Data analysis results of DauThau.info software for contractors CENCO INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY are as follows:
You need to Login or Sign up to view all informations.
- Participated in 36 bidding packages, of which 25 were won, 7 were lost, 2 are pending results, and 2 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 30.06% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 94.14% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Phú Thọ (8), Hà Nội (4), An Giang (4), Thái Nguyên (3), Đắk Lắk (2), Hải Phòng (2), Thanh Hoá (2), Hưng Yên (1), Gia Lai (1), Khánh Hòa (1), Hà Tĩnh (1), Đà Nẵng (1), Undefined (11)
- Provinces before the merger where the contractor has participated in bidding : Phú Thọ (7), Hà Nội (4), Kiên Giang (3), Bắc Kạn (3), Đắk Lắk (2), Thanh Hoá (2), Vĩnh Phúc (1), An Giang (1), Hải Phòng (1), Thái Bình (1), Bình Định (1), Khánh Hòa (1), Hà Tĩnh (1), Quảng Nam (1), Hải Dương (1), Undefined (11)
- Has relationships with 28 Bid Solicitors
- Has competed against 42 contractors in 21 bidding packages, won 12 packages, lost 7 packages, 0 are pending results, and 2 were canceled.
- Has collaborated with 18 contractors in 22 bidding packages, won 15 packages, lost 5 packages, 0 are pending results, and 2 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 7 bidding packages with 4 roles.
- Published contractor selection plan of 0 project with a total of 0 of bidding packages.
- Invitation to bid 0 package (with 0 Tender Notices), conducting Prequalificatin Notice 0 packages.
- Results of 0 packages announced, canceled bids 0 packages (among the packages above).
- There are 0 packages with results without Tender Notice and Prequalification Notice.
This contractor is also the investor. The results of data analysis for investors CENCO INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY are as follows:
- As the investor of 0 investment and development projects.
- As the investor of 0 Contractor Selection Plan, including 0 self-published Contractor Selection Plan, 0 Contractor Selection Plan is self-published by the entity. other posted.
- As the investor of 3 bidding package in which the package is self-inviting 0, with 3 the package is owned by the unit. other bidding.
- Building organization name: CÔNG TY CỔ PHẦN ĐẦU TƯ VÀ XÂY DỰNG CENCO
- Construction capacity certificate code: 00006279
- Issuing Authority: Sở kế hoạch đầu tư thành phố Hà Nội
- Field:
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: NN&PTNT
⚬ Khảo sát xây dựng: Địa hình, Địa chất công trình
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Dân dụng (Trừ Điện, cơ điện, Thông gió cấp thoát nhiệt)
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Thủy điện (phần kết cấu)
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Hạ tầng kỹ thuật (Cấp thoát nước)
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Nông nghiệp và phát triển nông thôn
⚬ Giám sát công tác xây dựng công trình: Giao Thông
⚬ Giám sát công tác xây dựng công trình: Thủy điện
⚬ Giám sát công tác xây dựng công trình: Hạ tầng kỹ thuật (Cấp thoát nước)
⚬ Giám sát công tác xây dựng công trình: Nông nghiệp và phát triển nông thôn
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Giao thông Đường bộ
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 3 | 12% |
| Lower by 10% to 20% | 4 | 16% |
| Lower by 5% to 10% | 0 | 0% |
| Lower by 1% to 5% | 6 | 24% |
| Lower by 0% to 1% | 8 | 32% |
| 0% | 2 | 8% |
| Higher by 0% to 1% | 0 | 0% |
| Higher by 1% to 5% | 0 | 0% |
| Higher by 5% to 10% | 0 | 0% |
| Higher by 10% or more | 1 | 4% |
| Unknown | 1 | 4% |
| Total | 25 | 100% |
CENCO INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY Won the bidding for the Package No. 15: Survey and preparation of Pre-F/S - resettlement area for Tac Cau fishing port expansion sub-project at Kien Giang major fishing center package, which was invited for bidding by the Ban quản lý các dự án Nông nghiệp through an assign bid as an independent entity.
