Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
History of active status changes
| Updated time | Active status | Lý do |
|---|---|---|
|
3:16 PM 04/02/2023 |
Pause |
Temporarily suspended due to overdue fees |
|
8:43 AM 04/04/2023 |
Active |
At the request of QTHT |
|
2:13 AM 04/01/2025 |
Pause |
Temporarily suspended due to overdue fees |
|
8:18 AM 06/27/2025 |
Active |
At the request of QTHT |
Data analysis results of DauThau.info software for contractors FIDIC CONSTRUCTION INVESTMENT CONSULTANCY JOINT STOCK COMPANY are as follows:
You need to Login or Sign up to view all informations.
- Participated in 49 bidding packages, of which 43 were won, 4 were lost, 1 are pending results, and 1 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 64.55% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 99.36% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Hải Phòng (20), Ninh Bình (15), Hà Nội (4), Gia Lai (2), Hưng Yên (2), Phú Thọ (1), Cao Bằng (1), Hà Tĩnh (1), Bắc Ninh (1), Lạng Sơn (1), Undefined (1)
- Provinces before the merger where the contractor has participated in bidding : Hải Dương (20), Hà Nam (13), Hà Nội (4), Bình Định (2), Hưng Yên (2), Ninh Bình (2), Hòa Bình (1), Cao Bằng (1), Hà Tĩnh (1), Bắc Ninh (1), Lạng Sơn (1), Undefined (2)
- Has relationships with 26 Bid Solicitors
- Has competed against 42 contractors in 35 bidding packages, won 29 packages, lost 4 packages, 1 are pending results, and 1 were canceled.
- Has collaborated with 28 contractors in 35 bidding packages, won 30 packages, lost 3 packages, 1 are pending results, and 1 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 31 bidding packages with 12 roles.
- Published contractor selection plan of 3 project with a total of 20 of bidding packages.
- Invitation to bid 6 package (with 6 Tender Notices), conducting Prequalificatin Notice 0 packages.
- Results of 5 packages announced, canceled bids 0 packages (among the packages above).
- There are 0 packages with results without Tender Notice and Prequalification Notice.
This contractor is also the investor. The results of data analysis for investors FIDIC CONSTRUCTION INVESTMENT CONSULTANCY JOINT STOCK COMPANY are as follows:
- As the investor of 1 investment and development projects.
- As the investor of 0 Contractor Selection Plan, including 0 self-published Contractor Selection Plan, 0 Contractor Selection Plan is self-published by the entity. other posted.
- As the investor of 1 bidding package in which the package is self-inviting 1, with 0 the package is owned by the unit. other bidding.
- Building organization name: CÔNG TY CỔ PHẦN TƯ VẤN ĐẦU TƯ XÂY DỰNG FIDIC
- Construction capacity certificate code: 00048747
- Issuing Authority: Sở kế hoạch đầu tư Thành phố Hà Nội
- Field:
⚬ Khảo sát xây dựng: Khảo sát/Địa hình
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Dân dụng
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Hạ tầng kỹ thuật
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Giao thông Cầu, đường bộ
⚬ Quản lý dự án đầu tư xây dựng: Hạ tầng kỹ thuật
⚬ Quản lý dự án đầu tư xây dựng: Giao thông Cầu, đường bộ
⚬ Giám sát thi công xây dựng công trình: Dân dụng
⚬ Giám sát thi công xây dựng công trình: Hạ tầng kỹ thuật
⚬ Giám sát thi công xây dựng công trình: Giao thông Cầu, đường bộ
⚬ Khảo sát xây dựng: Khảo sát địa chất
⚬ Khảo sát xây dựng: Khảo sát XD/Địa chất
⚬ Khảo sát xây dựng: Khảo sát XD/Địa hình
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Công nghiệp Đường dây & TBA
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Hạ tầng kỹ thuật
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Giao thông Cầu, Đường bộ
⚬ Giám sát thi công xây dựng công trình: Công nghiệp Đường dây & TBA
⚬ Lập quy hoạch xây dựng: Lập quy hoạch XD
⚬ Quản lý dự án đầu tư xây dựng: Hạ tầng kỹ thuật
⚬ Thi công xây dựng công trình: Hạ tầng kỹ thuật
⚬ Giám sát thi công xây dựng công trình: Hạ tầng kỹ thuật
⚬ Giám sát thi công xây dựng công trình: Giao thông Cầu, Đường bộ
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 2 | 4.7% |
| Lower by 10% to 20% | 5 | 11.6% |
| Lower by 5% to 10% | 3 | 7% |
| Lower by 1% to 5% | 13 | 30.2% |
| Lower by 0% to 1% | 12 | 27.9% |
| 0% | 5 | 11.6% |
| Higher by 0% to 1% | 1 | 2.3% |
| Higher by 1% to 5% | 1 | 2.3% |
| Higher by 5% to 10% | 0 | 0% |
| Higher by 10% or more | 1 | 2.3% |
| Unknown | 0 | 0% |
| Total | 43 | 100% |
FIDIC CONSTRUCTION INVESTMENT CONSULTANCY JOINT STOCK COMPANY Won the bidding for the Bidding package number
02: Package
EC: Survey,
design
BVTC, Preparatory
Math, pile plug
GPMB, set up
pine model
BIM news; Build
installation
(including Chi
Prevention fee
8.77%) package, which was invited for bidding by the Ban Quản lý dự án đầu tư xây dựng tỉnh Lạng Sơn through an Open bidding as sub-joint of Liên danh Gói thầu số 02: Gói thầu EC mốc 1088/2-1089 cửa khẩu quốc tế Hữu Nghị. Eight other contractors also participated.
