Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
History of active status changes
| Updated time | Active status | Lý do |
|---|---|---|
|
12:45 AM 10/16/2022 |
Pause |
Temporarily suspended due to overdue fees |
|
8:27 AM 10/18/2022 |
Active |
At the request of QTHT |
|
8:27 AM 10/18/2022 |
Active |
At the request of QTHT |
|
12:05 AM 06/12/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
7:49 AM 06/12/2024 |
Active |
At the request of QTHT |
|
12:06 AM 08/15/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
8:52 AM 08/15/2024 |
Active |
At the request of QTHT |
|
12:05 AM 07/06/2025 |
Pause |
Temporarily suspended due to overdue fees |
|
8:27 PM 07/06/2025 |
Active |
At the request of QTHT |
Data analysis results of DauThau.info software for contractors CÔNG TY CỔ PHẦN THIẾT BỊ VÀ CÔNG NGHỆ HOÀNG VŨ are as follows:
You need to Login or Sign up to view all informations.
- Participated in 182 bidding packages, of which 42 were won, 130 were lost, 6 are pending results, and 4 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 33.94% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 68.4% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Quảng Ninh (122), Lạng Sơn (18), Thái Nguyên (8), Hưng Yên (7), Bắc Ninh (5), Cà Mau (4), Lâm Đồng (3), TP.Hồ Chí Minh (3), Hải Phòng (2), Vĩnh Long (2), Hà Tĩnh (2), Đà Nẵng (1), Lào Cai (1), Hà Nội (1), Undefined (5)
- Provinces before the merger where the contractor has participated in bidding : Quảng Ninh (122), Lạng Sơn (18), Thái Nguyên (8), Thái Bình (6), Bình Thuận (3), Bà Rịa - Vũng Tàu (2), Bắc Giang (2), Hà Tĩnh (2), Cà Mau (2), Hải Dương (1), Quảng Nam (1), Trà Vinh (1), Hải Phòng (1), Lào Cai (1), Hà Nội (1), Undefined (13)
- Has relationships with 30 Bid Solicitors
- Has competed against 347 contractors in 173 bidding packages, won 34 packages, lost 130 packages, 5 are pending results, and 4 were canceled.
- Has collaborated with 42 contractors in 92 bidding packages, won 24 packages, lost 65 packages, 1 are pending results, and 2 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 0 bidding packages with 0 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 16 | 38.1% |
| Lower by 10% to 20% | 5 | 11.9% |
| Lower by 5% to 10% | 5 | 11.9% |
| Lower by 1% to 5% | 7 | 16.7% |
| Lower by 0% to 1% | 8 | 19% |
| 0% | 0 | 0% |
| Higher by 0% to 1% | 0 | 0% |
| Higher by 1% to 5% | 1 | 2.4% |
| Higher by 5% to 10% | 0 | 0% |
| Higher by 10% or more | 0 | 0% |
| Unknown | 0 | 0% |
| Total | 42 | 100% |
CÔNG TY CỔ PHẦN THIẾT BỊ VÀ CÔNG NGHỆ HOÀNG VŨ lost the bidding for the Package No. 11: Major repair of faulty power system (diesel generator system G1, G2) Cam Pha Thermal Power Plant package, which was invited for bidding by the through an Open bidding as master consortium of CÔNG TY CỔ PHẦN THIẾT BỊ VÀ CÔNG NGHỆ HOÀNG VŨ. Three other contractors also participated.
- Result: Lost
14/04/2026 16:40
CÔNG TY CỔ PHẦN THIẾT BỊ VÀ CÔNG NGHỆ HOÀNG VŨ lost the bidding for the No. 77MSHH-SCTX-2025 Supply of motors, fan pumps, gear reduction boxes package, which was invited for bidding by the through an Open bidding as master consortium of CÔNG TY CỔ PHẦN THIẾT BỊ VÀ CÔNG NGHỆ HOÀNG VŨ. Seven other contractors also participated.
- Result: Lost
08/04/2026 14:29
CÔNG TY CỔ PHẦN THIẾT BỊ VÀ CÔNG NGHỆ HOÀNG VŨ join for the Tender package No 14: Supply of materials and repair services for condensate water system of generator unit No. 1 of Na Duong Thermal Power Plant package, which was invited for bidding by the through an Competitive Offer as an independent entity. Two other contractors also participated.
06/04/2026 14:17
CÔNG TY CỔ PHẦN THIẾT BỊ VÀ CÔNG NGHỆ HOÀNG VŨ lost the bidding for the Package No. 02: Construction of repair, renovation and replacement of mechanical, electrical, automation equipment, SCADA systems, pipelines and auxiliary works of some factories/wastewater treatment stations (including supply of equipment for repair and replacement) package, which was invited for bidding by the through an Open bidding as sub-joint of CÔNG TY CỔ PHẦN THIẾT BỊ VÀ CÔNG NGHỆ HOÀNG VŨ. One other contractors also participated.
