Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for contractors CHUNG SON MECHANICAL COMPANY LIMITED are as follows:
You need to Login or Sign up to view all informations.
- Participated in 58 bidding packages, of which 8 were won, 44 were lost, 0 are pending results, and 6 were canceled.
- Total bid-winning value: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Lowest bid rate when participating: 0.1% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 97.59% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces participated in the bidding: Bà Rịa - Vũng Tàu (11), Hà Nội (9), Hải Phòng (9), Hải Dương (8), Quảng Ninh (6), Sơn La (4), Gia Lai (2), Hòa Bình (1), Bình Phước (1), Cần Thơ (1), Thái Bình (1), Thái Nguyên (1), Undefined (4)
- Has relationships with 17 Bid Solicitors
- Has competed against 58 contractors in 50 bidding packages, won 0 packages, lost 44 packages, 0 are pending results, and 6 were canceled.
- Has collaborated with 2 contractors in 2 bidding packages, won 0 packages, lost 2 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Competitiveness | ??? |
Enterprise scale | ??? |
Violation history | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
---|---|---|
Lower by 20% or more | 0 | 0% |
Lower by 10% to 20% | 0 | 0% |
Lower by 5% to 10% | 2 | 25% |
Lower by 1% to 5% | 1 | 12.5% |
Lower by 0% to 1% | 4 | 50% |
0% | 1 | 12.5% |
Higher by 0% to 1% | 0 | 0% |
Higher by 1% to 5% | 0 | 0% |
Higher by 5% to 10% | 0 | 0% |
Higher by 10% or more | 0 | 0% |
Unknown | 0 | 0% |
Total | 8 | 100% |
CHUNG SON MECHANICAL COMPANY LIMITED Won the bidding for the Package No. 01: Purchasing raw materials and manufacturing, installing, programming equipment systems (pneumatic, electrical, control), testing and calibrating equipment in 2024 package, which was invited for bidding by the Vietnam Institute for Building Materials through an Competitive Offer as an independent entity.
- Result: Won
08/08/2024 09:50
CHUNG SON MECHANICAL COMPANY LIMITED Won the bidding for the Bidding package No. 03: Purchasing materials used for research, design, and equipment manufacturing in 2023 package, which was invited for bidding by the Vietnam Institute for Building Materials through an Competitive Offer as an independent entity.
- Result: Won
30/01/2024 14:44
CHUNG SON MECHANICAL COMPANY LIMITED lost the bidding for the ACC Propeller Machining Supplies (306-2) package, which was invited for bidding by the BARIA THERMAL POWER JOINT STOCK COMPANY through an Open bidding as an independent entity. One other contractors also participated.
- Result: Lost
24/04/2023 15:10
CHUNG SON MECHANICAL COMPANY LIMITED Won the bidding for the New purchase of machinery and equipment package, which was invited for bidding by the Vietnam Institute for Building Materials through an Competitive Offer as an independent entity.
- Result: Won
16/01/2023 16:02
CHUNG SON MECHANICAL COMPANY LIMITED Won the bidding for the Supply and installation of operating instructions for the chamber shot blasting machine package, which was invited for bidding by the VINACOMIN MOTOR INDUSTRY JOINT STOCK COMPANY through an Competitive Offer as an independent entity.
- Result: Won
09/11/2022 15:49
CHUNG SON MECHANICAL COMPANY LIMITED Won the bidding for the Supply and installation of equipment for HM A10 conversion tower-Thai Nguyen electrolytic zinc factory package, which was invited for bidding by the VINACOMIN MOTOR INDUSTRY JOINT STOCK COMPANY through an Đấu thầu rộng rãi trong nước as an independent entity.
- Result: Won
31/08/2022 08:50
CHUNG SON MECHANICAL COMPANY LIMITED lost the bidding for the ACC Propeller Machining Supplies (306-2) package, which was invited for bidding by the BARIA THERMAL POWER JOINT STOCK COMPANY through an Đấu thầu rộng rãi trong nước as an independent entity. One other contractors also participated.
- Result: Lost
25/08/2022 07:16
CHUNG SON MECHANICAL COMPANY LIMITED lost the bidding for the Materials for processing blowdown coolers package, which was invited for bidding by the BARIA THERMAL POWER JOINT STOCK COMPANY through an Chào hàng cạnh tranh trong nước as an independent entity. One other contractors also participated.
- Result: Lost
09/08/2022 16:11
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder CHUNG SON MECHANICAL COMPANY LIMITED participated in 58 package, of which 8 package was won, failed 44 packages, 0 packages with no results, 6 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor CHUNG SON MECHANICAL COMPANY LIMITED is related to 17 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor CHUNG SON MECHANICAL COMPANY LIMITED competed with 58 contractors in 50 package, won 0 package, lost 44 package, 0 bidding package has no results, 6 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor CHUNG SON MECHANICAL COMPANY LIMITED once entered into a partnership with 2 contractors in 2 package, won bid 0 package, lost 2 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor CHUNG SON MECHANICAL COMPANY LIMITED participated in bidding in 12 provinces/cities, 0 bidding packages were carried out nationwide, 0 bidding packages were carried out outside of Vietnam. The data table has been partially hidden, to see the full information please Login or Register
There are 63,681 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code