Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for contractors CÔNG TY TNHH GIA LONG LONG AN are as follows:
You need to Login or Sign up to view all informations.
- Participated in 18 bidding packages, of which 12 were won, 5 were lost, 1 are pending results, and 0 were canceled.
- Total bid-winning value: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Lowest bid rate when participating: 90% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 99.77% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces participated in the bidding: Long An (15), Undefined (3)
- Has relationships with 8 Bid Solicitors
- Has competed against 8 contractors in 7 bidding packages, won 1 packages, lost 2 packages, 4 are pending results, and 0 were canceled.
- Has collaborated with 2 contractors in 2 bidding packages, won 2 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Competitiveness | ??? |
Enterprise scale | ??? |
Violation history | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
---|---|---|
Lower by 20% or more | 0 | 0% |
Lower by 10% to 20% | 0 | 0% |
Lower by 5% to 10% | 0 | 0% |
Lower by 1% to 5% | 4 | 33.3% |
Lower by 0% to 1% | 7 | 58.3% |
0% | 0 | 0% |
Higher by 0% to 1% | 0 | 0% |
Higher by 1% to 5% | 0 | 0% |
Higher by 5% to 10% | 1 | 8.3% |
Higher by 10% or more | 0 | 0% |
Unknown | 0 | 0% |
Total | 12 | 100% |
CÔNG TY TNHH GIA LONG LONG AN lost the bidding for the Construction package, which was invited for bidding by the CÔNG TY CP XÂY DỰNG VÀ ĐÀO TẠO VIỆT through an Open bidding as an independent entity. Two other contractors also participated.
- Result: Lost
19/09/2024 10:10
CÔNG TY TNHH GIA LONG LONG AN lost the bidding for the Construction package, which was invited for bidding by the CÔNG TY CP XÂY DỰNG VÀ ĐÀO TẠO VIỆT through an Open bidding as an independent entity. Two other contractors also participated.
- Result: Lost
28/08/2024 10:38
CÔNG TY TNHH GIA LONG LONG AN lost the bidding for the Construction package, which was invited for bidding by the PHUONG VY CONSTRUCTION CONSULTANCY COMPANY LIMITED through an Open bidding as an independent entity. Two other contractors also participated.
- Result: Lost
26/08/2024 10:27
CÔNG TY TNHH GIA LONG LONG AN join for the Construction costs package, which was invited for bidding by the H&K CONSTRUCTION INVESTMENT CONSULTING COMPANY LIMITED through an Competitive Offer as an independent entity. One other contractors also participated.
29/07/2024 09:29
CÔNG TY TNHH GIA LONG LONG AN lost the bidding for the Civil Works package, which was invited for bidding by the CÔNG TY CP XÂY DỰNG VÀ ĐÀO TẠO VIỆT through an Open bidding as an independent entity. Two other contractors also participated.
- Result: Lost
15/07/2024 17:41
CÔNG TY TNHH GIA LONG LONG AN lost the bidding for the Construction Construction Package 1 package, which was invited for bidding by the CÔNG TY TNHH TƯ VẤN XÂY DỰNG VÀ THƯƠNG MẠI HIT through an Open bidding as an independent entity. Two other contractors also participated.
- Result: Lost
17/05/2024 11:00
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder CÔNG TY TNHH GIA LONG LONG AN participated in 18 package, of which 12 package was won, failed 5 packages, 1 packages with no results, 0 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor CÔNG TY TNHH GIA LONG LONG AN is related to 8 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor CÔNG TY TNHH GIA LONG LONG AN competed with 8 contractors in 7 package, won 1 package, lost 2 package, 4 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor CÔNG TY TNHH GIA LONG LONG AN once entered into a partnership with 2 contractors in 2 package, won bid 2 package, lost 0 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor CÔNG TY TNHH GIA LONG LONG AN participated in bidding in 1 provinces/cities, 0 bidding packages were carried out nationwide, 0 bidding packages were carried out outside of Vietnam. The data table has been partially hidden, to see the full information please Login or Register
There are 63,710 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code