Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for contractors CNS CONSTRUCTION INVESTMENT AND TECHNOLOGY SOLUTIONS COMPANY LIMITED are as follows:
You need to Login or Sign up to view all informations.
- Participated in 23 bidding packages, of which 6 were won, 17 were lost, 0 are pending results, and 0 were canceled.
- Total bid-winning value: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Lowest bid rate when participating: 82.98% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 95.22% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces participated in the bidding: Sơn La (3), Lai Châu (3), Hòa Bình (2), Lạng Sơn (2), Đà Nẵng (2), Hà Nội (1), Bắc Giang (1), Điện Biên (1), Quảng Ninh (1), Hải Phòng (1), Bắc Cạn (1), Bình Phước (1), Cao Bằng (1), Hà Nam (1), Undefined (2)
- Has relationships with 12 Bid Solicitors
- Has competed against 26 contractors in 19 bidding packages, won 2 packages, lost 9 packages, 8 are pending results, and 0 were canceled.
- Has collaborated with 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Building organization name: CÔNG TY TNHH GIẢI PHÁP CÔNG NGHỆ VÀ ĐẦU TƯ XÂY DỰNG CNS
- Construction capacity certificate code: 00082838
- Issuing Authority: Sở Kế hoạch và Đầu tư Thành phố Hà Nội
- Field:
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Thiết kế, thẩm tra thiết kế xây dựng công trình dân dụng, nhà công nghiệp
⚬ Thi công xây dựng công trình: Thi công công tác xây dựng công trình dân dụng
⚬ Thi công xây dựng công trình: Thi công công tác xây dựng công trình công nghiệp năng lượng (không bao gồm các nội dung về công nghệ thuộc chuyên ngành điện)
⚬ Thi công lắp đặt thiết bị vào công trình: Thi công lắp đặt thiết bị vào công trình dân dụng, nhà công nghiệp, công nghiệp năng lượng
⚬ Tư vấn giám sát công tác xây dựng công trình: Tư vấn giám sát công tác xây dựng công trình dân dụng, công nghiệp, hạ tầng kỹ thuật
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Competitiveness | ??? |
Enterprise scale | ??? |
Violation history | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
---|---|---|
Lower by 20% or more | 0 | 0% |
Lower by 10% to 20% | 1 | 16.7% |
Lower by 5% to 10% | 1 | 16.7% |
Lower by 1% to 5% | 2 | 33.3% |
Lower by 0% to 1% | 2 | 33.3% |
0% | 0 | 0% |
Higher by 0% to 1% | 0 | 0% |
Higher by 1% to 5% | 0 | 0% |
Higher by 5% to 10% | 0 | 0% |
Higher by 10% or more | 0 | 0% |
Unknown | 0 | 0% |
Total | 6 | 100% |
CNS CONSTRUCTION INVESTMENT AND TECHNOLOGY SOLUTIONS COMPANY LIMITED lost the bidding for the Consolidate and upgrade station infrastructure and renovate columns by 2024 in Son La package, which was invited for bidding by the VIETTEL NETWORKS CORPORATION- BRANCH OF VIETTEL GROUP through an Open bidding as master consortium of CÔNG TY TNHH GIẢI PHÁP CÔNG NGHỆ VÀ ĐẦU TƯ XÂY DỰNG CNS. Two other contractors also participated.
- Result: Lost
02/10/2024 10:46
CNS CONSTRUCTION INVESTMENT AND TECHNOLOGY SOLUTIONS COMPANY LIMITED lost the bidding for the Package No. 24052649-DTRR-DNG-2024: Consolidating and upgrading station infrastructure and renovating columns in 2024 in Da Nang package, which was invited for bidding by the VIETTEL NETWORKS CORPORATION- BRANCH OF VIETTEL GROUP through an Open bidding as master consortium of CÔNG TY TNHH GIẢI PHÁP CÔNG NGHỆ VÀ ĐẦU TƯ XÂY DỰNG CNS. Five other contractors also participated.
- Result: Lost
01/10/2024 11:31
CNS CONSTRUCTION INVESTMENT AND TECHNOLOGY SOLUTIONS COMPANY LIMITED lost the bidding for the Consolidate and upgrade station infrastructure and renovate columns by 2024 in Ha Nam package, which was invited for bidding by the VIETTEL NETWORKS CORPORATION- BRANCH OF VIETTEL GROUP through an Open bidding as master consortium of CÔNG TY TNHH GIẢI PHÁP CÔNG NGHỆ VÀ ĐẦU TƯ XÂY DỰNG CNS. Two other contractors also participated.
