Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
| Company name | CÔNG TY CỔ PHẦN KIỂM ĐỊNH VÀ KỸ THUẬT XÂY DỰNG HÀ NỘI |
|
| International name | HA NOI CONSTRUCTION TECHNIQUE AND CONTROL JOINT STOCK COMPANY | |
| Views | 2482 | |
| Business Tax ID | 0101539091 | |
| Tax ID issue country | Việt Nam | |
| Business Registration ID | vn0101539091 | |
| Trading address | Số 73 ngõ 64 phố Nguyễn Lương Bằng, phường Ô Chợ Dừa, quận Đống Đa, Thành phố Hà Nội, Việt Nam | |
| Head office address after merger | Số 36 Nguyên Hồng, Phường Đống Đa, Hà Nội | |
| Business | Consulting | |
| Form of Business | Joint Stock Company | |
| Company Establishment Date | 29/09/2004 | |
| The number of workers | 50 | |
| Date of registration on the Public procurement system | 01/09/2016 | |
| Payment Status |
Paid
According to Circular 06/2021, from March 3, 2022, investors and contractors will be stopped from trading if they do not pay fees for posting information, selecting contractors, investors on the national bidding network system. Please verify your account on DauThau.Net so that the system automatically sends mail remind you when you forget to renew. |
|
| Legal representative | TRẦN HỒNG HẢI | |
| Position | Director | |
| Attached files |
Adjust business operations Organizational chart Business registration certificate
|
|
| Enterprise scale | Small business | |
Business industry of CÔNG TY CỔ PHẦN KIỂM ĐỊNH VÀ KỸ THUẬT XÂY DỰNG HÀ NỘI |
||
|
|
||
History of active status changes
| Updated time | Active status | Lý do |
|---|---|---|
|
12:01 AM 02/16/2023 |
Pause |
Temporarily suspended due to overdue fees |
|
9:49 AM 02/17/2023 |
Active |
At the request of QTHT |
|
12:39 AM 11/07/2023 |
Pause |
Temporarily suspended due to overdue fees |
|
8:13 AM 11/07/2023 |
Active |
At the request of QTHT |
Data analysis results of DauThau.info software for contractors HA NOI CONSTRUCTION TECHNIQUE AND CONTROL JOINT STOCK COMPANY are as follows:
You need to Login or Sign up to view all informations.
- Participated in 102 bidding packages, of which 55 were won, 44 were lost, 3 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 26.37% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 73.28% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Hà Nội (51), Hải Phòng (7), Ninh Bình (6), Bắc Ninh (4), Đà Nẵng (3), Nghệ An (3), Thái Nguyên (3), Đồng Nai (2), Phú Thọ (1), Quảng Ninh (1), Tuyên Quang (1), Cần Thơ (1), Cao Bằng (1), Lâm Đồng (1), Tây Ninh (1), Cà Mau (1), Khánh Hòa (1), Lào Cai (1), Hưng Yên (1), Undefined (13)
- Provinces before the merger where the contractor has participated in bidding : Hà Nội (51), Hải Phòng (4), Bắc Ninh (3), Đà Nẵng (3), Nghệ An (3), Hải Dương (3), Thái Nguyên (3), Hà Nam (2), Đồng Nai (2), Vĩnh Phúc (1), Quảng Ninh (1), Tuyên Quang (1), Cần Thơ (1), Bắc Giang (1), Cao Bằng (1), Đắk Nông (1), Nam Định (1), Long An (1), Cà Mau (1), Khánh Hòa (1), Lào Cai (1), Hưng Yên (1), Ninh Bình (1), Undefined (15)
- Has relationships with 85 Bid Solicitors
- Has competed against 61 contractors in 81 bidding packages, won 34 packages, lost 43 packages, 4 are pending results, and 0 were canceled.
- Has collaborated with 6 contractors in 11 bidding packages, won 5 packages, lost 6 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 0 bidding packages with 0 roles.
- Lab name: Construction specialized laboratory
- Laboratory code: LAS-XD 452
- Certifications:
⚬ Certificate 140/GCN-BXD
⚬ Certificate 458/GCN-BXD.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 33 | 60% |
| Lower by 10% to 20% | 7 | 12.7% |
| Lower by 5% to 10% | 8 | 14.5% |
| Lower by 1% to 5% | 3 | 5.5% |
| Lower by 0% to 1% | 1 | 1.8% |
| 0% | 1 | 1.8% |
| Higher by 0% to 1% | 0 | 0% |
| Higher by 1% to 5% | 0 | 0% |
| Higher by 5% to 10% | 0 | 0% |
| Higher by 10% or more | 2 | 3.6% |
| Unknown | 0 | 0% |
| Total | 55 | 100% |
HA NOI CONSTRUCTION TECHNIQUE AND CONTROL JOINT STOCK COMPANY lost the bidding for the Package No. 23: Pile experimental consulting package, which was invited for bidding by the Hanoi Project Management Board of Civil Construction Investment through an Open bidding as an independent entity. Three other contractors also participated.
