Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
History of active status changes
| Updated time | Active status | Lý do |
|---|---|---|
|
1:05 AM 10/16/2022 |
Pause |
Temporarily suspended due to overdue fees |
|
11:18 AM 10/17/2022 |
Active |
At the request of QTHT |
|
9:59 AM 04/02/2023 |
Pause |
Temporarily suspended due to overdue fees |
|
7:41 AM 04/03/2023 |
Active |
At the request of QTHT |
|
1:10 AM 07/01/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
8:51 AM 07/01/2024 |
Active |
At the request of QTHT |
|
12:05 AM 08/11/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
3:33 PM 08/19/2024 |
Active |
At the request of QTHT |
|
12:06 AM 10/26/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
3:09 PM 12/11/2024 |
Active |
At the request of QTHT |
|
12:05 AM 02/04/2025 |
Pause |
Temporarily suspended due to overdue fees |
|
10:10 AM 02/07/2025 |
Active |
At the request of QTHT |
|
1:47 AM 04/01/2025 |
Pause |
Temporarily suspended due to overdue fees |
|
8:48 AM 04/10/2025 |
Active |
At the request of QTHT |
Data analysis results of DauThau.info software for contractors COMPOSITE MATERIAL PRODUCE COMPANY LIMITED are as follows:
You need to Login or Sign up to view all informations.
- Participated in 64 bidding packages, of which 30 were won, 30 were lost, 1 are pending results, and 3 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 72.98% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 81.15% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Hà Nội (27), Phú Thọ (8), Đà Nẵng (6), Hưng Yên (5), Quảng Trị (5), Hải Phòng (4), TP.Hồ Chí Minh (4), Nghệ An (3), Lâm Đồng (3), Quảng Ninh (3), Thanh Hoá (3), Gia Lai (3), Đồng Nai (3), Huế (3), Hà Tĩnh (2), Thái Nguyên (2), Bắc Ninh (2), Ninh Bình (2), Quảng Ngãi (2), Khánh Hòa (2), Tây Ninh (2), Đồng Tháp (2), Cần Thơ (2), Đắk Lắk (2), Lào Cai (1), Điện Biên (1), Tuyên Quang (1), Vĩnh Long (1), Sơn La (1), Nationwide (1), Undefined (10)
- Provinces before the merger where the contractor has participated in bidding : Hà Nội (27), Đà Nẵng (5), Vĩnh Phúc (4), Thái Bình (3), Nghệ An (3), Quảng Trị (3), Quảng Bình (3), Hải Phòng (3), Quảng Ninh (3), Thanh Hoá (3), Huế (3), Phú Thọ (2), Hà Tĩnh (2), TP.Hồ Chí Minh (2), Bắc Kạn (2), Bắc Ninh (2), Nam Định (2), Quảng Ngãi (2), Bình Định (2), Đồng Nai (2), Bình Dương (2), Tây Ninh (2), Đồng Tháp (2), Cần Thơ (2), Lào Cai (1), Lâm Đồng (1), Điện Biên (1), Tuyên Quang (1), Bắc Giang (1), Hưng Yên (1), Ninh Thuận (1), Bình Thuận (1), Vĩnh Long (1), Hòa Bình (1), Hải Dương (1), Phú Yên (1), Long An (1), Sơn La (1), Undefined (21)
- Has relationships with 38 Bid Solicitors
- Has competed against 65 contractors in 38 bidding packages, won 6 packages, lost 25 packages, 5 are pending results, and 2 were canceled.
- Has collaborated with 4 contractors in 2 bidding packages, won 0 packages, lost 2 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 0 bidding packages with 0 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 2 | 6.7% |
| Lower by 10% to 20% | 1 | 3.3% |
| Lower by 5% to 10% | 2 | 6.7% |
| Lower by 1% to 5% | 11 | 36.7% |
| Lower by 0% to 1% | 6 | 20% |
| 0% | 8 | 26.7% |
| Higher by 0% to 1% | 0 | 0% |
| Higher by 1% to 5% | 0 | 0% |
| Higher by 5% to 10% | 0 | 0% |
| Higher by 10% or more | 0 | 0% |
| Unknown | 0 | 0% |
| Total | 30 | 100% |
COMPOSITE MATERIAL PRODUCE COMPANY LIMITED Won the bidding for the Package No. 03: Procurement of specialized machinery and equipment for forest protection and fire prevention and fighting package, which was invited for bidding by the Chi cục Lâm nghiệp và Kiểm lâm tỉnh Phú Thọ through an Open bidding as an independent entity.
- Result: Won
30/12/2025 10:01
COMPOSITE MATERIAL PRODUCE COMPANY LIMITED lost the bidding for the Shopping for round floats package, which was invited for bidding by the Cục Trang bị và kho vận through an Open bidding as an independent entity. Two other contractors also participated.
- Result: Lost
27/12/2025 13:20
COMPOSITE MATERIAL PRODUCE COMPANY LIMITED lost the bidding for the Life vest package, which was invited for bidding by the Cục Trang bị và kho vận through an Open bidding as an independent entity. Two other contractors also participated.
- Result: Lost
27/12/2025 13:13
COMPOSITE MATERIAL PRODUCE COMPANY LIMITED join for the Package No. 03: Procurement of specialized machinery and equipment for forest protection and fire prevention and fighting package, which was invited for bidding by the through an Open bidding as an independent entity.
- Result: Tender opening completed
25/12/2025 14:15
COMPOSITE MATERIAL PRODUCE COMPANY LIMITED lost the bidding for the Bidding package No. 2: Purchasing unmanned aerial vehicles from Hue City Military Command in 2025 package, which was invited for bidding by the through an Competitive Offer as an independent entity. Four other contractors also participated.
- Result: Lost
23/12/2025 15:48
COMPOSITE MATERIAL PRODUCE COMPANY LIMITED lost the bidding for the Package No. 03: Procurement of specialized machinery and equipment for forest protection and fire prevention and fighting package, which was invited for bidding by the through an Open bidding as an independent entity.
- Result: Lost
16/12/2025 14:45
COMPOSITE MATERIAL PRODUCE COMPANY LIMITED join for the Bidding package No. 2: Purchasing unmanned aerial vehicles from Hue City Military Command in 2025 package, which was invited for bidding by the through an Competitive Offer as an independent entity. Four other contractors also participated.
- Result: Tender opening completed
15/12/2025 15:18
COMPOSITE MATERIAL PRODUCE COMPANY LIMITED lost the bidding for the Package 2: Build new buoys in Vinh Thuc commune package, which was invited for bidding by the through an Open bidding as an independent entity. One other contractors also participated.
- Result: Lost
11/12/2025 15:49
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder COMPOSITE MATERIAL PRODUCE COMPANY LIMITED participated in 64 package, of which 30 package was won, failed 30 packages, 1 packages with no results, 3 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor COMPOSITE MATERIAL PRODUCE COMPANY LIMITED is related to 38 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor COMPOSITE MATERIAL PRODUCE COMPANY LIMITED competed with 65 contractors in 38 package, won 6 package, lost 25 package, 5 bidding package has no results, 2 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor COMPOSITE MATERIAL PRODUCE COMPANY LIMITED once entered into a partnership with 4 contractors in 2 package, won bid 0 package, lost 2 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor COMPOSITE MATERIAL PRODUCE COMPANY LIMITED participated in bidding in 29 provinces/cities, 1 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor COMPOSITE MATERIAL PRODUCE COMPANY LIMITED participated in bidding in 38 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 68,759 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects
Add contractor