Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
History of active status changes
| Updated time | Active status | Lý do |
|---|---|---|
|
12:00 AM 12/20/2022 |
Pause |
Temporarily suspended due to overdue fees |
|
8:47 AM 12/20/2022 |
Active |
At the request of QTHT |
Data analysis results of DauThau.info software for contractors IDE JOINT STOCK COMPANY are as follows:
You need to Login or Sign up to view all informations.
- Participated in 91 bidding packages, of which 67 were won, 23 were lost, 0 are pending results, and 1 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 17.62% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 98.55% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Hải Phòng (29), Hà Nội (19), Khánh Hòa (17), TP.Hồ Chí Minh (12), Phú Thọ (1), Đồng Nai (1), Nationwide (1), Undefined (12)
- Provinces before the merger where the contractor has participated in bidding : Hải Phòng (24), Hà Nội (19), Khánh Hòa (16), Bà Rịa - Vũng Tàu (10), TP.Hồ Chí Minh (1), Undefined (21)
- Has relationships with 25 Bid Solicitors
- Has competed against 40 contractors in 44 bidding packages, won 21 packages, lost 22 packages, 0 are pending results, and 1 were canceled.
- Has collaborated with 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 0 bidding packages with 0 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 0 | 0% |
| Lower by 10% to 20% | 1 | 1.5% |
| Lower by 5% to 10% | 2 | 3% |
| Lower by 1% to 5% | 29 | 43.3% |
| Lower by 0% to 1% | 21 | 31.3% |
| 0% | 14 | 20.9% |
| Higher by 0% to 1% | 0 | 0% |
| Higher by 1% to 5% | 0 | 0% |
| Higher by 5% to 10% | 0 | 0% |
| Higher by 10% or more | 0 | 0% |
| Unknown | 0 | 0% |
| Total | 67 | 100% |
IDE JOINT STOCK COMPANY Won the bidding for the Repair and maintenance of Caterpillar C12 main engines for ships package, which was invited for bidding by the CÔNG TY TNHH MỘT THÀNH VIÊN 128 through an assign shorthand as an independent entity.
- Result: Won
24/12/2025 13:49
IDE JOINT STOCK COMPANY Won the bidding for the Package 3: Procurement of waterpillar parts spare parts package, which was invited for bidding by the Cục Xe máy - Vận tải/ Tổng cục Hậu cần - Kỹ thuật through an Open bidding as an independent entity. Two other contractors also participated.
- Result: Won
05/11/2025 18:00
IDE JOINT STOCK COMPANY Won the bidding for the Providing Caterpillar machine repair parts package, which was invited for bidding by the HAI LONG BUILDING AND REPAIRING SHIP ONE MEMBER LIMITED LIABILIITY COMPANY through an assign shorthand as an independent entity.
- Result: Won
24/10/2025 14:26
IDE JOINT STOCK COMPANY lost the bidding for the Bidding package MS-02: Procurement compressor compressor, air compressor and turbine protective equipment package, which was invited for bidding by the Quân chủng Hải quân through an Open bidding as an independent entity. One other contractors also participated.
- Result: Lost
16/10/2025 08:13
IDE JOINT STOCK COMPANY Won the bidding for the Repair of main engine 3508B and auxiliary engine C4.4 of ship TX52.25 package, which was invited for bidding by the HAI LONG BUILDING AND REPAIRING SHIP ONE MEMBER LIMITED LIABILIITY COMPANY through an assign shorthand as an independent entity.
- Result: Won
11/10/2025 17:13
IDE JOINT STOCK COMPANY Won the bidding for the Buying ship materials in 2025 package, which was invited for bidding by the Bộ Tư Lệnh Vùng Cảnh Sát Biển 3 through an Open bidding as an independent entity. Two other contractors also participated.
- Result: Won
26/09/2025 16:27
IDE JOINT STOCK COMPANY Won the bidding for the MS06-TTH: Shopping parts of Cummins, Caterpillar, Misubish package, which was invited for bidding by the Cục Kỹ thuật quân, binh chủng/Tổng cục HC-KT through an Competitive Offer as an independent entity. One other contractors also participated.
- Result: Won
25/09/2025 20:33
IDE JOINT STOCK COMPANY lost the bidding for the MS03-TTH: Shopping parts of Cummins, Caterpillar, Yamaha package, which was invited for bidding by the Cục Kỹ thuật quân, binh chủng/Tổng cục HC-KT through an Competitive Offer as an independent entity. One other contractors also participated.
- Result: Lost
23/09/2025 10:53
IDE JOINT STOCK COMPANY join for the Bidding package MS-02: Procurement compressor compressor, air compressor and turbine protective equipment package, which was invited for bidding by the Quân chủng Hải quân through an Open bidding as an independent entity. One other contractors also participated.
- Result: Tender opening completed
15/09/2025 08:17
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder IDE JOINT STOCK COMPANY participated in 91 package, of which 67 package was won, failed 23 packages, 0 packages with no results, 1 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor IDE JOINT STOCK COMPANY is related to 25 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor IDE JOINT STOCK COMPANY competed with 40 contractors in 44 package, won 21 package, lost 22 package, 0 bidding package has no results, 1 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor IDE JOINT STOCK COMPANY participated in bidding in 6 provinces/cities, 1 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor IDE JOINT STOCK COMPANY participated in bidding in 5 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 68,759 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects
Add contractor