- Participated in 45 bidding packages, of which 41 were won, 2 were lost, 2 are pending results, and 0 were canceled.
- Total bid-winning value: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Lowest bid rate when participating: 98.99% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 100.38% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces participated in the bidding: Hà Nội (17), TP.Hồ Chí Minh (2), Đồng Tháp (1), Bắc Ninh (1), Bình Định (1), Ninh Bình (1), Cần Thơ (1), Undefined (21)
- Has relationships with 24 Bid Solicitors
- Has competed against 16 contractors in 7 bidding packages, won 4 packages, lost 2 packages, 1 are pending results, and 0 were canceled.
- Has collaborated with 3 contractors in 3 bidding packages, won 3 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Competitiveness | ??? |
Enterprise scale | ??? |
Violation history | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
---|---|---|
Lower by 20% or more | 0 | 0% |
Lower by 10% to 20% | 2 | 4.9% |
Lower by 5% to 10% | 3 | 7.3% |
Lower by 1% to 5% | 11 | 26.8% |
Lower by 0% to 1% | 18 | 43.9% |
0% | 5 | 12.2% |
Higher by 0% to 1% | 0 | 0% |
Higher by 1% to 5% | 0 | 0% |
Higher by 5% to 10% | 0 | 0% |
Higher by 10% or more | 2 | 4.9% |
Unknown | 0 | 0% |
Total | 41 | 100% |
ICIC- NUMBER 3 INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY Won the bidding for the Package 02 “Waterproofing repair of roof and first floor wall at ADN Inspection Center” package, which was invited for bidding by the Institute of Biotechnology through an assign bid as an independent entity.
- Result: Won
08/10/2024 10:55
ICIC- NUMBER 3 INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY Won the bidding for the Construction package, which was invited for bidding by the ND TRADING AND CONSTRUCTION INVESTMENT COMPANY LIMITED through an Open bidding as an independent entity. Five other contractors also participated.
- Result: Won
25/07/2024 12:21
ICIC- NUMBER 3 INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY Won the bidding for the Package No. 1: Repairing the water supply and drainage system package, which was invited for bidding by the Institute of Geography through an Competitive Offer as an independent entity.
- Result: Won
26/10/2023 10:57
ICIC- NUMBER 3 INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY Won the bidding for the Construction and equipment installation package, which was invited for bidding by the Công ty TNHH MTV Quản lý nợ và Khai thác tài sản Ngân hàng TMCP Công thương Việt Nam through an Open bidding as sub-joint of CÔNG TY CỔ PHẦN ĐẦU TƯ XÂY DỰNG THƯƠNG MẠI CÔNG NGHỆ THÀNH NAM.
- Result: Won
12/10/2023 20:10
ICIC- NUMBER 3 INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY Won the bidding for the Package No. 3: Construction and repair of energy technology and equipment research and testing zones package, which was invited for bidding by the Viện Khoa học năng lượng through an Open bidding as an independent entity. One other contractors also participated.
- Result: Won
22/08/2023 08:52
ICIC- NUMBER 3 INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY Won the bidding for the Construction and installation works: warehouse for mechanical materials + Worker's motel and surrounding technical infrastructure package, which was invited for bidding by the PETROLIMEX PETROCHEMICAL CORPORATION - JSC through an Open bidding as an independent entity. One other contractors also participated.
- Result: Won
12/07/2023 09:02
ICIC- NUMBER 3 INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY Won the bidding for the Tender package: Renovating the garage for bicycles and motorbikes into a cafeteria and temporary storage package, which was invited for bidding by the Center for High Technology Development through an assign shorthand as an independent entity.
- Result: Won
14/03/2023 11:38
ICIC- NUMBER 3 INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY lost the bidding for the Investment project of surface water and production water collection system package, which was invited for bidding by the NINH BINH NITROGENOUS FERTILIZER LTD.COMPANY through an Competitive Offer as an independent entity. Two other contractors also participated.
- Result: Lost
24/02/2023 09:01
ICIC- NUMBER 3 INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY Won the bidding for the XL 05: Construction of temporary detention facility under Go Vap District Police (Not including KSAN item) package, which was invited for bidding by the PHÒNG HẬU CẦN CÔNG AN TP.HCM through an Open bidding as sub-joint of CÔNG TY CỔ PHẦN ĐẦU TƯ VÀ XÂY DỰNG CÔNG NGHIỆP.
- Result: Won
21/12/2022 09:39
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder ICIC- NUMBER 3 INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY participated in 45 package, of which 41 package was won, failed 2 packages, 2 packages with no results, 0 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor ICIC- NUMBER 3 INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY is related to 24 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor ICIC- NUMBER 3 INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY competed with 16 contractors in 7 package, won 4 package, lost 2 package, 1 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor ICIC- NUMBER 3 INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY once entered into a partnership with 3 contractors in 3 package, won bid 3 package, lost 0 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor ICIC- NUMBER 3 INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY participated in bidding in 7 provinces/cities, 0 bidding packages were carried out nationwide, 0 bidding packages were carried out outside of Vietnam. The data table has been partially hidden, to see the full information please Login or Register
There are 63,772 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code