Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
History of active status changes
| Updated time | Active status | Lý do |
|---|---|---|
|
12:00 AM 12/23/2022 |
Pause |
Temporarily suspended due to overdue fees |
|
10:04 AM 12/23/2022 |
Active |
At the request of QTHT |
|
12:10 AM 10/01/2023 |
Pause |
Temporarily suspended due to overdue fees |
|
8:40 AM 10/02/2023 |
Active |
At the request of QTHT |
|
2:56 PM 10/17/2023 |
Pause |
Temporarily suspended due to overdue fees |
|
5:15 PM 10/17/2023 |
Active |
At the request of QTHT |
|
12:03 AM 11/03/2023 |
Pause |
Temporarily suspended due to overdue fees |
|
11:09 AM 11/06/2023 |
Active |
At the request of QTHT |
|
11:31 PM 03/31/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
8:31 AM 04/01/2024 |
Active |
At the request of QTHT |
|
12:06 AM 09/07/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
8:43 AM 09/09/2024 |
Active |
At the request of QTHT |
|
12:35 AM 12/24/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
8:15 AM 12/24/2024 |
Active |
At the request of QTHT |
|
12:05 AM 12/27/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
7:51 AM 12/27/2024 |
Active |
At the request of QTHT |
|
12:05 AM 12/29/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
8:57 AM 01/03/2025 |
Active |
At the request of QTHT |
Data analysis results of DauThau.info software for contractors HTI INVESTMENT AND TECHNOLOGIES JOINT STOCK COMPANY are as follows:
You need to Login or Sign up to view all informations.
- Participated in 182 bidding packages, of which 146 were won, 29 were lost, 5 are pending results, and 2 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 17.14% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 88.26% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : TP.Hồ Chí Minh (21), Hà Nội (20), Ninh Bình (11), Đồng Tháp (8), Tuyên Quang (7), Lâm Đồng (7), Vĩnh Long (7), Đắk Lắk (7), An Giang (6), Phú Thọ (5), Cần Thơ (5), Nghệ An (4), Quảng Ngãi (4), Huế (3), Hải Phòng (3), Bắc Ninh (3), Lai Châu (3), Thái Nguyên (3), Đồng Nai (2), Đà Nẵng (2), Tây Ninh (2), Khánh Hòa (2), Thanh Hoá (1), Lào Cai (1), Gia Lai (1), Nationwide (1), Hưng Yên (1), Undefined (42)
- Provinces before the merger where the contractor has participated in bidding : Hà Nội (20), TP.Hồ Chí Minh (12), Vĩnh Long (6), Đắk Lắk (6), Bình Dương (5), Bình Thuận (5), Tiền Giang (4), Vĩnh Phúc (4), Hà Giang (4), Ninh Bình (4), Đồng Tháp (4), Nghệ An (4), Hậu Giang (4), Nam Định (4), An Giang (4), Huế (3), Tuyên Quang (3), Bắc Ninh (3), Lai Châu (3), Thái Nguyên (3), Kiên Giang (2), Hải Phòng (2), Hà Nam (2), Long An (2), Lâm Đồng (2), Khánh Hòa (2), Bà Rịa - Vũng Tàu (2), Thanh Hoá (1), Đồng Nai (1), Đà Nẵng (1), Hòa Bình (1), Trà Vinh (1), Cần Thơ (1), Hải Dương (1), Yên Bái (1), Quảng Ngãi (1), Bình Định (1), Nationwide (1), Bình Phước (1), Hưng Yên (1), Undefined (53)
- Has relationships with 105 Bid Solicitors
- Has competed against 144 contractors in 59 bidding packages, won 25 packages, lost 28 packages, 5 are pending results, and 1 were canceled.
- Has collaborated with 18 contractors in 18 bidding packages, won 12 packages, lost 5 packages, 0 are pending results, and 1 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 0 bidding packages with 0 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 6 | 4.1% |
| Lower by 10% to 20% | 0 | 0% |
| Lower by 5% to 10% | 6 | 4.1% |
| Lower by 1% to 5% | 28 | 19.2% |
| Lower by 0% to 1% | 91 | 62.3% |
| 0% | 13 | 8.9% |
| Higher by 0% to 1% | 0 | 0% |
| Higher by 1% to 5% | 0 | 0% |
| Higher by 5% to 10% | 0 | 0% |
| Higher by 10% or more | 2 | 1.4% |
| Unknown | 0 | 0% |
| Total | 146 | 100% |
HTI INVESTMENT AND TECHNOLOGIES JOINT STOCK COMPANY join for the Adding servers at the backup data center package, which was invited for bidding by the through an Open bidding as an independent entity.
