Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
| Company name | CÔNG TY TRÁCH NHIỆM HỮU HẠN MỘT THÀNH VIÊN THÁI HẢI |
|
| Views | 1727 | |
| Business Tax ID | 1200395886 | |
| Tax ID issue date | 20/11/1997 | |
| Tax ID issue country | Việt Nam | |
| Business Registration ID | vn1200395886 | |
| Head office address after merger | Ấp Thới, Xã Long Định, Đồng Tháp | |
| Business | Civil Works | |
| Form of Business | Single member limited liability company | |
| Company Establishment Date | 16/05/2013 | |
| The number of workers | 56 | |
| Date of registration on the Public procurement system | 30/07/2014 | |
| Payment Status |
Paid
According to Circular 06/2021, from March 3, 2022, investors and contractors will be stopped from trading if they do not pay fees for posting information, selecting contractors, investors on the national bidding network system. Please verify your account on DauThau.Net so that the system automatically sends mail remind you when you forget to renew. |
|
| Legal representative | NGUYỄN THỊ BÉ | |
| Position | Director | |
| Attached files |
Adjust business operations Organizational chart Business registration certificate
|
|
| Enterprise scale | Small business | |
Business industry of CÔNG TY TRÁCH NHIỆM HỮU HẠN MỘT THÀNH VIÊN THÁI HẢI |
||
|
|
||
History of active status changes
Data analysis results of DauThau.info software for contractors CÔNG TY TRÁCH NHIỆM HỮU HẠN MỘT THÀNH VIÊN THÁI HẢI are as follows:
You need to Login or Sign up to view all informations.
- Participated in 271 bidding packages, of which 75 were won, 189 were lost, 3 are pending results, and 4 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 59.81% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 88.58% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Đồng Tháp (216), Tây Ninh (6), Vĩnh Long (1), Undefined (48)
- Provinces before the merger where the contractor has participated in bidding : Tiền Giang (212), Long An (6), Bến Tre (1), Undefined (52)
- Has relationships with 15 Bid Solicitors
- Has competed against 80 contractors in 253 bidding packages, won 58 packages, lost 189 packages, 4 are pending results, and 2 were canceled.
- Has collaborated with 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 0 bidding packages with 0 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 22 | 29.3% |
| Lower by 10% to 20% | 22 | 29.3% |
| Lower by 5% to 10% | 15 | 20% |
| Lower by 1% to 5% | 5 | 6.7% |
| Lower by 0% to 1% | 7 | 9.3% |
| 0% | 0 | 0% |
| Higher by 0% to 1% | 0 | 0% |
| Higher by 1% to 5% | 0 | 0% |
| Higher by 5% to 10% | 0 | 0% |
| Higher by 10% or more | 4 | 5.3% |
| Unknown | 0 | 0% |
| Total | 75 | 100% |
CÔNG TY TRÁCH NHIỆM HỮU HẠN MỘT THÀNH VIÊN THÁI HẢI Won the bidding for the Construction of electrical relocation items package, which was invited for bidding by the Ban Quản lý dự án đầu tư xây dựng công trình giao thông tỉnh Đồng Tháp through an Open bidding as an independent entity. Three other contractors also participated.
- Result: Won
31/12/2025 21:25
CÔNG TY TRÁCH NHIỆM HỮU HẠN MỘT THÀNH VIÊN THÁI HẢI join for the Construction of electrical relocation items package, which was invited for bidding by the Ban Quản lý dự án đầu tư xây dựng công trình giao thông tỉnh Đồng Tháp through an Open bidding as an independent entity. Three other contractors also participated.
- Result: Tender opening completed
20/12/2025 09:01
CÔNG TY TRÁCH NHIỆM HỮU HẠN MỘT THÀNH VIÊN THÁI HẢI Won the bidding for the Construction of electrical relocation items package, which was invited for bidding by the TienGiang PPMU through an assign shorthand as an independent entity.
- Result: Won
05/11/2025 15:35
CÔNG TY TRÁCH NHIỆM HỮU HẠN MỘT THÀNH VIÊN THÁI HẢI lost the bidding for the Construction and installation of equipment to upgrade the power grid from 1 phase to 3 phases of Chau Thanh Power Area in 2025 package, which was invited for bidding by the CÔNG TY ĐIỆN LỰC ĐỒNG THÁP through an Open bidding as an independent entity. Seven other contractors also participated.
- Result: Lost
07/09/2025 09:50
CÔNG TY TRÁCH NHIỆM HỮU HẠN MỘT THÀNH VIÊN THÁI HẢI lost the bidding for the Construction and installation of equipment to upgrade the grid from 1 phase to 3 phase Cai Lay Power Area in 2025 package, which was invited for bidding by the CÔNG TY ĐIỆN LỰC ĐỒNG THÁP through an Open bidding as an independent entity. Three other contractors also participated.
- Result: Lost
03/09/2025 16:53
CÔNG TY TRÁCH NHIỆM HỮU HẠN MỘT THÀNH VIÊN THÁI HẢI Won the bidding for the Construction and installation of construction equipment: Upgrading the grid from 1 phase to 3 phases of Cai Be Power Area in 2025. package, which was invited for bidding by the CÔNG TY ĐIỆN LỰC ĐỒNG THÁP through an Open bidding as an independent entity. Two other contractors also participated.
- Result: Won
03/09/2025 14:33
CÔNG TY TRÁCH NHIỆM HỮU HẠN MỘT THÀNH VIÊN THÁI HẢI join for the Construction and installation of equipment to upgrade the grid from 1 phase to 3 phase Cai Lay Power Area in 2025 package, which was invited for bidding by the CÔNG TY ĐIỆN LỰC ĐỒNG THÁP through an Open bidding as an independent entity. Three other contractors also participated.
- Result: Tender opening completed
21/08/2025 09:04
CÔNG TY TRÁCH NHIỆM HỮU HẠN MỘT THÀNH VIÊN THÁI HẢI join for the Construction and installation of equipment to upgrade the power grid from 1 phase to 3 phases of Chau Thanh Power Area in 2025 package, which was invited for bidding by the CÔNG TY ĐIỆN LỰC ĐỒNG THÁP through an Open bidding as an independent entity. Seven other contractors also participated.
- Result: Tender opening completed
21/08/2025 09:03
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder CÔNG TY TRÁCH NHIỆM HỮU HẠN MỘT THÀNH VIÊN THÁI HẢI participated in 271 package, of which 75 package was won, failed 189 packages, 3 packages with no results, 4 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor CÔNG TY TRÁCH NHIỆM HỮU HẠN MỘT THÀNH VIÊN THÁI HẢI is related to 15 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor CÔNG TY TRÁCH NHIỆM HỮU HẠN MỘT THÀNH VIÊN THÁI HẢI competed with 80 contractors in 253 package, won 58 package, lost 189 package, 4 bidding package has no results, 2 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor CÔNG TY TRÁCH NHIỆM HỮU HẠN MỘT THÀNH VIÊN THÁI HẢI participated in bidding in 3 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor CÔNG TY TRÁCH NHIỆM HỮU HẠN MỘT THÀNH VIÊN THÁI HẢI participated in bidding in 3 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 68,723 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects
Add contractor