Data analysis results of DauThau.info software for contractors FECON CORPORATION are as follows:
You need to Login or Sign up to view all informations.
- Participated in 33 bidding packages, of which 17 were won, 13 were lost, 3 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 38.26% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 91.52% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Hà Nội (7), Cần Thơ (4), Quảng Trị (4), TP.Hồ Chí Minh (3), Hà Tĩnh (3), Nghệ An (3), Hải Phòng (2), Đồng Nai (2), Ninh Bình (1), Huế (1), Undefined (9)
- Provinces before the merger where the contractor has participated in bidding : Hà Nội (7), Quảng Bình (4), Hà Tĩnh (3), Nghệ An (3), TP.Hồ Chí Minh (2), Cần Thơ (2), Hải Phòng (2), Đồng Nai (2), Hà Nam (1), Hậu Giang (1), Sóc Trăng (1), Bà Rịa - Vũng Tàu (1), Huế (1), Undefined (10)
- Has relationships with 26 Bid Solicitors
- Has competed against 126 contractors in 20 bidding packages, won 6 packages, lost 13 packages, 1 are pending results, and 0 were canceled.
- Has collaborated with 42 contractors in 20 bidding packages, won 11 packages, lost 9 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 2 bidding packages with 2 roles.
- Building organization name: CÔNG TY CỔ PHẦN FECON
- Construction capacity certificate code: 00002360
- Issuing Authority: Sở Kế hoạch và Đầu tư thành phố Hà Nội
- Field:
⚬ Thi công xây dựng công trình: Dân dụng Phần thân
⚬ Thi công xây dựng công trình: Công nghiệp Phần thân
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Dân dụng
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Công nghiệp Năng lượng
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Công nghiệp nhẹ
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Hạ tầng kỹ thuật
⚬ Thi công xây dựng công trình: Hạ tầng kỹ thuật
⚬ Thi công xây dựng công trình: Giao thông Cầu, hầm, đường sắt, đường thủy nội địa, hàng hải
⚬ Thi công xây dựng công trình: NN&PTNT
⚬ Thi công xây dựng công trình: Công nghiệp Năng lượng (điện gió)
⚬ Thi công xây dựng công trình: Thi công công tác xây dựng công trình Dân dụng
⚬ Thi công xây dựng công trình: Thi công công tác xây dựng công trình Giao thông (hàng hải, đường thủy nội địa)
- Year started in TOP 500: 2016 (VNR500), 2012 (VNR500 private)
- Industry: Other Construction Activities
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 6 | 35.3% |
| Lower by 10% to 20% | 3 | 17.6% |
| Lower by 5% to 10% | 5 | 29.4% |
| Lower by 1% to 5% | 1 | 5.9% |
| Lower by 0% to 1% | 0 | 0% |
| 0% | 0 | 0% |
| Higher by 0% to 1% | 0 | 0% |
| Higher by 1% to 5% | 2 | 11.8% |
| Higher by 5% to 10% | 0 | 0% |
| Higher by 10% or more | 0 | 0% |
| Unknown | 0 | 0% |
| Total | 17 | 100% |
FECON CORPORATION Won the bidding for the Package XL-LHH1-01: Construction of station entrance roadbed and square of Lao Cai, Phu Tho, Bac Hong, Luong Tai, Hai Duong Nam stations package, which was invited for bidding by the Ban Quản lý dự án Đường sắt through an assign bid as sub-joint of Liên danh Trường Sơn - Vinaconex - Fecon - VRCC - 319.
- Result: Won
18/12/2025 12:10
FECON CORPORATION Won the bidding for the TP1-07: Construction of ground leveling and soft soil treatment at Son Dong Depot package, which was invited for bidding by the BAN QUẢN LÝ ĐƯỜNG SẮT ĐÔ THỊ HÀ NỘI through an assign bid as sub-joint of Liên danh Công ty cổ phần FECON và Tổng Công ty Xây dựng Trường Sơn.
- Result: Won
10/12/2025 20:33
FECON CORPORATION Won the bidding for the Depot background treatment package, which was invited for bidding by the HANOI METROPOLITAN RAILWAY MANAGEMENT BOARD through an Open bidding as an independent entity.
- Result: Won
10/09/2025 17:21
FECON CORPORATION join for the Depot background treatment package, which was invited for bidding by the HANOI METROPOLITAN RAILWAY MANAGEMENT BOARD through an Open bidding as an independent entity.
- Result: Tender opening completed
03/09/2025 09:21
FECON CORPORATION Won the bidding for the Package 04: Construction of housing piles at police officers in CT4, CT5 plot package, which was invited for bidding by the Công ty Đầu tư Xây dựng Số 2 Hà Nội through an assign shorthand as an independent entity.
- Result: Won
29/08/2025 17:58
FECON CORPORATION Won the bidding for the Package No. 60: Building works to keep the water level of To Lich river through the gate to regulate Tay A Lake - Cong - Sewer - Thuy Khue package, which was invited for bidding by the Ban Quản lý dự án đầu tư xây dựng công trình hạ tầng kỹ thuật và nông nghiệp thành phố Hà Nội through an assign shorthand as an independent entity.
- Result: Won
16/08/2025 16:41
FECON CORPORATION Won the bidding for the Package 6: Design, supply and installation of equipment and construction (EPC) package, which was invited for bidding by the VIETNAM AIRLINES ENGINEERING COMPANY LIMITED through an Open bidding as sub-joint of Liên danh Thống Nhất. Eight other contractors also participated.
- Result: Won
14/06/2025 09:34
FECON CORPORATION lost the bidding for the OM4-EPC-HHO-06: Design, procurement, construction, installation, commissioning and acceptance of O Mon IV Thermal Power Plant package, which was invited for bidding by the BRANCH OF VIETNAM NATIONAL INDUSTRY - ENERGY GROUP - POWER PROJECT MANAGEMENT BOARD through an Open bidding as master consortium of CÔNG TY CỔ PHẦN FECON. Seven other contractors also participated.
- Result: Lost
04/06/2025 17:15
FECON CORPORATION join for the Package 6: Design, supply and installation of equipment and construction (EPC) package, which was invited for bidding by the VIETNAM AIRLINES ENGINEERING COMPANY LIMITED through an Open bidding as sub-joint of CÔNG TY CỔ PHẦN FECON. Eight other contractors also participated.
- Result: Tender opening completed
26/05/2025 15:11
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder FECON CORPORATION participated in 33 package, of which 17 package was won, failed 13 packages, 3 packages with no results, 0 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor FECON CORPORATION is related to 26 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor FECON CORPORATION competed with 126 contractors in 20 package, won 6 package, lost 13 package, 1 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor FECON CORPORATION once entered into a partnership with 42 contractors in 20 package, won bid 11 package, lost 9 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor FECON CORPORATION participated in bidding in 10 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor FECON CORPORATION participated in bidding in 13 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 68,759 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects
Add contractor