- Result: Won
17/10/2025 10:34
FIDIC CONSTRUCTION INVESTMENT CONSULTANCY JOINT STOCK COMPANY join for the Bidding package number
02: Package
EC: Survey,
design
BVTC, Preparatory
Math, pile plug
GPMB, set up
pine model
BIM news; Build
installation
(including Chi
Prevention fee
8.77%) package, which was invited for bidding by the Ban Quản lý dự án đầu tư xây dựng tỉnh Lạng Sơn through an Open bidding as sub-joint of CÔNG TY CỔ PHẦN TƯ VẤN ĐẦU TƯ XÂY DỰNG FIDIC . Eight other contractors also participated.
- Result: Tender opening completed
27/09/2025 09:05
FIDIC CONSTRUCTION INVESTMENT CONSULTANCY JOINT STOCK COMPANY Won the bidding for the Package 3: Consulting on setting up the project information model (BIM) package, which was invited for bidding by the Ban Quản lý dự án đầu tư - hạ tầng xã Sóc Sơn through an assign shorthand as an independent entity.
- Result: Won
27/08/2025 15:34
FIDIC CONSTRUCTION INVESTMENT CONSULTANCY JOINT STOCK COMPANY Won the bidding for the Package No. 5: Survey supervision consultancy package, which was invited for bidding by the Ủy ban nhân dân xã Kim Anh through an assign shorthand as an independent entity.
- Result: Won
21/08/2025 14:52
FIDIC CONSTRUCTION INVESTMENT CONSULTANCY JOINT STOCK COMPANY Won the bidding for the Package 01: Survey consultancy, preparation of feasibility study report and site clearance deposit package, which was invited for bidding by the Ban Quản lý dự án đầu tư xây dựng Tây Hải Phòng through an assign shorthand as an independent entity.
- Result: Won
15/07/2025 14:21
FIDIC CONSTRUCTION INVESTMENT CONSULTANCY JOINT STOCK COMPANY lost the bidding for the Package No. 6: Survey consulting, construction drawing design - project estimates package, which was invited for bidding by the Ban quản lý dự án đầu tư xây dựng quận Long Biên through an Open bidding as sub-joint of CÔNG TY CỔ PHẦN TƯ VẤN ĐẦU TƯ XÂY DỰNG FIDIC . Four other contractors also participated.
- Result: Lost
08/04/2025 09:48
FIDIC CONSTRUCTION INVESTMENT CONSULTANCY JOINT STOCK COMPANY lost the bidding for the Package No. 08: Survey consulting, construction design implementation after basic design (TKBVTC), estimates and designs, site clearance pile installation package, which was invited for bidding by the Ban Quản lý dự án đầu tư xây dựng công trình giao thông tỉnh Ninh Bình through an Open bidding as sub-joint of CÔNG TY CỔ PHẦN TƯ VẤN ĐẦU TƯ XÂY DỰNG FIDIC . Three other contractors also participated.
- Result: Lost
06/11/2024 17:58
FIDIC CONSTRUCTION INVESTMENT CONSULTANCY JOINT STOCK COMPANY join for the Package No. 6: Survey consulting, construction drawing design - project estimates package, which was invited for bidding by the Ban quản lý dự án đầu tư xây dựng quận Long Biên through an Open bidding as sub-joint of CÔNG TY CỔ PHẦN TƯ VẤN ĐẦU TƯ XÂY DỰNG FIDIC . Four other contractors also participated.
- Result: Tender opening completed
28/10/2024 10:08
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder FIDIC CONSTRUCTION INVESTMENT CONSULTANCY JOINT STOCK COMPANY participated in 49 package, of which 43 package was won, failed 4 packages, 1 packages with no results, 1 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor FIDIC CONSTRUCTION INVESTMENT CONSULTANCY JOINT STOCK COMPANY is related to 26 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor FIDIC CONSTRUCTION INVESTMENT CONSULTANCY JOINT STOCK COMPANY competed with 42 contractors in 35 package, won 29 package, lost 4 package, 1 bidding package has no results, 1 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor FIDIC CONSTRUCTION INVESTMENT CONSULTANCY JOINT STOCK COMPANY once entered into a partnership with 28 contractors in 35 package, won bid 30 package, lost 3 package, 1 bidding package has no results, 1 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor FIDIC CONSTRUCTION INVESTMENT CONSULTANCY JOINT STOCK COMPANY participated in bidding in 10 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor FIDIC CONSTRUCTION INVESTMENT CONSULTANCY JOINT STOCK COMPANY participated in bidding in 11 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 68,759 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects
Add contractor