- Result: Lost
11/09/2024 14:36
CNS CONSTRUCTION INVESTMENT AND TECHNOLOGY SOLUTIONS COMPANY LIMITED lost the bidding for the 290502-DTRR-VTNet-XL 2024: Construction of renovation and upgrading of the electrical system for the BTS station in 2024 in Bac Kan package, which was invited for bidding by the VIETTEL NETWORKS CORPORATION- BRANCH OF VIETTEL GROUP through an Open bidding as an independent entity. One other contractors also participated.
- Result: Lost
15/08/2024 17:55
CNS CONSTRUCTION INVESTMENT AND TECHNOLOGY SOLUTIONS COMPANY LIMITED lost the bidding for the 290504-DTRR-VTNet-XL 2024: Construction, renovation and upgrading of the electrical system for the BTS station in 2024 in Cao Bang package, which was invited for bidding by the VIETTEL NETWORKS CORPORATION- BRANCH OF VIETTEL GROUP through an Open bidding as an independent entity. Two other contractors also participated.
- Result: Lost
15/08/2024 17:07
CNS CONSTRUCTION INVESTMENT AND TECHNOLOGY SOLUTIONS COMPANY LIMITED lost the bidding for the 290546-DTRR-VTNet-XL 2024: Construction of renovation and upgrading of electrical system for BTS station in 2024 in Binh Phuoc package, which was invited for bidding by the VIETTEL NETWORKS CORPORATION- BRANCH OF VIETTEL GROUP through an Open bidding as an independent entity. One other contractors also participated.
- Result: Lost
15/08/2024 15:46
CNS CONSTRUCTION INVESTMENT AND TECHNOLOGY SOLUTIONS COMPANY LIMITED lost the bidding for the 290506-DTRR-VTNet-XL 2024: Construction of renovation and upgrading of the electrical system for the BTS station in 2024 in Hoa Binh package, which was invited for bidding by the VIETTEL NETWORKS CORPORATION- BRANCH OF VIETTEL GROUP through an Open bidding as an independent entity. Two other contractors also participated.
- Result: Lost
15/08/2024 09:14
CNS CONSTRUCTION INVESTMENT AND TECHNOLOGY SOLUTIONS COMPANY LIMITED lost the bidding for the 290514-DTRR-VTNet-XL 2024: Construction of renovation and upgrading of the electrical system for the BTS station in 2024 in Lai Chau package, which was invited for bidding by the VIETTEL NETWORKS CORPORATION- BRANCH OF VIETTEL GROUP through an Open bidding as an independent entity. Two other contractors also participated.
- Result: Lost
15/08/2024 09:11
CNS CONSTRUCTION INVESTMENT AND TECHNOLOGY SOLUTIONS COMPANY LIMITED Won the bidding for the Package No. 12-DTRR-VTNet-XL-LSN 2024: New construction, consolidation and upgrading of BTS station infrastructure in 2022 in Lang Son province package, which was invited for bidding by the VIETTEL NETWORKS CORPORATION- BRANCH OF VIETTEL GROUP through an Open bidding as an independent entity.
- Result: Won
22/07/2024 11:18
CNS CONSTRUCTION INVESTMENT AND TECHNOLOGY SOLUTIONS COMPANY LIMITED Won the bidding for the Package No. 26-DTRR-VTNet-XL-SLA 2024: New construction, consolidation and upgrading of BTS station infrastructure in 2022 in Son La province package, which was invited for bidding by the VIETTEL NETWORKS CORPORATION- BRANCH OF VIETTEL GROUP through an Open bidding as an independent entity.
- Result: Won
16/07/2024 11:40
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder CNS CONSTRUCTION INVESTMENT AND TECHNOLOGY SOLUTIONS COMPANY LIMITED participated in 23 package, of which 6 package was won, failed 17 packages, 0 packages with no results, 0 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor CNS CONSTRUCTION INVESTMENT AND TECHNOLOGY SOLUTIONS COMPANY LIMITED is related to 12 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor CNS CONSTRUCTION INVESTMENT AND TECHNOLOGY SOLUTIONS COMPANY LIMITED competed with 26 contractors in 19 package, won 2 package, lost 9 package, 8 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor CNS CONSTRUCTION INVESTMENT AND TECHNOLOGY SOLUTIONS COMPANY LIMITED participated in bidding in 14 provinces/cities, 0 bidding packages were carried out nationwide, 0 bidding packages were carried out outside of Vietnam. The data table has been partially hidden, to see the full information please Login or Register
There are 63,806 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Add contractor
Security Code