Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
History of active status changes
Data analysis results of DauThau.info software for contractors CÔNG TY TNHH MỘT THÀNH VIÊN CÔNG NGHỆ MÔI TRƯỜNG CDM are as follows:
You need to Login or Sign up to view all informations.
- Participated in 73 bidding packages, of which 57 were won, 14 were lost, 0 are pending results, and 2 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 55.94% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 98.29% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Cần Thơ (29), Vĩnh Long (14), Cà Mau (5), An Giang (3), Undefined (22)
- Provinces before the merger where the contractor has participated in bidding : Vĩnh Long (11), Hậu Giang (11), Cần Thơ (7), Sóc Trăng (7), Bạc Liêu (3), Kiên Giang (2), Cà Mau (2), Trà Vinh (1), An Giang (1), Undefined (28)
- Has relationships with 33 Bid Solicitors
- Has competed against 77 contractors in 31 bidding packages, won 15 packages, lost 14 packages, 0 are pending results, and 2 were canceled.
- Has collaborated with 26 contractors in 19 bidding packages, won 13 packages, lost 4 packages, 0 are pending results, and 2 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 0 bidding packages with 0 roles.
- Building organization name: Công ty TNHH MTV Công nghệ Môi trường CDM
- Construction capacity certificate code: 00053293
- Issuing Authority: Sở Kế hoạch và Đầu tư thành phố Cần Thơ
- Field:
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Thiết kế, thẩm tra thiết kế xây dựng công trình HTKT: Cấp nước, thoát nước Cấp nước, Thoát nước
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 3 | 5.3% |
| Lower by 10% to 20% | 6 | 10.5% |
| Lower by 5% to 10% | 3 | 5.3% |
| Lower by 1% to 5% | 7 | 12.3% |
| Lower by 0% to 1% | 6 | 10.5% |
| 0% | 25 | 43.9% |
| Higher by 0% to 1% | 0 | 0% |
| Higher by 1% to 5% | 1 | 1.8% |
| Higher by 5% to 10% | 2 | 3.5% |
| Higher by 10% or more | 4 | 7% |
| Unknown | 0 | 0% |
| Total | 57 | 100% |
CÔNG TY TNHH MỘT THÀNH VIÊN CÔNG NGHỆ MÔI TRƯỜNG CDM Won the bidding for the Package No. 05: Advice on making reports on environmental licensing proposals package, which was invited for bidding by the BAN QUẢN LÝ DỰ ÁN ĐẦU TƯ XÂY DỰNG CÔNG TRÌNH DÂN DỤNG VÀ CÔNG NGHIỆP THÀNH PHỐ CẦN THƠ through an assign shorthand as an independent entity.
- Result: Won
07/01/2026 09:29
CÔNG TY TNHH MỘT THÀNH VIÊN CÔNG NGHỆ MÔI TRƯỜNG CDM Won the bidding for the Package No. 05: Consulting on preparing Environmental Registration Report package, which was invited for bidding by the BAN QUẢN LÝ DỰ ÁN ĐẦU TƯ XÂY DỰNG CÔNG TRÌNH DÂN DỤNG VÀ CÔNG NGHIỆP THÀNH PHỐ CẦN THƠ through an assign shorthand as an independent entity.
- Result: Won
06/01/2026 14:28
CÔNG TY TNHH MỘT THÀNH VIÊN CÔNG NGHỆ MÔI TRƯỜNG CDM Won the bidding for the Consulting on preparing documents for licensing to extend the exploitation and use of surface and underground water. package, which was invited for bidding by the Trung Tâm Nước Sạch Nông Thôn through an assign shorthand as an independent entity.
- Result: Won
26/12/2025 16:23
CÔNG TY TNHH MỘT THÀNH VIÊN CÔNG NGHỆ MÔI TRƯỜNG CDM Won the bidding for the Package No. 5: Construction and installation of construction equipment package, which was invited for bidding by the Ban Quản lý dự án giao thông tỉnh Vĩnh Long through an Open bidding as master consortium of Liên danh CDM - Hạnh Giàu. One other contractors also participated.
- Result: Won
14/11/2025 16:24
CÔNG TY TNHH MỘT THÀNH VIÊN CÔNG NGHỆ MÔI TRƯỜNG CDM join for the Package No. 5: Construction and installation of construction equipment package, which was invited for bidding by the Ban Quản lý dự án giao thông tỉnh Vĩnh Long through an Open bidding as master consortium of CÔNG TY TNHH MỘT THÀNH VIÊN CÔNG NGHỆ MÔI TRƯỜNG CDM . One other contractors also participated.
- Result: Tender opening completed
30/10/2025 17:10
CÔNG TY TNHH MỘT THÀNH VIÊN CÔNG NGHỆ MÔI TRƯỜNG CDM lost the bidding for the Package 12: Equipment for wastewater treatment system items package, which was invited for bidding by the Ban Quản lý dự án đầu tư xây dựng các công trình dân dụng và công nghiệp Bạc Liêu through an Competitive Offer as an independent entity. Nine other contractors also participated.
- Result: Lost
29/10/2025 10:31
CÔNG TY TNHH MỘT THÀNH VIÊN CÔNG NGHỆ MÔI TRƯỜNG CDM Won the bidding for the Package No. 68: Construction and installation of waste incinerator equipment package, which was invited for bidding by the Project Management Board for Investment in Civil and Industrial Construction of Cần Thơ City through an Open bidding as master consortium of Liên danh CDM - Hưng Phát. One other contractors also participated.
- Result: Won
09/10/2025 14:45
CÔNG TY TNHH MỘT THÀNH VIÊN CÔNG NGHỆ MÔI TRƯỜNG CDM Won the bidding for the Package number 9 package, which was invited for bidding by the Trung tâm Nước sạch nông thôn through an Open bidding as an independent entity.
- Result: Won
02/10/2025 08:26
CÔNG TY TNHH MỘT THÀNH VIÊN CÔNG NGHỆ MÔI TRƯỜNG CDM join for the Package 12: Equipment for wastewater treatment system items package, which was invited for bidding by the Ban Quản lý dự án đầu tư xây dựng các công trình dân dụng và công nghiệp Bạc Liêu through an Competitive Offer as an independent entity. Nine other contractors also participated.
- Result: Tender opening completed
23/09/2025 09:02
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder CÔNG TY TNHH MỘT THÀNH VIÊN CÔNG NGHỆ MÔI TRƯỜNG CDM participated in 73 package, of which 57 package was won, failed 14 packages, 0 packages with no results, 2 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor CÔNG TY TNHH MỘT THÀNH VIÊN CÔNG NGHỆ MÔI TRƯỜNG CDM is related to 33 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor CÔNG TY TNHH MỘT THÀNH VIÊN CÔNG NGHỆ MÔI TRƯỜNG CDM competed with 77 contractors in 31 package, won 15 package, lost 14 package, 0 bidding package has no results, 2 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor CÔNG TY TNHH MỘT THÀNH VIÊN CÔNG NGHỆ MÔI TRƯỜNG CDM once entered into a partnership with 26 contractors in 19 package, won bid 13 package, lost 4 package, 0 bidding package has no results, 2 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor CÔNG TY TNHH MỘT THÀNH VIÊN CÔNG NGHỆ MÔI TRƯỜNG CDM participated in bidding in 4 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor CÔNG TY TNHH MỘT THÀNH VIÊN CÔNG NGHỆ MÔI TRƯỜNG CDM participated in bidding in 9 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 68,725 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects
Add contractor