construction materials: Repairing medium-voltage branches 471TC, 473TC and 475TC in Phan Rang-Thap Cham Electricity in 2025 package, which was invited for bidding by the CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC MIỀN NAM TNHH - CÔNG TY ĐIỆN LỰC NINH THUẬN through an Open bidding as an independent entity. One other contractors also participated.
- Result: Lost
19/05/2025 17:57
BAC DO CONSTRUCTION JOINT STOCK COMPANY lost the bidding for the Supply and installation of equipment and supplies and construction works: Repairing the distribution grid of Phan Rang-Thap Cham Power Area in 2025 (supplementation) package, which was invited for bidding by the CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC MIỀN NAM TNHH - CÔNG TY ĐIỆN LỰC NINH THUẬN through an Open bidding as an independent entity. One other contractors also participated.
- Result: Lost
19/05/2025 17:57
BAC DO CONSTRUCTION JOINT STOCK COMPANY join for the Supply and installation of equipment and supplies and construction works: Repairing the distribution grid of Phan Rang-Thap Cham Power Area in 2025 (supplementation) package, which was invited for bidding by the CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC MIỀN NAM TNHH - CÔNG TY ĐIỆN LỰC NINH THUẬN through an Open bidding as an independent entity. One other contractors also participated.
- Result: Tender opening completed
12/05/2025 08:32
BAC DO CONSTRUCTION JOINT STOCK COMPANY join for the Supply and installation of equipment and construction materials: Repairing medium-voltage branches 471TC, 473TC and 475TC in Phan Rang-Thap Cham Electricity in 2025 package, which was invited for bidding by the CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC MIỀN NAM TNHH - CÔNG TY ĐIỆN LỰC NINH THUẬN through an Open bidding as an independent entity. One other contractors also participated.
- Result: Tender opening completed
12/05/2025 08:31
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder BAC DO CONSTRUCTION JOINT STOCK COMPANY participated in 141 package, of which 77 package was won, failed 60 packages, 2 packages with no results, 2 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor BAC DO CONSTRUCTION JOINT STOCK COMPANY is related to 72 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor BAC DO CONSTRUCTION JOINT STOCK COMPANY competed with 132 contractors in 105 package, won 41 package, lost 59 package, 3 bidding package has no results, 2 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor BAC DO CONSTRUCTION JOINT STOCK COMPANY once entered into a partnership with 33 contractors in 34 package, won bid 24 package, lost 10 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor BAC DO CONSTRUCTION JOINT STOCK COMPANY participated in bidding in 22 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor BAC DO CONSTRUCTION JOINT STOCK COMPANY participated in bidding in 28 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 68,759 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects
Add contractor