History of active status changes
| Updated time | Active status | Lý do |
|---|---|---|
|
12:05 AM 04/28/2026 |
Pause |
Temporarily suspended due to overdue fees |
|
10:32 AM 04/28/2026 |
Active |
At the request of QTHT |
Data analysis results of DauThau.info software for contractors 3T INDUSTRY EQUIPMENT JOINT STOCK COMPANY are as follows:
You need to Login or Sign up to view all informations.
- Participated in 141 bidding packages, of which 15 were won, 106 were lost, 15 are pending results, and 5 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 30.03% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 82.36% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Hải Phòng (30), Hà Nội (24), Vĩnh Long (21), Thanh Hoá (15), Quảng Ninh (13), TP.Hồ Chí Minh (12), Lâm Đồng (5), Khánh Hòa (4), Ninh Bình (3), Hưng Yên (3), Cần Thơ (3), Lạng Sơn (2), Hà Tĩnh (2), Đồng Nai (2), Nghệ An (1), Đà Nẵng (1), Undefined (4)
- Provinces before the merger where the contractor has participated in bidding : Hà Nội (24), Thanh Hoá (15), Trà Vinh (15), Quảng Ninh (13), Hải Dương (9), Khánh Hòa (4), TP.Hồ Chí Minh (3), Thái Bình (3), Hậu Giang (3), Hải Phòng (2), Lạng Sơn (2), Hà Tĩnh (2), Ninh Bình (2), Bà Rịa - Vũng Tàu (2), Lâm Đồng (1), Nam Định (1), Nghệ An (1), Đà Nẵng (1), Bình Thuận (1), Undefined (42)
- Has relationships with 36 Bid Solicitors
- Has relationships with 19 Bid Investors
- Has competed against 218 contractors in 135 bidding packages, won 12 packages, lost 105 packages, 14 are pending results, and 4 were canceled.
- Has collaborated with 9 contractors in 13 bidding packages, won 2 packages, lost 10 packages, 0 are pending results, and 1 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 0 bidding packages with 0 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 8 | 53.3% |
| Lower by 10% to 20% | 3 | 20% |
| Lower by 5% to 10% | 2 | 13.3% |
| Lower by 1% to 5% | 1 | 6.7% |
| Lower by 0% to 1% | 1 | 6.7% |
| 0% | 0 | 0% |
| Higher by 0% to 1% | 0 | 0% |
| Higher by 1% to 5% | 0 | 0% |
| Higher by 5% to 10% | 0 | 0% |
| Higher by 10% or more | 0 | 0% |
| Unknown | 0 | 0% |
| Total | 15 | 100% |
3T INDUSTRY EQUIPMENT JOINT STOCK COMPANY join for the HH-2026-23: Providing all kinds of materials, equipment, turbine parts and auxiliary equipment for minor repairs of block 6, line 2 package, which was invited for bidding by the PhaLai Thermal Power Joint Stock Company through an Open bidding as an independent entity. Three other contractors also participated.
20/08/2026 10:02
3T INDUSTRY EQUIPMENT JOINT STOCK COMPANY lost the bidding for the No. 11MSHH-SCL+SCTX-2026: Supplying bearings and bearings of all kinds package, which was invited for bidding by the QUANG NINH THERMAL POWER JOINT STOCK COMPANY through an Open bidding as an independent entity. Two other contractors also participated.
- Result: Lost
14/08/2026 15:51
3T INDUSTRY EQUIPMENT JOINT STOCK COMPANY join for the Purchasing 06 properties in 2026 package, which was invited for bidding by the CÔNG TY THỦY ĐIỆN TRỊ AN - CHI NHÁNH TẬP ĐOÀN ĐIỆN LỰC VIỆT NAM through an Open bidding as an independent entity. Six other contractors also participated.
