Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for contractors KAM INDUSTRIAL JOINT STOCK COMPANY are as follows:
You need to Login or Sign up to view all informations.
- Participated in 48 bidding packages, of which 30 were won, 16 were lost, 1 are pending results, and 1 were canceled.
- Total bid-winning value: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Lowest bid rate when participating: 84.8% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 91.92% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces participated in the bidding: Hà Nội (40), Bà Rịa - Vũng Tàu (2), Phú Thọ (2), Undefined (4)
- Has relationships with 11 Bid Solicitors
- Has competed against 27 contractors in 32 bidding packages, won 14 packages, lost 15 packages, 2 are pending results, and 1 were canceled.
- Has collaborated with 2 contractors in 2 bidding packages, won 1 packages, lost 1 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Competitiveness | ??? |
Enterprise scale | ??? |
Violation history | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
---|---|---|
Lower by 20% or more | 4 | 13.3% |
Lower by 10% to 20% | 3 | 10% |
Lower by 5% to 10% | 6 | 20% |
Lower by 1% to 5% | 9 | 30% |
Lower by 0% to 1% | 6 | 20% |
0% | 2 | 6.7% |
Higher by 0% to 1% | 0 | 0% |
Higher by 1% to 5% | 0 | 0% |
Higher by 5% to 10% | 0 | 0% |
Higher by 10% or more | 0 | 0% |
Unknown | 0 | 0% |
Total | 30 | 100% |
KAM INDUSTRIAL JOINT STOCK COMPANY Won the bidding for the Order mechanical BTP processing to serve the production of S7L Boxes package, which was invited for bidding by the 133 ONE MEMBER COMPANY LIMITED through an Competitive Offer as an independent entity. One other contractors also participated.
- Result: Won
07/10/2024 10:22
KAM INDUSTRIAL JOINT STOCK COMPANY Won the bidding for the Procurement of tools, processing of VTKT components package, which was invited for bidding by the 133 ONE MEMBER COMPANY LIMITED through an Competitive Offer as an independent entity.
- Result: Won
26/08/2024 15:54
KAM INDUSTRIAL JOINT STOCK COMPANY Won the bidding for the 23-2024-HKVT-KHCN “Procurement of electrical, electronic and high-frequency testing equipment in aviation and related services” package, which was invited for bidding by the VIETTEL AEROSPACE INSTITUTE through an Open bidding as sub-joint of CÔNG TY TNHH CÔNG NGHỆ EPI VIỆT NAM. Three other contractors also participated.
- Result: Won
28/06/2024 12:32
KAM INDUSTRIAL JOINT STOCK COMPANY Won the bidding for the 22-2024-HKVT-KHCN “Procurement of specialized testing equipment in aviation production and related services” package, which was invited for bidding by the VIETTEL AEROSPACE INSTITUTE through an Open bidding as an independent entity. One other contractors also participated.
- Result: Won
25/06/2024 11:33
KAM INDUSTRIAL JOINT STOCK COMPANY Won the bidding for the 21-2024-HKVT-KHCN “Procurement of specialized equipment to check aviation fuel and compressed air systems and related services” package, which was invited for bidding by the VIETTEL AEROSPACE INSTITUTE through an Open bidding as an independent entity.
- Result: Won
25/06/2024 11:31
KAM INDUSTRIAL JOINT STOCK COMPANY Won the bidding for the 26-2024-HKVT-KHCN “Procurement of specialized equipment to check aviation steering mechanisms and related services” package, which was invited for bidding by the VIETTEL AEROSPACE INSTITUTE through an Open bidding as an independent entity.
- Result: Won
21/06/2024 17:05
KAM INDUSTRIAL JOINT STOCK COMPANY Won the bidding for the 25-2024-HKVT-KHCN “Procurement of dry air intake system and related services” package, which was invited for bidding by the VIETTEL AEROSPACE INSTITUTE through an Open bidding as an independent entity.
- Result: Won
20/06/2024 16:53
KAM INDUSTRIAL JOINT STOCK COMPANY Won the bidding for the 59-2024-VHT-K1-M.VEA Procurement of processed goods 01 set of EMP mechanical frame package, which was invited for bidding by the VIETTEL HIGH TECHNOLOGY INDUSTRIES CORPORATION - BRANCH OF VIETTEL GROUP through an Open bidding as an independent entity. Three other contractors also participated.
- Result: Won
12/06/2024 17:19
KAM INDUSTRIAL JOINT STOCK COMPANY lost the bidding for the 01-2024-VHTK1-2MW Procurement of processed goods for 01 emitter and 01 transducer cover for the antenna system package, which was invited for bidding by the VIETTEL HIGH TECHNOLOGY INDUSTRIES CORPORATION - BRANCH OF VIETTEL GROUP through an Open bidding as an independent entity. Two other contractors also participated.
- Result: Lost
20/05/2024 16:29
KAM INDUSTRIAL JOINT STOCK COMPANY lost the bidding for the 125-2023-HKVT-PK "Procurement of 07 pneumatic damper assemblies according to design" package, which was invited for bidding by the VIETTEL AEROSPACE INSTITUTE through an Open bidding as an independent entity. One other contractors also participated.
- Result: Lost
08/05/2024 17:22
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder KAM INDUSTRIAL JOINT STOCK COMPANY participated in 48 package, of which 30 package was won, failed 16 packages, 1 packages with no results, 1 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor KAM INDUSTRIAL JOINT STOCK COMPANY is related to 11 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor KAM INDUSTRIAL JOINT STOCK COMPANY competed with 27 contractors in 32 package, won 14 package, lost 15 package, 2 bidding package has no results, 1 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor KAM INDUSTRIAL JOINT STOCK COMPANY once entered into a partnership with 2 contractors in 2 package, won bid 1 package, lost 1 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor KAM INDUSTRIAL JOINT STOCK COMPANY participated in bidding in 3 provinces/cities, 0 bidding packages were carried out nationwide, 0 bidding packages were carried out outside of Vietnam. The data table has been partially hidden, to see the full information please Login or Register
There are 63,681 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code