- Participated in 31 bidding packages, of which 9 were won, 18 were lost, 3 are pending results, and 1 were canceled.
- Total bid-winning value: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Lowest bid rate when participating: 45.3% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 78.49% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces participated in the bidding: Quảng Ninh (16), Lạng Sơn (5), Gia Lai (2), Hải Dương (1), Hà Nội (1), Bình Thuận (1), Thanh Hoá (1), Vĩnh Phúc (1), Lâm Đồng (1), Bắc Giang (1), Đắk Nông (1)
- Has relationships with 17 Bid Solicitors
- Has competed against 65 contractors in 31 bidding packages, won 9 packages, lost 18 packages, 3 are pending results, and 1 were canceled.
- Has collaborated with 5 contractors in 7 bidding packages, won 4 packages, lost 3 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Competitiveness | ??? |
Enterprise scale | ??? |
Violation history | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
---|---|---|
Lower by 20% or more | 5 | 55.6% |
Lower by 10% to 20% | 2 | 22.2% |
Lower by 5% to 10% | 0 | 0% |
Lower by 1% to 5% | 0 | 0% |
Lower by 0% to 1% | 2 | 22.2% |
0% | 0 | 0% |
Higher by 0% to 1% | 0 | 0% |
Higher by 1% to 5% | 0 | 0% |
Higher by 5% to 10% | 0 | 0% |
Higher by 10% or more | 0 | 0% |
Unknown | 0 | 0% |
Total | 9 | 100% |
HUNG PHAT ENGINEERING AND TRADING COMPANY LIMITED join for the Tender package No 10: Providing monitoring control system for Unit H2 (LCU2), monitoring control system for 22kV distribution equipment and auxiliary equipment (LCU3) and accompanying technical services for the Hydropower Plant Ka Nak Palace package, which was invited for bidding by the AN KHE - KA NAK HYDRO POWER COMPANY - BRANCH OF POWER GENERATION CORPORATION 2 through an Open bidding as master consortium of CÔNG TY TNHH THƯƠNG MẠI VÀ KỸ THUẬT HƯNG PHÁT. Five other contractors also participated.
12/07/2024 08:32
HUNG PHAT ENGINEERING AND TRADING COMPANY LIMITED Won the bidding for the Repair and maintenance of quantitative conveyor belt A-04YH1S013a/b/c package, which was invited for bidding by the VINACOMIN - DAK NONG ALUMINIUM COMPANY through an Open bidding as an independent entity. Two other contractors also participated.
- Result: Won
10/05/2024 15:28
HUNG PHAT ENGINEERING AND TRADING COMPANY LIMITED lost the bidding for the Package No. 5: Supply, installation, calibration and commissioning of 2A/2B . Conveyor Coal Scales package, which was invited for bidding by the SON DONG THERMAL POWER COMPANY-BRANCH OF VINACOMIN-POWER HOLDING CORPORATION through an Competitive Offer as an independent entity. Six other contractors also participated.
- Result: Lost
19/01/2024 16:12
HUNG PHAT ENGINEERING AND TRADING COMPANY LIMITED lost the bidding for the SXKD2023-PTV19: Repair of raw coal weighing systems 1, 2, 3, 4 - 300MW unit package, which was invited for bidding by the UONG BI THERMAL POWER COMPANY through an Open bidding as master consortium of CÔNG TY TNHH THƯƠNG MẠI VÀ KỸ THUẬT HƯNG PHÁT. Four other contractors also participated.
- Result: Lost
26/10/2023 09:54
HUNG PHAT ENGINEERING AND TRADING COMPANY LIMITED lost the bidding for the Package 05: Supplying DCS System and accompanying technical services for Ka Nak . Power Plant package, which was invited for bidding by the AN KHE - KA NAK HYDRO POWER COMPANY - BRANCH OF POWER GENERATION CORPORATION 2 through an Open bidding as master consortium of CÔNG TY TNHH THƯƠNG MẠI VÀ KỸ THUẬT HƯNG PHÁT. Three other contractors also participated.
- Result: Lost
09/10/2023 15:23
HUNG PHAT ENGINEERING AND TRADING COMPANY LIMITED Won the bidding for the Repairing the control system of weighing ore conveyor to crusher A-04YH1S013abc area A04 of Raw Material Workshop package, which was invited for bidding by the CÔNG TY TRÁCH NHIỆM HỮU HẠN MỘT THÀNH VIÊN NHÔM LÂM ĐỒNG - TKV through an Competitive Offer as an independent entity. One other contractors also participated.
- Result: Won
07/08/2023 16:34
HUNG PHAT ENGINEERING AND TRADING COMPANY LIMITED lost the bidding for the SXKD2023-HH30: Supplying materials and services related to repairing conveyor scales package, which was invited for bidding by the NGHI SƠN THERMAL POWER COMPANY through an Open bidding as master consortium of CÔNG TY TNHH THƯƠNG MẠI VÀ KỸ THUẬT HƯNG PHÁT. Two other contractors also participated.
- Result: Lost
29/06/2023 10:50
HUNG PHAT ENGINEERING AND TRADING COMPANY LIMITED lost the bidding for the Supply and installation of vacuum cleaner package 70,000m3/h package, which was invited for bidding by the CÔNG TY CỔ PHẦN VIGLACERA THĂNG LONG through an Competitive Offer as an independent entity. Two other contractors also participated.
- Result: Lost
24/06/2023 21:24
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder HUNG PHAT ENGINEERING AND TRADING COMPANY LIMITED participated in 31 package, of which 9 package was won, failed 18 packages, 3 packages with no results, 1 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor HUNG PHAT ENGINEERING AND TRADING COMPANY LIMITED is related to 17 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor HUNG PHAT ENGINEERING AND TRADING COMPANY LIMITED competed with 65 contractors in 31 package, won 9 package, lost 18 package, 3 bidding package has no results, 1 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor HUNG PHAT ENGINEERING AND TRADING COMPANY LIMITED once entered into a partnership with 5 contractors in 7 package, won bid 4 package, lost 3 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor HUNG PHAT ENGINEERING AND TRADING COMPANY LIMITED participated in bidding in 11 provinces/cities, 0 bidding packages were carried out nationwide, 0 bidding packages were carried out outside of Vietnam. The data table has been partially hidden, to see the full information please Login or Register
There are 63,712 contractor who have not participated in any bidding packages