- Result: Won
22/12/2025 11:25
CENCO INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY Won the bidding for the Modeling and simulating model scenarios package, which was invited for bidding by the Institute for Water Supply, Sewerage and Environmental Research through an Open bidding as sub-joint of Liên danh gói thầu Xây dựng mô hình và mô phỏng các kịch bản mô hình Công ty cổ phần xây dựng và môi trường INTERCE và Công ty Cổ phẩn Đầu tư và Xây dựng CENCO (INTERCE-CENCO). One other contractors also participated.
- Result: Won
21/11/2025 16:35
CENCO INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY join for the Modeling and simulating model scenarios package, which was invited for bidding by the Institute for Water Supply, Sewerage and Environmental Research through an Open bidding as sub-joint of CÔNG TY CỔ PHẦN ĐẦU TƯ VÀ XÂY DỰNG CENCO. One other contractors also participated.
- Result: Tender opening completed
03/11/2025 11:11
CENCO INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY Won the bidding for the Bidding package 21/2025/TV. Construction supervision, package equipment 20/2025/XL and environment package, which was invited for bidding by the Ban Quản lý dự án khu vực Phú Thọ through an Open bidding as sub-joint of IHR – CENCO – ETOHI. Five other contractors also participated.
- Result: Won
08/10/2025 15:28
CENCO INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY join for the Bidding package 21/2025/TV. Construction supervision, package equipment 20/2025/XL and environment package, which was invited for bidding by the Ban Quản lý dự án khu vực Phú Thọ through an Open bidding as sub-joint of CÔNG TY CỔ PHẦN ĐẦU TƯ VÀ XÂY DỰNG CENCO. Five other contractors also participated.
- Result: Tender opening completed
27/08/2025 08:33
CENCO INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY Won the bidding for the Bidding package 21: Supervision of construction and installation of bidding equipment No. 20 package, which was invited for bidding by the Ban Quản lý dự án đầu tư xây dựng công trình nông nghiệp và phát triển nông thôn tỉnh Bắc Kạn through an Open bidding as sub-joint of Liên danh giám sát hạ tầng cụm công nghiệp tỉnh Bắc Kạn. Five other contractors also participated.
- Result: Won
14/07/2025 08:00
CENCO INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY Won the bidding for the Supervision of construction and installation of construction equipment (phase 1) package, which was invited for bidding by the PHU KHANG JOINT STOCK COMPANY through an Open bidding as sub-joint of CÔNG TY CỔ PHẦN XÂY DỰNG VÀ MÔI TRƯỜNG INTERCE QUỐC TẾ.
- Result: Won
27/05/2025 15:07
CENCO INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY join for the Bidding package 21: Supervision of construction and installation of bidding equipment No. 20 package, which was invited for bidding by the Ban Quản lý dự án đầu tư xây dựng công trình nông nghiệp và phát triển nông thôn tỉnh Bắc Kạn through an Open bidding as sub-joint of CÔNG TY CỔ PHẦN ĐẦU TƯ VÀ XÂY DỰNG CENCO. Five other contractors also participated.
- Result: Tender opening completed
21/03/2025 08:10
CENCO INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY Won the bidding for the Package 09: Consultancy and verification of construction drawings, cost estimates package, which was invited for bidding by the Trung tâm Khuyến công và Xúc tiến thương mại tỉnh Bắc Kạn through an assign bid as sub-joint of CÔNG TY CỔ PHẦN ĐẦU TƯ XÂY DỰNG VÀ THƯƠNG MẠI NEWSTECH VIỆT NAM.
- Result: Won
05/11/2024 19:19
CENCO INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY Won the bidding for the Package 02: Consulting survey, making construction design documents and deploying after basic design package, which was invited for bidding by the Phòng kinh tế huyện Thường Tín through an Open bidding as an independent entity. Two other contractors also participated.
- Result: Won
26/09/2024 16:01
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder CENCO INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY participated in 36 package, of which 25 package was won, failed 7 packages, 2 packages with no results, 2 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor CENCO INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY is related to 28 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor CENCO INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY competed with 42 contractors in 21 package, won 12 package, lost 7 package, 0 bidding package has no results, 2 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor CENCO INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY once entered into a partnership with 18 contractors in 22 package, won bid 15 package, lost 5 package, 0 bidding package has no results, 2 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor CENCO INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY participated in bidding in 12 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor CENCO INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY participated in bidding in 15 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 68,759 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects
Add contractor