Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
History of active status changes
Data analysis results of DauThau.info software for contractors BACKSTAGE EVENT COMPANY LIMITED are as follows:
You need to Login or Sign up to view all informations.
- Participated in 33 bidding packages, of which 19 were won, 14 were lost, 0 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 72.6% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 95.4% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Quảng Ngãi (3), Huế (3), Đà Nẵng (20), Quảng Trị (2), Hải Phòng (1), TP.Hồ Chí Minh (2), Tuyên Quang (1), Hà Nội (1)
- Provinces before the merger where the contractor has participated in bidding : Kon Tum (3), Huế (3), Đà Nẵng (9), Quảng Nam (8), Quảng Trị (1), Hải Dương (1), Bà Rịa - Vũng Tàu (1), Hà Nội (1), Undefined (7)
- Has relationships with 13 Bid Solicitors
- Has relationships with 13 Bid Investors
- Has competed against 32 contractors in 32 bidding packages, won 19 packages, lost 13 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 0 contractors in 1 bidding packages, won 0 packages, lost 1 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 1 bidding packages with 1 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 1 | 0% |
| Lower by 10% to 20% | 1 | 0% |
| Lower by 5% to 10% | 0 | |
| Lower by 1% to 5% | 1 | 0% |
| Lower by 0% to 1% | 1 | 0% |
| 0% | 15 | 0% |
| Higher by 0% to 1% | 0 | |
| Higher by 1% to 5% | 0 | |
| Higher by 5% to 10% | 0 | |
| Higher by 10% or more | 0 | |
| Unknown | 0 | |
| Total | 19 | 100% |
BACKSTAGE EVENT COMPANY LIMITED Won the bidding for the Package No. 02: Supply of technical equipment for art programs serving the summer festival package, which was invited for bidding by the Trung Tâm Dịch Vụ Sự Nghiệp Công Phường Vỹ Dạ through an as an independent entity.
- Result: Won
04/07/2026 17:04
BACKSTAGE EVENT COMPANY LIMITED Won the bidding for the Providing stage services, tables and chairs, ceremonies and organizing the 2026 worker market package, which was invited for bidding by the LIÊN ĐOÀN LAO ĐỘNG THÀNH PHỐ ĐÀ NẴNG through an as an independent entity.
- Result: Won
01/06/2026 15:47
BACKSTAGE EVENT COMPANY LIMITED Won the bidding for the Providing services for organizing the opening art program of the culinary festival "Vi Bien" in the Da Nang Food Tour 2026 Festival package, which was invited for bidding by the DA NANG TOURISM PROMOTION CENTER through an as an independent entity.
- Result: Won
06/05/2026 09:36
BACKSTAGE EVENT COMPANY LIMITED Won the bidding for the Bidding package: Renting human resources services, recording equipment for the cultural parade stage on the bridge and live broadcasting of the canoe chasing performance stage under the water to serve the live broadcast of the Gala program "Peaceful Fatherland" package, which was invited for bidding by the TRUNG TÂM TRUYỀN HÌNH VIỆT NAM KHU VỰC MIỀN TRUNG - TÂY NGUYÊN (VTV8) through an as an independent entity.
- Result: Won
01/05/2026 21:42
BACKSTAGE EVENT COMPANY LIMITED Won the bidding for the Carrying out booth construction for the 22nd Ho Chi Minh City Tourism Festival in 2026; package, which was invited for bidding by the DA NANG TOURISM PROMOTION CENTER through an as an independent entity.
- Result: Won
27/03/2026 16:28
BACKSTAGE EVENT COMPANY LIMITED Won the bidding for the Bidding package: Design and decoration of film sets for production
Tet TV program "Welcome Spring 2026" package, which was invited for bidding by the BÁO VÀ PHÁT THANH, TRUYỀN HÌNH ĐÀ NẴNG through an as an independent entity.
- Result: Won
13/02/2026 06:27
BACKSTAGE EVENT COMPANY LIMITED Won the bidding for the Bidding package: "Implementation of identification kit; virtualization of stage and stage effects; rental and operation of sound and lighting systems for live television broadcast of the program "Quang Trung Campaign: Command of the Heart" on VTV8 channel package, which was invited for bidding by the TRUNG TÂM TRUYỀN HÌNH VIỆT NAM KHU VỰC MIỀN TRUNG - TÂY NGUYÊN (VTV8) through an as an independent entity.
- Result: Won
15/01/2026 09:46
BACKSTAGE EVENT COMPANY LIMITED Won the bidding for the Providing rental and construction services for the New Year Colors cluster at the Da Nang New Year Festival 2026 package, which was invited for bidding by the DA NANG TOURISM PROMOTION CENTER through an as an independent entity.
- Result: Won
24/12/2025 16:02
BACKSTAGE EVENT COMPANY LIMITED lost the bidding for the Bid package: Production of documentaries about traditional culture of ethnic minorities in the Central - Central Highlands region, broadcast on television channels and electronic information platforms of Vietnam Television under the National Target Program for socio-economic development of ethnic minority and mountainous areas by 2025 package, which was invited for bidding by the Trung tâm Thông tin, Truyền thông Văn hóa dân tộc through an as an independent entity.
- Result: Lost
30/11/2025 09:54
BACKSTAGE EVENT COMPANY LIMITED Won the bidding for the Bidding package: "Design and construction of stages for television programs promoting safe traffic skills through the development of the program "If only I had known in advance" package, which was invited for bidding by the TRUNG TÂM TRUYỀN HÌNH VIỆT NAM KHU VỰC MIỀN TRUNG - TÂY NGUYÊN (VTV8) through an as an independent entity.
- Result: Won
28/11/2025 17:05
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder BACKSTAGE EVENT COMPANY LIMITED participated in 33 package, of which 19 package was won, failed 14 packages, 0 packages with no results, 0 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor BACKSTAGE EVENT COMPANY LIMITED is related to 13 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor BACKSTAGE EVENT COMPANY LIMITED has a relationship with 21 the investor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor BACKSTAGE EVENT COMPANY LIMITED competed with 32 contractors in 32 package, won 19 package, lost 13 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor BACKSTAGE EVENT COMPANY LIMITED participated in bidding in 8 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor BACKSTAGE EVENT COMPANY LIMITED participated in bidding in 8 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 71,201 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
Add contractor