Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for contractors CULTURAL WORKS REPAIR EMBELLISH JOINT STOCK COMPANY are as follows:
You need to Login or Sign up to view all informations.
- Participated in 33 bidding packages, of which 32 were won, 1 were lost, 0 are pending results, and 0 were canceled.
- Total bid-winning value: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Lowest bid rate when participating: 0% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 96.36% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces participated in the bidding: Hà Nội (18), Undefined (15)
- Has relationships with 8 Bid Solicitors
- Has competed against 3 contractors in 2 bidding packages, won 1 packages, lost 0 packages, 1 are pending results, and 0 were canceled.
- Has collaborated with 1 contractors in 1 bidding packages, won 1 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Building organization name: CÔNG TY CỔ PHẦN TU BỔ TÔN TẠO CÔNG TRÌNH VĂN HÓA
- Construction capacity certificate code: 00043524
- Issuing Authority: Sở kế hoạch đầu tư Thành phố Hà Nội
- Field:
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Dân dụng
⚬ Giám sát thi công xây dựng công trình: Dân dụng
⚬ Giám sát thi công xây dựng công trình: Công nghiệp
⚬ Thi công xây dựng công trình: Dân dụng
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Competitiveness | ??? |
Enterprise scale | ??? |
Violation history | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
---|---|---|
Lower by 20% or more | 2 | 6.3% |
Lower by 10% to 20% | 0 | 0% |
Lower by 5% to 10% | 0 | 0% |
Lower by 1% to 5% | 16 | 50% |
Lower by 0% to 1% | 9 | 28.1% |
0% | 5 | 15.6% |
Higher by 0% to 1% | 0 | 0% |
Higher by 1% to 5% | 0 | 0% |
Higher by 5% to 10% | 0 | 0% |
Higher by 10% or more | 0 | 0% |
Unknown | 0 | 0% |
Total | 32 | 100% |
CULTURAL WORKS REPAIR EMBELLISH JOINT STOCK COMPANY lost the bidding for the Package No. 4: Supervision consultancy package, which was invited for bidding by the HA NOI AIC JOINT STOCK COMPANY through an Open bidding as an independent entity. Two other contractors also participated.
- Result: Lost
22/10/2024 09:54
CULTURAL WORKS REPAIR EMBELLISH JOINT STOCK COMPANY Won the bidding for the Package 6: Consultancy on verification of feasibility study report package, which was invited for bidding by the UBND huyện Sóc Sơn through an assign shorthand as an independent entity.
- Result: Won
15/10/2024 19:01
CULTURAL WORKS REPAIR EMBELLISH JOINT STOCK COMPANY Won the bidding for the Package 3: Consultancy for verification of Feasibility Study Report package, which was invited for bidding by the Ban quản lý dự án đầu tư xây dựng huyện Sóc Sơn through an assign shorthand as an independent entity.
- Result: Won
12/10/2024 16:32
CULTURAL WORKS REPAIR EMBELLISH JOINT STOCK COMPANY Won the bidding for the Package 4: Consultancy for verification of feasibility study report package, which was invited for bidding by the Ban quản lý dự án đầu tư xây dựng huyện Sóc Sơn through an assign shorthand as an independent entity.
- Result: Won
11/10/2024 19:22
CULTURAL WORKS REPAIR EMBELLISH JOINT STOCK COMPANY Won the bidding for the Package 6: Consultancy and verification of construction drawing design - cost estimate package, which was invited for bidding by the Ban quản lý dự án đầu tư xây dựng huyện Sóc Sơn through an assign shorthand as an independent entity.
- Result: Won
09/10/2024 20:04
CULTURAL WORKS REPAIR EMBELLISH JOINT STOCK COMPANY Won the bidding for the Package 6: Consultancy and verification of construction drawing design - cost estimate package, which was invited for bidding by the Ban quản lý dự án đầu tư xây dựng huyện Sóc Sơn through an assign shorthand as an independent entity.
- Result: Won
09/10/2024 19:53
CULTURAL WORKS REPAIR EMBELLISH JOINT STOCK COMPANY Won the bidding for the Package 6: Consultancy and verification of construction drawing design - cost estimate package, which was invited for bidding by the Ban quản lý dự án đầu tư xây dựng huyện Sóc Sơn through an assign shorthand as an independent entity.
- Result: Won
09/10/2024 18:46
CULTURAL WORKS REPAIR EMBELLISH JOINT STOCK COMPANY Won the bidding for the Package 3: Consultancy for verification of Feasibility Study Report package, which was invited for bidding by the Ban quản lý dự án đầu tư xây dựng huyện Sóc Sơn through an assign shorthand as an independent entity.
- Result: Won
04/10/2024 10:56
CULTURAL WORKS REPAIR EMBELLISH JOINT STOCK COMPANY Won the bidding for the Package 5: Consultancy and verification of construction drawing design - cost estimate package, which was invited for bidding by the Ban quản lý dự án đầu tư xây dựng huyện Sóc Sơn through an assign shorthand as an independent entity.
- Result: Won
03/10/2024 08:09
CULTURAL WORKS REPAIR EMBELLISH JOINT STOCK COMPANY Won the bidding for the Package 3: Consultancy for verification of Feasibility Study Report package, which was invited for bidding by the Ban quản lý dự án đầu tư xây dựng huyện Sóc Sơn through an assign shorthand as an independent entity.
- Result: Won
30/09/2024 09:24
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder CULTURAL WORKS REPAIR EMBELLISH JOINT STOCK COMPANY participated in 33 package, of which 32 package was won, failed 1 packages, 0 packages with no results, 0 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor CULTURAL WORKS REPAIR EMBELLISH JOINT STOCK COMPANY is related to 8 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor CULTURAL WORKS REPAIR EMBELLISH JOINT STOCK COMPANY competed with 3 contractors in 2 package, won 1 package, lost 0 package, 1 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor CULTURAL WORKS REPAIR EMBELLISH JOINT STOCK COMPANY once entered into a partnership with 1 contractors in 1 package, won bid 1 package, lost 0 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor CULTURAL WORKS REPAIR EMBELLISH JOINT STOCK COMPANY participated in bidding in 1 provinces/cities, 0 bidding packages were carried out nationwide, 0 bidding packages were carried out outside of Vietnam. The data table has been partially hidden, to see the full information please Login or Register
There are 63,772 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code