Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
History of active status changes
| Updated time | Active status | Lý do |
|---|---|---|
|
8:44 AM 01/30/2023 |
Pause |
Temporarily suspended due to overdue fees |
|
11:59 AM 01/30/2023 |
Active |
At the request of QTHT |
|
12:03 AM 10/11/2023 |
Pause |
Temporarily suspended due to overdue fees |
|
9:23 AM 10/11/2023 |
Active |
At the request of QTHT |
|
12:06 AM 08/29/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
8:44 AM 08/30/2024 |
Active |
At the request of QTHT |
|
12:06 AM 10/16/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
5:03 PM 10/17/2024 |
Active |
At the request of QTHT |
|
12:06 AM 11/07/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
5:15 PM 11/11/2024 |
Active |
At the request of QTHT |
|
1:43 AM 04/01/2025 |
Pause |
Temporarily suspended due to overdue fees |
|
1:53 PM 04/01/2025 |
Active |
At the request of QTHT |
|
10:02 AM 05/25/2025 |
Pause |
Temporarily suspended due to overdue fees |
|
5:58 PM 05/29/2025 |
Active |
At the request of QTHT |
|
12:05 AM 04/28/2026 |
Pause |
Temporarily suspended due to overdue fees |
|
4:08 PM 05/13/2026 |
Active |
At the request of QTHT |
|
12:05 AM 06/05/2026 |
Pause |
Temporarily suspended due to overdue fees |
|
8:46 AM 06/05/2026 |
Active |
At the request of QTHT |
|
12:05 AM 07/30/2026 |
Pause |
Temporarily suspended due to overdue fees |
|
4:20 PM 08/01/2026 |
Active |
At the request of QTHT |
|
12:05 AM 08/18/2026 |
Pause |
Temporarily suspended due to overdue fees |
|
9:06 AM 08/24/2026 |
Active |
At the request of QTHT |
Data analysis results of DauThau.info software for contractors KAM INDUSTRIAL JOINT STOCK COMPANY are as follows:
You need to Login or Sign up to view all informations.
- Participated in 57 bidding packages, of which 37 were won, 18 were lost, 1 are pending results, and 1 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 44.26% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 97% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Hà Nội (50), TP.Hồ Chí Minh (2), Phú Thọ (2), Undefined (3)
- Provinces before the merger where the contractor has participated in bidding : Hà Nội (50), Bà Rịa - Vũng Tàu (2), Phú Thọ (2), Undefined (3)
- Has relationships with 12 Bid Solicitors
- Has relationships with 16 Bid Investors
- Has competed against 27 contractors in 55 bidding packages, won 36 packages, lost 17 packages, 1 are pending results, and 1 were canceled.
- Has collaborated with 2 contractors in 2 bidding packages, won 1 packages, lost 1 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 4 | 0% |
| Lower by 10% to 20% | 3 | 0% |
| Lower by 5% to 10% | 6 | 0% |
| Lower by 1% to 5% | 13 | 0% |
| Lower by 0% to 1% | 8 | 0% |
| 0% | 3 | 0% |
| Higher by 0% to 1% | 0 | |
| Higher by 1% to 5% | 0 | |
| Higher by 5% to 10% | 0 | |
| Higher by 10% or more | 0 | |
| Unknown | 0 | |
| Total | 37 | 100% |
KAM INDUSTRIAL JOINT STOCK COMPANY Won the bidding for the Establish production of metal parts and rubber molds for use in manufacturing HS7L package, which was invited for bidding by the 133 ONE MEMBER COMPANY LIMITED through an as an independent entity.
- Result: Won
28/08/2026 10:10
KAM INDUSTRIAL JOINT STOCK COMPANY Won the bidding for the Order production of BTP and closed test fixtures for HS7L production package, which was invited for bidding by the 133 ONE MEMBER COMPANY LIMITED through an as an independent entity.
- Result: Won
05/08/2026 16:11
KAM INDUSTRIAL JOINT STOCK COMPANY Won the bidding for the 155-2025-HKVT-DT Providing high pressure dry nitrogen gas generation system package, which was invited for bidding by the VIETTEL GROUP through an as an independent entity.
- Result: Won
29/06/2026 17:25
KAM INDUSTRIAL JOINT STOCK COMPANY Won the bidding for the Order processing of BTP, specialized tools to serve the production of HL-DL-CB P122 package, which was invited for bidding by the 133 ONE MEMBER COMPANY LIMITED through an as an independent entity.
- Result: Won
25/05/2026 10:01
KAM INDUSTRIAL JOINT STOCK COMPANY lost the bidding for the 155-2025-HKVT-DT Providing high pressure dry nitrogen gas generation system package, which was invited for bidding by the VIETTEL GROUP through an as an independent entity.
- Result: Lost
13/04/2026 14:08
KAM INDUSTRIAL JOINT STOCK COMPANY Won the bidding for the 157-2025-HKVT-DT Providing specialized fuel loading/discharging equipment and monitoring of energy systems package, which was invited for bidding by the VIETTEL GROUP through an as an independent entity.
- Result: Won
06/04/2026 16:55
KAM INDUSTRIAL JOINT STOCK COMPANY lost the bidding for the 155-2025-HKVT-DT Providing high pressure dry nitrogen gas generation system package, which was invited for bidding by the VIETTEL GROUP through an as an independent entity.
- Result: Lost
20/01/2026 14:22
KAM INDUSTRIAL JOINT STOCK COMPANY Won the bidding for the Specialized TBMT guarantee package, which was invited for bidding by the CỤC HẬU CẦN - KỸ THUẬT/ BỘ TƯ LỆNH PHÁO BINH - TÊN LỬA through an as an independent entity.
- Result: Won
05/06/2025 15:23
KAM INDUSTRIAL JOINT STOCK COMPANY Won the bidding for the Shopping tools, ordering Mechanical BTP VTKT package, which was invited for bidding by the 133 ONE MEMBER COMPANY LIMITED through an as an independent entity.
- Result: Won
29/04/2025 14:53
KAM INDUSTRIAL JOINT STOCK COMPANY Won the bidding for the Order mechanical BTP processing to serve the production of S7L Boxes package, which was invited for bidding by the 133 ONE MEMBER COMPANY LIMITED through an as an independent entity. One other contractors also participated.
- Result: Won
07/10/2024 10:22
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder KAM INDUSTRIAL JOINT STOCK COMPANY participated in 57 package, of which 37 package was won, failed 18 packages, 1 packages with no results, 1 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor KAM INDUSTRIAL JOINT STOCK COMPANY is related to 12 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor KAM INDUSTRIAL JOINT STOCK COMPANY has a relationship with 16 the investor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor KAM INDUSTRIAL JOINT STOCK COMPANY competed with 27 contractors in 55 package, won 36 package, lost 17 package, 1 bidding package has no results, 1 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor KAM INDUSTRIAL JOINT STOCK COMPANY once entered into a partnership with 2 contractors in 2 package, won bid 1 package, lost 1 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor KAM INDUSTRIAL JOINT STOCK COMPANY participated in bidding in 3 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor KAM INDUSTRIAL JOINT STOCK COMPANY participated in bidding in 3 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 71,075 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
Add contractor