Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for contractors HA LINH CPI JOINT STOCK COMPANY are as follows:
You need to Login or Sign up to view all informations.
- Participated in 17 bidding packages, of which 11 were won, 4 were lost, 2 are pending results, and 0 were canceled.
- Total bid-winning value: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Lowest bid rate when participating: 97.77% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 95.11% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces participated in the bidding: Hà Nội (5), Quảng Ninh (3), Hòa Bình (2), Phú Thọ (2), Sơn La (1), Hà Giang (1), Undefined (3)
- Has relationships with 16 Bid Solicitors
- Has competed against 26 contractors in 13 bidding packages, won 6 packages, lost 3 packages, 4 are pending results, and 0 were canceled.
- Has collaborated with 14 contractors in 9 bidding packages, won 8 packages, lost 0 packages, 1 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Building organization name: CÔNG TY CỔ PHẦN SẢN XUẤT THƯƠNG MẠI VÀ XÂY DỰNG HÀ LINH
- Construction capacity certificate code: 00041731
- Issuing Authority: Sở kế hoạch đầu tư Thành phố Hà Nội
- Field:
⚬ Thi công xây dựng công trình: Dân dụng
⚬ Thi công xây dựng công trình: Giao thông Cầu, đường bộ
⚬ Giám sát thi công xây dựng công trình: Dân dụng
⚬ Giám sát thi công xây dựng công trình: Công nghiệp nhẹ
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Competitiveness | ??? |
Enterprise scale | ??? |
Violation history | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
---|---|---|
Lower by 20% or more | 0 | 0% |
Lower by 10% to 20% | 2 | 18.2% |
Lower by 5% to 10% | 2 | 18.2% |
Lower by 1% to 5% | 4 | 36.4% |
Lower by 0% to 1% | 1 | 9.1% |
0% | 2 | 18.2% |
Higher by 0% to 1% | 0 | 0% |
Higher by 1% to 5% | 0 | 0% |
Higher by 5% to 10% | 0 | 0% |
Higher by 10% or more | 0 | 0% |
Unknown | 0 | 0% |
Total | 11 | 100% |
HA LINH CPI JOINT STOCK COMPANY join for the construction + procurement and installation of equipment package, which was invited for bidding by the CÔNG TY TRÁCH NHIỆM HỮU HẠN MỘT THÀNH VIÊN D&A through an Open bidding as sub-joint of CÔNG TY CỔ PHẦN CPI HÀ LINH. Seven other contractors also participated.
21/10/2024 08:02
HA LINH CPI JOINT STOCK COMPANY Won the bidding for the Package 12: Construction, supply and installation of construction equipment package, which was invited for bidding by the Bộ Chỉ huy quân sự tỉnh Quảng Ninh through an Open bidding as sub-joint of Công ty cổ phần đô thị Bình Minh Việt.
- Result: Won
02/10/2024 16:29
HA LINH CPI JOINT STOCK COMPANY lost the bidding for the Renovating the fire prevention and fighting system package, which was invited for bidding by the Lam Thao Fertilizers and Chemicals joint stock Company through an Competitive Offer as an independent entity. Three other contractors also participated.
- Result: Lost
02/10/2024 11:19
HA LINH CPI JOINT STOCK COMPANY Won the bidding for the Package No. 08: Construction and installation of works package, which was invited for bidding by the Ban Quản lý dự án đầu tư xây dựng thành phố Hạ Long through an Open bidding as sub-joint of CÔNG TY CỔ PHẦN ĐẦU TƯ XÂY DỰNG UÔNG BÍ. Two other contractors also participated.
- Result: Won
31/07/2024 17:29
HA LINH CPI JOINT STOCK COMPANY join for the Tender package No 04: Construction work package, which was invited for bidding by the Ban quản lý dự án đầu tư xây dựng huyện Hải Hà through an Open bidding as sub-joint of CÔNG TY CỔ PHẦN CPI HÀ LINH. Five other contractors also participated.
29/07/2024 07:49
HA LINH CPI JOINT STOCK COMPANY lost the bidding for the VB-TB3 Supply and installation of fire protection system package, which was invited for bidding by the Ban Quản lý các dự án khí tượng thủy văn through an Open bidding as an independent entity. Two other contractors also participated.
- Result: Lost
08/05/2024 15:51
HA LINH CPI JOINT STOCK COMPANY Won the bidding for the Package No. 01: Procurement of 2-door iron wardrobe for daily use
for officials and employees of buildings S3 and S4 package, which was invited for bidding by the Viet Nam Department of Peacekeeping Operations through an assign shorthand as an independent entity.
- Result: Won
20/11/2023 18:38
HA LINH CPI JOINT STOCK COMPANY Won the bidding for the Repair and replace fire prevention and fighting equipment at the District Convention Center and the Headquarters of the District People's Council and People's Committee package, which was invited for bidding by the Văn phòng HĐND UBND huyện Sốp Cộp through an Shortened competitive offer as an independent entity.
- Result: Won
18/09/2023 10:25
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder HA LINH CPI JOINT STOCK COMPANY participated in 17 package, of which 11 package was won, failed 4 packages, 2 packages with no results, 0 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor HA LINH CPI JOINT STOCK COMPANY is related to 16 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor HA LINH CPI JOINT STOCK COMPANY competed with 26 contractors in 13 package, won 6 package, lost 3 package, 4 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor HA LINH CPI JOINT STOCK COMPANY once entered into a partnership with 14 contractors in 9 package, won bid 8 package, lost 0 package, 1 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor HA LINH CPI JOINT STOCK COMPANY participated in bidding in 6 provinces/cities, 0 bidding packages were carried out nationwide, 0 bidding packages were carried out outside of Vietnam. The data table has been partially hidden, to see the full information please Login or Register
There are 63,710 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code