14/01/2026 11:23
HTI INVESTMENT AND TECHNOLOGIES JOINT STOCK COMPANY join for the Replace the primary Data Center server package, which was invited for bidding by the through an Open bidding as an independent entity.
12/01/2026 17:55
HTI INVESTMENT AND TECHNOLOGIES JOINT STOCK COMPANY Won the bidding for the Package No. 9: Supply 01 mouse cage changing cabinet with ventilation system and airflow balancing technology with pre-filter package, which was invited for bidding by the Viện Kiểm nghiệm thuốc thành phố Hồ Chí Minh through an Open bidding as an independent entity. One other contractors also participated.
- Result: Won
01/01/2026 18:03
HTI INVESTMENT AND TECHNOLOGIES JOINT STOCK COMPANY Won the bidding for the Package No. 3: Supply of 01 ICP-MS Inductive Plasma Mass Spectrometry System package, which was invited for bidding by the Viện Kiểm nghiệm thuốc thành phố Hồ Chí Minh through an Open bidding as an independent entity. One other contractors also participated.
- Result: Won
29/12/2025 06:44
HTI INVESTMENT AND TECHNOLOGIES JOINT STOCK COMPANY Won the bidding for the Procurement of the first fixed assets in 2025 of the Quality Control package, which was invited for bidding by the BINH SON REFINING AND PETROCHEMICAL JOINT STOCK COMPANY through an Open bidding as an independent entity. Three other contractors also participated.
- Result: Won
25/12/2025 15:57
HTI INVESTMENT AND TECHNOLOGIES JOINT STOCK COMPANY Won the bidding for the Bidding package No. 01: Procurement of equipment to serve the work of ensuring traffic order and safety, phase 2 of 2025 package, which was invited for bidding by the Công an tỉnh Nghệ An through an Open bidding as an independent entity.
- Result: Won
18/12/2025 15:57
HTI INVESTMENT AND TECHNOLOGIES JOINT STOCK COMPANY Won the bidding for the Procurement of equipment and software to upgrade and invest in information technology infrastructure for agencies under the People's Committee of Quang Ngai province package, which was invited for bidding by the Công an tỉnh Quảng Ngãi through an Open bidding as an independent entity.
- Result: Won
17/12/2025 14:11
HTI INVESTMENT AND TECHNOLOGIES JOINT STOCK COMPANY Won the bidding for the Procurement of software for digital and electronic inspection work package, which was invited for bidding by the CÔNG AN TỈNH ĐẮK LẮK through an assign shorthand as an independent entity.
- Result: Won
15/12/2025 16:26
HTI INVESTMENT AND TECHNOLOGIES JOINT STOCK COMPANY join for the Bidding package No. 01: Procurement of equipment to serve the work of ensuring traffic order and safety, phase 2 of 2025 package, which was invited for bidding by the through an Open bidding as an independent entity.
- Result: Tender opening completed
15/12/2025 09:05
HTI INVESTMENT AND TECHNOLOGIES JOINT STOCK COMPANY join for the Procurement of equipment and software to upgrade and invest in information technology infrastructure for agencies under the People's Committee of Quang Ngai province package, which was invited for bidding by the through an Open bidding as an independent entity.
- Result: Tender opening completed
13/12/2025 08:30
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder HTI INVESTMENT AND TECHNOLOGIES JOINT STOCK COMPANY participated in 182 package, of which 146 package was won, failed 29 packages, 5 packages with no results, 2 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor HTI INVESTMENT AND TECHNOLOGIES JOINT STOCK COMPANY is related to 105 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor HTI INVESTMENT AND TECHNOLOGIES JOINT STOCK COMPANY competed with 144 contractors in 59 package, won 25 package, lost 28 package, 5 bidding package has no results, 1 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor HTI INVESTMENT AND TECHNOLOGIES JOINT STOCK COMPANY once entered into a partnership with 18 contractors in 18 package, won bid 12 package, lost 5 package, 0 bidding package has no results, 1 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor HTI INVESTMENT AND TECHNOLOGIES JOINT STOCK COMPANY participated in bidding in 26 provinces/cities, 1 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor HTI INVESTMENT AND TECHNOLOGIES JOINT STOCK COMPANY participated in bidding in 39 provinces/cities, 1 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 68,759 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects
Add contractor