- Result: Lost
01/12/2025 09:57
HA NOI CONSTRUCTION TECHNIQUE AND CONTROL JOINT STOCK COMPANY join for the Package No. 23: Pile experimental consulting package, which was invited for bidding by the Hanoi Project Management Board of Civil Construction Investment through an Open bidding as an independent entity. Three other contractors also participated.
- Result: Tender opening completed
11/11/2025 09:15
HA NOI CONSTRUCTION TECHNIQUE AND CONTROL JOINT STOCK COMPANY Won the bidding for the Package No. 22: Pile testing package, which was invited for bidding by the Ninh Binh development investment fund through an assign shorthand as sub-joint of Liên danh nhà thầu trung tâm giám định chất lượng xây dựng Ninh Bình và Công ty cổ phần kiểm định và kỹ thuật xây dựng Hà Nội.
- Result: Won
07/11/2025 17:40
HA NOI CONSTRUCTION TECHNIQUE AND CONTROL JOINT STOCK COMPANY lost the bidding for the Package 15 (Consulting): Pile experiment package, which was invited for bidding by the JOINT STOCK COMMERCIAL BANK FOR INVESTMENT AND DEVELOPMENT OF VIETNAM through an Open bidding as an independent entity. Four other contractors also participated.
- Result: Lost
24/10/2025 15:09
HA NOI CONSTRUCTION TECHNIQUE AND CONTROL JOINT STOCK COMPANY Won the bidding for the Package 19/TV: Specialized experiment package, which was invited for bidding by the Ban Quản lý dự án đầu tư xây dựng công trình giao thông Thành phố Hà Nội through an Open bidding as sub-joint of LIÊN DANH HCTC - GEI. Three other contractors also participated.
- Result: Won
15/10/2025 14:03
HA NOI CONSTRUCTION TECHNIQUE AND CONTROL JOINT STOCK COMPANY lost the bidding for the Package 11: Consulting on static compression pile for package 07 package, which was invited for bidding by the Ban Quản lý Khu Đại học Nam Cao và Khu Công nghệ cao tỉnh Ninh Bình through an Open bidding as an independent entity. Three other contractors also participated.
- Result: Lost
16/09/2025 17:26
HA NOI CONSTRUCTION TECHNIQUE AND CONTROL JOINT STOCK COMPANY Won the bidding for the Package 15: Experimental experimental consulting package, which was invited for bidding by the Công ty Đầu tư Xây dựng Số 2 Hà Nội through an assign shorthand as an independent entity.
- Result: Won
05/09/2025 11:15
HA NOI CONSTRUCTION TECHNIQUE AND CONTROL JOINT STOCK COMPANY join for the Package 15 (Consulting): Pile experiment package, which was invited for bidding by the JOINT STOCK COMMERCIAL BANK FOR INVESTMENT AND DEVELOPMENT OF VIETNAM through an Open bidding as an independent entity. Four other contractors also participated.
- Result: Tender opening completed
03/09/2025 10:36
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder HA NOI CONSTRUCTION TECHNIQUE AND CONTROL JOINT STOCK COMPANY participated in 102 package, of which 55 package was won, failed 44 packages, 3 packages with no results, 0 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor HA NOI CONSTRUCTION TECHNIQUE AND CONTROL JOINT STOCK COMPANY is related to 85 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor HA NOI CONSTRUCTION TECHNIQUE AND CONTROL JOINT STOCK COMPANY competed with 61 contractors in 81 package, won 34 package, lost 43 package, 4 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor HA NOI CONSTRUCTION TECHNIQUE AND CONTROL JOINT STOCK COMPANY once entered into a partnership with 6 contractors in 11 package, won bid 5 package, lost 6 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor HA NOI CONSTRUCTION TECHNIQUE AND CONTROL JOINT STOCK COMPANY participated in bidding in 19 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor HA NOI CONSTRUCTION TECHNIQUE AND CONTROL JOINT STOCK COMPANY participated in bidding in 23 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 68,759 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects
Add contractor