Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
History of active status changes
Data analysis results of DauThau.info software for contractors VTN EQUIPMENT SOLUTIONS INDUSTRY COMPANY LIMITED are as follows:
You need to Login or Sign up to view all informations.
- Participated in 594 bidding packages, of which 145 were won, 409 were lost, 26 are pending results, and 14 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 40.84% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 79.77% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Lâm Đồng (82), Đắk Lắk (49), Hà Nội (45), Đà Nẵng (43), Thanh Hoá (36), Tuyên Quang (34), Lai Châu (34), Sơn La (33), Quảng Ninh (30), Nghệ An (28), Cần Thơ (26), Phú Thọ (17), Đồng Nai (16), TP.Hồ Chí Minh (14), Hải Phòng (14), Gia Lai (12), Hưng Yên (12), Vĩnh Long (12), Cà Mau (11), Quảng Trị (6), Khánh Hòa (6), Huế (3), Hà Tĩnh (3), Lào Cai (1), Undefined (54)
- Provinces before the merger where the contractor has participated in bidding : Lâm Đồng (59), Hà Nội (45), Đắk Lắk (42), Thanh Hoá (36), Lai Châu (34), Sơn La (33), Tuyên Quang (32), Quảng Ninh (30), Nghệ An (28), Đà Nẵng (24), Quảng Nam (19), Cần Thơ (16), Hòa Bình (14), Bình Thuận (14), Thái Bình (12), Gia Lai (11), Đắk Nông (11), Bà Rịa - Vũng Tàu (9), Đồng Nai (9), Hải Phòng (8), Bình Phước (7), Cà Mau (7), Quảng Trị (6), Trà Vinh (6), TP.Hồ Chí Minh (5), Phú Yên (5), Ninh Thuận (5), Hậu Giang (5), Hải Dương (4), Huế (3), Phú Thọ (3), Hà Tĩnh (3), Bình Định (2), Yên Bái (1), Hà Giang (1), Undefined (88)
- Has relationships with 103 Bid Solicitors
- Has competed against 756 contractors in 580 bidding packages, won 134 packages, lost 399 packages, 35 are pending results, and 12 were canceled.
- Has collaborated with 11 contractors in 11 bidding packages, won 2 packages, lost 7 packages, 2 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 0 bidding packages with 0 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 59 | 40.7% |
| Lower by 10% to 20% | 51 | 35.2% |
| Lower by 5% to 10% | 19 | 13.1% |
| Lower by 1% to 5% | 12 | 8.3% |
| Lower by 0% to 1% | 2 | 1.4% |
| 0% | 0 | 0% |
| Higher by 0% to 1% | 0 | 0% |
| Higher by 1% to 5% | 0 | 0% |
| Higher by 5% to 10% | 1 | 0.7% |
| Higher by 10% or more | 1 | 0.7% |
| Unknown | 0 | 0% |
| Total | 145 | 100% |
VTN EQUIPMENT SOLUTIONS INDUSTRY COMPANY LIMITED lost the bidding for the Supplying materials for repair and maintenance of lighting systems package, which was invited for bidding by the through an Open bidding as an independent entity. Fourteen other contractors also participated.
- Result: Lost
13/01/2026 17:14
VTN EQUIPMENT SOLUTIONS INDUSTRY COMPANY LIMITED lost the bidding for the Equipped with replacement materials in April 2025 package, which was invited for bidding by the PETRO VIETNAM CAMAU POWER COMPANY through an Open bidding as an independent entity. One other contractors also participated.
- Result: Lost
12/01/2026 08:50
VTN EQUIPMENT SOLUTIONS INDUSTRY COMPANY LIMITED join for the Providing replacement materials for regular repair work in the first phase of 2026 package, which was invited for bidding by the through an Open bidding as an independent entity. Two other contractors also participated.
12/01/2026 07:35
VTN EQUIPMENT SOLUTIONS INDUSTRY COMPANY LIMITED join for the 01HH-SCL-2026: Procurement of electrical materials and equipment to serve SCL Unit H2 of Dong Nai 4 Hydropower Plant and other equipment systems of Dong Nai 3 and 4 Hydropower Plant package, which was invited for bidding by the through an Open bidding as an independent entity. Three other contractors also participated.
09/01/2026 15:01
VTN EQUIPMENT SOLUTIONS INDUSTRY COMPANY LIMITED lost the bidding for the Equipped with replacement materials in May 2025 package, which was invited for bidding by the PETRO VIETNAM CAMAU POWER COMPANY through an Open bidding as an independent entity. Three other contractors also participated.
- Result: Lost
07/01/2026 11:04
VTN EQUIPMENT SOLUTIONS INDUSTRY COMPANY LIMITED lost the bidding for the 17HH-SXKD.UB-2025: Providing power consumption, control measurement package, which was invited for bidding by the through an Open bidding as an independent entity. One other contractors also participated.
- Result: Lost
06/01/2026 15:55
VTN EQUIPMENT SOLUTIONS INDUSTRY COMPANY LIMITED lost the bidding for the 16HH-SCL-2026: Supplying paint for repair work of Unit S2 - Duyen Hai 1 Thermal Power Plant package, which was invited for bidding by the through an Competitive Offer as an independent entity. Three other contractors also participated.
- Result: Lost
05/01/2026 16:30
VTN EQUIPMENT SOLUTIONS INDUSTRY COMPANY LIMITED join for the 02HH-SXKD-2026: Procurement of materials, mechanical equipment and consumables for SCTX - Phase 1 of 2026 package, which was invited for bidding by the through an Open bidding as an independent entity. Three other contractors also participated.
29/12/2025 15:03
VTN EQUIPMENT SOLUTIONS INDUSTRY COMPANY LIMITED join for the 01HH-SXKD-2026: Procurement of materials and electrical equipment to serve SCTX - Phase 1 of 2026 package, which was invited for bidding by the through an Open bidding as an independent entity. Four other contractors also participated.
29/12/2025 15:03
VTN EQUIPMENT SOLUTIONS INDUSTRY COMPANY LIMITED join for the Providing materials and equipment for periodic repair of equipment systems of Hua Na Hydropower Plant in 2026 (Minor repair) package, which was invited for bidding by the through an Open bidding as an independent entity. Four other contractors also participated.
25/12/2025 15:01
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder VTN EQUIPMENT SOLUTIONS INDUSTRY COMPANY LIMITED participated in 594 package, of which 145 package was won, failed 409 packages, 26 packages with no results, 14 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor VTN EQUIPMENT SOLUTIONS INDUSTRY COMPANY LIMITED is related to 103 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor VTN EQUIPMENT SOLUTIONS INDUSTRY COMPANY LIMITED competed with 756 contractors in 580 package, won 134 package, lost 399 package, 35 bidding package has no results, 12 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor VTN EQUIPMENT SOLUTIONS INDUSTRY COMPANY LIMITED once entered into a partnership with 11 contractors in 11 package, won bid 2 package, lost 7 package, 2 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor VTN EQUIPMENT SOLUTIONS INDUSTRY COMPANY LIMITED participated in bidding in 24 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor VTN EQUIPMENT SOLUTIONS INDUSTRY COMPANY LIMITED participated in bidding in 35 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 68,723 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects
Add contractor