Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
History of active status changes
| Updated time | Active status | Lý do |
|---|---|---|
|
12:06 AM 12/27/2022 |
Pause |
Temporarily suspended due to overdue fees |
|
9:04 AM 12/29/2022 |
Active |
At the request of QTHT |
|
12:02 AM 03/28/2023 |
Pause |
Temporarily suspended due to overdue fees |
|
3:54 PM 03/31/2023 |
Active |
At the request of QTHT |
Data analysis results of DauThau.info software for contractors CÔNG TY TNHH TƯ VẤN & XÂY LẮP MINH TUẤN TÚ are as follows:
You need to Login or Sign up to view all informations.
- Participated in 50 bidding packages, of which 32 were won, 17 were lost, 0 are pending results, and 1 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 53.42% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 92.65% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Đà Nẵng (45), Undefined (5)
- Provinces before the merger where the contractor has participated in bidding : Đà Nẵng (31), Quảng Nam (8), Undefined (11)
- Has relationships with 24 Bid Solicitors
- Has relationships with 21 Bid Investors
- Has competed against 136 contractors in 34 bidding packages, won 16 packages, lost 17 packages, 0 are pending results, and 1 were canceled.
- Has collaborated with 19 contractors in 26 bidding packages, won 14 packages, lost 11 packages, 0 are pending results, and 1 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 0 bidding packages with 0 roles.
- Building organization name: Công ty TNHH Tư vấn và xây lắp Minh Tuấn Tú
- Construction capacity certificate code: 00018250
- Issuing Authority: Sở Kế hoạch và Đầu tư thành phố Đà Nẵng
- Field:
⚬ Thi công xây dựng công trình: Hạ tầng kỹ thuật Cấp nước, thoát nước
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 6 | 18.8% |
| Lower by 10% to 20% | 2 | 6.3% |
| Lower by 5% to 10% | 4 | 12.5% |
| Lower by 1% to 5% | 10 | 31.3% |
| Lower by 0% to 1% | 6 | 18.8% |
| 0% | 1 | 3.1% |
| Higher by 0% to 1% | 2 | 6.3% |
| Higher by 1% to 5% | 1 | 3.1% |
| Higher by 5% to 10% | 0 | 0% |
| Higher by 10% or more | 0 | 0% |
| Unknown | 0 | 0% |
| Total | 32 | 100% |
CÔNG TY TNHH TƯ VẤN & XÂY LẮP MINH TUẤN TÚ Won the bidding for the Civil Works package, which was invited for bidding by the Ban Quản lý dự án đầu tư xây dựng Quảng Nam through an Open bidding as sub-joint of Liên danh Trang trí Tết Tam Kỳ - Hội An.
- Result: Won
17/01/2026 10:10
CÔNG TY TNHH TƯ VẤN & XÂY LẮP MINH TUẤN TÚ Won the bidding for the Construction and installation of flower decorations and lighting for Tet 2026 package, which was invited for bidding by the Ban Quản lý dự án đầu tư xây dựng các công trình dân dụng, công nghiệp và hạ tầng kỹ thuật Đà Nẵng through an Open bidding as sub-joint of Liên danh Trang trí hoa và điện chiếu sáng phục vụ Tết năm 2026.
- Result: Won
23/12/2025 10:49
CÔNG TY TNHH TƯ VẤN & XÂY LẮP MINH TUẤN TÚ lost the bidding for the Construction package, which was invited for bidding by the Da Nang Project Management Unit of Investment - Construction of Transport and Agriculture Works through an Open bidding as sub-joint of CÔNG TY TNHH TƯ VẤN & XÂY LẮP MINH TUẤN TÚ. Eleven other contractors also participated.
- Result: Lost
15/12/2025 14:50
CÔNG TY TNHH TƯ VẤN & XÂY LẮP MINH TUẤN TÚ lost the bidding for the Package No. 2: Supply and installation of project equipment Decoration of roof lighting for departure and arrival halls of terminal T1 package, which was invited for bidding by the DANANG INTERNATIONAL AIRPORT through an Competitive Offer as sub-joint of CÔNG TY TNHH TƯ VẤN & XÂY LẮP MINH TUẤN TÚ. Six other contractors also participated.
- Result: Lost
10/12/2025 18:24
CÔNG TY TNHH TƯ VẤN & XÂY LẮP MINH TUẤN TÚ join for the Construction package, which was invited for bidding by the Da Nang Project Management Unit of Investment - Construction of Transport and Agriculture Works through an Open bidding as sub-joint of CÔNG TY TNHH TƯ VẤN & XÂY LẮP MINH TUẤN TÚ. Eleven other contractors also participated.
- Result: Tender opening completed
27/11/2025 16:21
CÔNG TY TNHH TƯ VẤN & XÂY LẮP MINH TUẤN TÚ join for the Package No. 2: Supply and installation of project equipment Decoration of roof lighting for departure and arrival halls of terminal T1 package, which was invited for bidding by the DANANG INTERNATIONAL AIRPORT through an Competitive Offer as sub-joint of CÔNG TY TNHH TƯ VẤN & XÂY LẮP MINH TUẤN TÚ. Six other contractors also participated.
- Result: Tender opening completed
17/11/2025 15:04
CÔNG TY TNHH TƯ VẤN & XÂY LẮP MINH TUẤN TÚ lost the bidding for the Construction package, which was invited for bidding by the through an Open bidding as sub-joint of CÔNG TY TNHH TƯ VẤN & XÂY LẮP MINH TUẤN TÚ. Ten other contractors also participated.
- Result: Lost
29/09/2025 16:24
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder CÔNG TY TNHH TƯ VẤN & XÂY LẮP MINH TUẤN TÚ participated in 50 package, of which 32 package was won, failed 17 packages, 0 packages with no results, 1 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor CÔNG TY TNHH TƯ VẤN & XÂY LẮP MINH TUẤN TÚ is related to 24 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor CÔNG TY TNHH TƯ VẤN & XÂY LẮP MINH TUẤN TÚ has a relationship with 21 the investor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor CÔNG TY TNHH TƯ VẤN & XÂY LẮP MINH TUẤN TÚ competed with 136 contractors in 34 package, won 16 package, lost 17 package, 0 bidding package has no results, 1 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor CÔNG TY TNHH TƯ VẤN & XÂY LẮP MINH TUẤN TÚ once entered into a partnership with 19 contractors in 26 package, won bid 14 package, lost 11 package, 0 bidding package has no results, 1 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor CÔNG TY TNHH TƯ VẤN & XÂY LẮP MINH TUẤN TÚ participated in bidding in 1 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor CÔNG TY TNHH TƯ VẤN & XÂY LẮP MINH TUẤN TÚ participated in bidding in 2 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 72,215 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
Add contractor