05/08/2026 13:30
3T INDUSTRY EQUIPMENT JOINT STOCK COMPANY join for the SCTX-2026-19 Providing all kinds of materials and equipment for mechanical parts of Line 2 package, which was invited for bidding by the PhaLai Thermal Power Joint Stock Company through an Open bidding as an independent entity. Two other contractors also participated.
10/07/2026 10:01
3T INDUSTRY EQUIPMENT JOINT STOCK COMPANY lost the bidding for the 01HH-TSCD-2026: Procurement of equipment for repair, maintenance and operation of Dong Nai 3 and Dong Nai 4 hydropower plants in 2026 package, which was invited for bidding by the CHI NHÁNH TỔNG CÔNG TY PHÁT ĐIỆN 1 - CÔNG TY THỦY ĐIỆN ĐỒNG NAI through an Open bidding as sub-joint of CÔNG TY CỔ PHẦN THIẾT BỊ 3T CÔNG NGHIỆP. Three other contractors also participated.
- Result: Lost
09/07/2026 17:07
3T INDUSTRY EQUIPMENT JOINT STOCK COMPANY lost the bidding for the Safety tools and equipment (including: insulated gloves, insulated poles, measuring meters) (DVN-VT-724/26-CD -TTH) package, which was invited for bidding by the Vietsovpetro Joint Venture through an Open bidding as an independent entity. Four other contractors also participated.
- Result: Lost
02/07/2026 08:26
3T INDUSTRY EQUIPMENT JOINT STOCK COMPANY lost the bidding for the 10HH-SXKD.UB-2026: Supply of bearings package, which was invited for bidding by the UONG BI THERMAL POWER COMPANY through an Open bidding as an independent entity. Three other contractors also participated.
- Result: Lost
24/06/2026 13:56
3T INDUSTRY EQUIPMENT JOINT STOCK COMPANY lost the bidding for the Package No. 03HH-SXKD.NS-2026: Supply of bearings and oil seals package, which was invited for bidding by the NGHI SƠN THERMAL POWER COMPANY through an Open bidding as an independent entity. Ten other contractors also participated.
- Result: Lost
17/06/2026 11:06
3T INDUSTRY EQUIPMENT JOINT STOCK COMPANY lost the bidding for the Package No. 1: Supply of measuring and testing equipment (including 4 parts/lot) package, which was invited for bidding by the CÔNG TY TRUYỀN TẢI ĐIỆN 1 - CHI NHÁNH TỔNG CÔNG TY TRUYỀN TẢI ĐIỆN QUỐC GIA through an Open bidding as an independent entity. Five other contractors also participated.
- Result: Lost
16/06/2026 15:57
3T INDUSTRY EQUIPMENT JOINT STOCK COMPANY lost the bidding for the Procurement of spare valve materials for the first phase of 2026 package, which was invited for bidding by the PETROVIETNAM POWER NHON TRACH 2 JOINT STOCK COMPANY through an Open bidding as an independent entity. Eleven other contractors also participated.
- Result: Lost
16/06/2026 13:56
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder 3T INDUSTRY EQUIPMENT JOINT STOCK COMPANY participated in 141 package, of which 15 package was won, failed 106 packages, 15 packages with no results, 5 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor 3T INDUSTRY EQUIPMENT JOINT STOCK COMPANY is related to 36 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor 3T INDUSTRY EQUIPMENT JOINT STOCK COMPANY has a relationship with 19 the investor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor 3T INDUSTRY EQUIPMENT JOINT STOCK COMPANY competed with 218 contractors in 135 package, won 12 package, lost 105 package, 14 bidding package has no results, 4 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor 3T INDUSTRY EQUIPMENT JOINT STOCK COMPANY once entered into a partnership with 9 contractors in 13 package, won bid 2 package, lost 10 package, 0 bidding package has no results, 1 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor 3T INDUSTRY EQUIPMENT JOINT STOCK COMPANY participated in bidding in 16 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor 3T INDUSTRY EQUIPMENT JOINT STOCK COMPANY participated in bidding in 19 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 72,215 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
Add contractor