- Result: Lost
25/03/2026 15:15
CÔNG TY CỔ PHẦN THIẾT BỊ VÀ CÔNG NGHỆ HOÀNG VŨ Won the bidding for the Package No. 3: Supply of materials and BOP auxiliary equipment to serve the overhaul of Ca Mau 1 Power Plant in 2026 package, which was invited for bidding by the PETROVIETNAM POWER CORPORATION through an Open bidding as an independent entity. One other contractors also participated.
- Result: Won
24/03/2026 17:26
CÔNG TY CỔ PHẦN THIẾT BỊ VÀ CÔNG NGHỆ HOÀNG VŨ lost the bidding for the Supply, installation, connection of equipment system for measuring sea water flow package, which was invited for bidding by the through an Open bidding as an independent entity. Three other contractors also participated.
- Result: Lost
23/03/2026 08:54
CÔNG TY CỔ PHẦN THIẾT BỊ VÀ CÔNG NGHỆ HOÀNG VŨ Won the bidding for the 09HH-SXKD-2026: Providing mechanical materials to serve the repair of unit S2 - Duyen Hai 1 Thermal Power Plant package, which was invited for bidding by the CÔNG TY NHIỆT ĐIỆN DUYÊN HẢI - CHI NHÁNH TỔNG CÔNG TY PHÁT ĐIỆN 1 through an Open bidding as master consortium of Công ty Hoàng Vũ - Thành Công. Five other contractors also participated.
- Result: Won
19/03/2026 08:48
CÔNG TY CỔ PHẦN THIẾT BỊ VÀ CÔNG NGHỆ HOÀNG VŨ lost the bidding for the Package No. 1: Supply, install, calibrate and test run wind flow measurement equipment for boilers No. 1, No. 2 - Son Dong Thermal Power Plant package, which was invited for bidding by the through an Open bidding as master consortium of CÔNG TY CỔ PHẦN THIẾT BỊ VÀ CÔNG NGHỆ HOÀNG VŨ. Five other contractors also participated.
- Result: Lost
18/03/2026 13:29
CÔNG TY CỔ PHẦN THIẾT BỊ VÀ CÔNG NGHỆ HOÀNG VŨ lost the bidding for the Package No. 1: Providing replacement materials for booster pumps, water supply pumps, coal feeders, and pile breakers to serve the overhaul of unit S2 of Mong Duong 1 Thermal Power Plant package, which was invited for bidding by the through an Open bidding as master consortium of CÔNG TY CỔ PHẦN THIẾT BỊ VÀ CÔNG NGHỆ HOÀNG VŨ. Five other contractors also participated.
- Result: Lost
11/03/2026 10:14
CÔNG TY CỔ PHẦN THIẾT BỊ VÀ CÔNG NGHỆ HOÀNG VŨ lost the bidding for the Package No. 5: Major repair of bottom ash transportation and disposal system; fly ash transportation and disposal system for boiler No. 1, boiler No. 2 - Cam Pha Thermal Power Plant; Limestone supply system and dust blowing system for boiler No. 1, boiler No. 2 - Cam Pha Thermal Power Plant package, which was invited for bidding by the through an Open bidding as master consortium of CÔNG TY CỔ PHẦN THIẾT BỊ VÀ CÔNG NGHỆ HOÀNG VŨ. Four other contractors also participated.
- Result: Lost
04/03/2026 16:38
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder CÔNG TY CỔ PHẦN THIẾT BỊ VÀ CÔNG NGHỆ HOÀNG VŨ participated in 182 package, of which 42 package was won, failed 130 packages, 6 packages with no results, 4 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor CÔNG TY CỔ PHẦN THIẾT BỊ VÀ CÔNG NGHỆ HOÀNG VŨ is related to 30 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor CÔNG TY CỔ PHẦN THIẾT BỊ VÀ CÔNG NGHỆ HOÀNG VŨ competed with 347 contractors in 173 package, won 34 package, lost 130 package, 5 bidding package has no results, 4 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor CÔNG TY CỔ PHẦN THIẾT BỊ VÀ CÔNG NGHỆ HOÀNG VŨ once entered into a partnership with 42 contractors in 92 package, won bid 24 package, lost 65 package, 1 bidding package has no results, 2 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor CÔNG TY CỔ PHẦN THIẾT BỊ VÀ CÔNG NGHỆ HOÀNG VŨ participated in bidding in 14 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor CÔNG TY CỔ PHẦN THIẾT BỊ VÀ CÔNG NGHỆ HOÀNG VŨ participated in bidding in 15 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 70,725 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects
Add contractor