Data analysis results of DauThau.info software for contractors BINH MINH INVESTMENT CONSTRUCTION AND TECHNOLOGY JOINT STOCK COMPANY are as follows:
You need to Login or Sign up to view all informations.
- Participated in 75 bidding packages, of which 75 were won, 0 were lost, 0 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 74.99% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 111.48% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Hà Nội (33), Thái Nguyên (4), Lào Cai (3), Hải Phòng (2), Hưng Yên (2), Lạng Sơn (1), Cần Thơ (1), Bắc Ninh (1), Nghệ An (1), Undefined (27)
- Provinces before the merger where the contractor has participated in bidding : Hà Nội (33), Lào Cai (3), Hải Phòng (2), Thái Bình (2), Lạng Sơn (1), Cần Thơ (1), Bắc Ninh (1), Nghệ An (1), Undefined (31)
- Has relationships with 20 Bid Solicitors
- Has relationships with 32 Bid Investors
- Has competed against 8 contractors in 4 bidding packages, won 4 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 9 contractors in 11 bidding packages, won 11 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 53 bidding packages with 15 roles.
- Building organization name: CÔNG TY CỔ PHẦN ĐẦU TƯ XÂY DỰNG VÀ CÔNG NGHỆ BÌNH MINH
- Construction capacity certificate code: 00055509
- Issuing Authority: Sở Kế hoạch và Đầu tư thành phố Hà Nội
- Field:
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Thiết kế, thẩm tra thiết kế xây dựng công trình: dân dụng; nhà công nghiệp; công nghiệp năng lượng; đường bộ; cầu; cấp nước - thoát nước; xử lý chất thải rắn.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 1 | 1.3% |
| Lower by 10% to 20% | 0 | 0% |
| Lower by 5% to 10% | 5 | 6.7% |
| Lower by 1% to 5% | 18 | 24% |
| Lower by 0% to 1% | 16 | 21.3% |
| 0% | 34 | 45.3% |
| Higher by 0% to 1% | 0 | 0% |
| Higher by 1% to 5% | 0 | 0% |
| Higher by 5% to 10% | 0 | 0% |
| Higher by 10% or more | 1 | 1.3% |
| Unknown | 0 | 0% |
| Total | 75 | 100% |
BINH MINH INVESTMENT CONSTRUCTION AND TECHNOLOGY JOINT STOCK COMPANY Won the bidding for the Package No. 05: Consulting on construction drawing design and construction estimates package, which was invited for bidding by the Ban Quản lý Dự án đầu tư - Hạ tầng xã Phù Đổng through an Open bidding as sub-joint of Liên danh Bình Minh - Vicco HTC.
- Result: Won
22/08/2026 16:09
BINH MINH INVESTMENT CONSTRUCTION AND TECHNOLOGY JOINT STOCK COMPANY Won the bidding for the Package 02: Consultancy and verification of economic - technical reports package, which was invited for bidding by the Ban quản lý Dự án đầu tư - hạ tầng phường Nghĩa Đô through an assign shorthand as an independent entity.
- Result: Won
19/08/2026 14:33
BINH MINH INVESTMENT CONSTRUCTION AND TECHNOLOGY JOINT STOCK COMPANY Won the bidding for the Package 02: Consultancy and verification of economic - technical reports package, which was invited for bidding by the Ban quản lý Dự án đầu tư - hạ tầng phường Nghĩa Đô through an assign shorthand as an independent entity.
- Result: Won
19/08/2026 14:30
BINH MINH INVESTMENT CONSTRUCTION AND TECHNOLOGY JOINT STOCK COMPANY Won the bidding for the Prepare technical economic report, construction drawing design documents and project estimates: Installing mobilab garage of KDHQ Team 1 (No. 162 Nguyen Van Cu - Hanoi) package, which was invited for bidding by the Chi cục Kiểm định hải quan through an assign shorthand as an independent entity.
- Result: Won
10/07/2026 15:33
BINH MINH INVESTMENT CONSTRUCTION AND TECHNOLOGY JOINT STOCK COMPANY Won the bidding for the Supervision consultancy package, which was invited for bidding by the VIETNAM POSTS AND TELECOMMUNICATIONS GROUP through an assign shorthand as an independent entity.
- Result: Won
22/06/2026 17:08
BINH MINH INVESTMENT CONSTRUCTION AND TECHNOLOGY JOINT STOCK COMPANY Won the bidding for the Bidding package No. 04: Consulting on surveys, preparing construction drawing design documents and project estimates package, which was invited for bidding by the Ban Quản lý dự án phường Linh Sơn through an assign shorthand as sub-joint of Liên danh Thái Nguyên - Bình Minh.
- Result: Won
17/06/2026 15:25
BINH MINH INVESTMENT CONSTRUCTION AND TECHNOLOGY JOINT STOCK COMPANY Won the bidding for the Package No. 03: Consulting on survey and assessment of current status, preparation of feasibility study report package, which was invited for bidding by the Ban Quản lý Dự án đầu tư - Hạ tầng xã Phù Đổng through an assign shorthand as sub-joint of Liên danh Công ty cổ phần Tư vấn và đầu tư VICCO HTC và Công ty Cổ phần Đầu tư xây dựng và công nghệ Bình Minh..
- Result: Won
13/06/2026 09:16
BINH MINH INVESTMENT CONSTRUCTION AND TECHNOLOGY JOINT STOCK COMPANY Won the bidding for the Consulting on Preparation of Finance and Technical Report package, which was invited for bidding by the VIETNAM POSTS AND TELECOMMUNICATIONS GROUP through an assign shorthand as an independent entity.
- Result: Won
05/06/2026 10:39
BINH MINH INVESTMENT CONSTRUCTION AND TECHNOLOGY JOINT STOCK COMPANY Won the bidding for the Consulting, surveying, preparing technical reports package, which was invited for bidding by the Phòng Kinh tế xã Gia Phú through an assign shorthand as an independent entity.
- Result: Won
04/06/2026 14:42
BINH MINH INVESTMENT CONSTRUCTION AND TECHNOLOGY JOINT STOCK COMPANY Won the bidding for the Bidding consultancy for the package of providing security services to protect Agribank building 27 Dai Co Viet package, which was invited for bidding by the VIETNAM BANK FOR AGRICULTURE AND RURAL DEVELOPMENT through an assign shorthand as an independent entity.
- Result: Won
04/05/2026 10:05
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder BINH MINH INVESTMENT CONSTRUCTION AND TECHNOLOGY JOINT STOCK COMPANY participated in 75 package, of which 75 package was won, failed 0 packages, 0 packages with no results, 0 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor BINH MINH INVESTMENT CONSTRUCTION AND TECHNOLOGY JOINT STOCK COMPANY is related to 20 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor BINH MINH INVESTMENT CONSTRUCTION AND TECHNOLOGY JOINT STOCK COMPANY has a relationship with 32 the investor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor BINH MINH INVESTMENT CONSTRUCTION AND TECHNOLOGY JOINT STOCK COMPANY competed with 8 contractors in 4 package, won 4 package, lost 0 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor BINH MINH INVESTMENT CONSTRUCTION AND TECHNOLOGY JOINT STOCK COMPANY once entered into a partnership with 9 contractors in 11 package, won bid 11 package, lost 0 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor BINH MINH INVESTMENT CONSTRUCTION AND TECHNOLOGY JOINT STOCK COMPANY participated in bidding in 9 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor BINH MINH INVESTMENT CONSTRUCTION AND TECHNOLOGY JOINT STOCK COMPANY participated in bidding in 8 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 72,245 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
Add contractor