Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
History of active status changes
| Updated time | Active status | Lý do |
|---|---|---|
|
8:46 AM 04/15/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
1:56 PM 04/16/2024 |
Active |
At the request of QTHT |
|
12:05 AM 01/31/2025 |
Pause |
Temporarily suspended due to overdue fees |
|
8:54 AM 02/03/2025 |
Active |
At the request of QTHT |
|
12:49 AM 04/01/2025 |
Pause |
Temporarily suspended due to overdue fees |
|
11:31 AM 04/17/2025 |
Active |
At the request of QTHT |
|
4:15 AM 04/01/2026 |
Pause |
Temporarily suspended due to overdue fees |
|
11:19 AM 05/21/2026 |
Active |
At the request of QTHT |
Data analysis results of DauThau.info software for contractors KLC CONSULTANCY AND CONSTRUCTION COMPANY LIMITED are as follows:
You need to Login or Sign up to view all informations.
- Participated in 159 bidding packages, of which 159 were won, 0 were lost, 0 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 67.45% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 99.25% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Thái Nguyên (141), Undefined (18)
- Provinces before the merger where the contractor has participated in bidding : Thái Nguyên (78), Bắc Kạn (24), Undefined (59)
- Has relationships with 14 Bid Solicitors
- Has relationships with 35 Bid Investors
- Has competed against 0 contractors in 159 bidding packages, won 159 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 103 bidding packages with 12 roles.
- Building organization name: Công ty TNHH KLC tư vấn và xây dựng
- Construction capacity certificate code: 00036852
- Issuing Authority: Sở Kế hoạch và Đầu tư tỉnh Thái Nguyên
- Field:
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: công trình Dân dụng, Công nghiệp; công trình Giao thông đường bộ, Hạ tầng kỹ thuật, Nông nghiệp và Phát triển nông thôn
⚬ Giám sát thi công xây dựng công trình: công trình Dân dụng, Công nghiệp, Giao thông đường bộ, Hạ tầng kỹ thuật, Nông nghiệp và Phát triển nông thôn
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 2 | 0% |
| Lower by 10% to 20% | 0 | |
| Lower by 5% to 10% | 4 | 0% |
| Lower by 1% to 5% | 3 | 0% |
| Lower by 0% to 1% | 13 | 0% |
| 0% | 137 | 0% |
| Higher by 0% to 1% | 0 | |
| Higher by 1% to 5% | 0 | |
| Higher by 5% to 10% | 0 | |
| Higher by 10% or more | 0 | |
| Unknown | 0 | |
| Total | 159 | 100% |
KLC CONSULTANCY AND CONSTRUCTION COMPANY LIMITED Won the bidding for the Consulting services for feasibility studies, economic analysis, and technical design reports for investment projects in construction. package, which was invited for bidding by the Sở Xây dựng tỉnh Thái Nguyên through an as an independent entity.
- Result: Won
26/08/2026 16:06
KLC CONSULTANCY AND CONSTRUCTION COMPANY LIMITED Won the bidding for the Survey, task assignment, and preparation of the technical and economic feasibility report for the project: Upgrading and extending the road connecting the Gieng Mat hamlet to the Dong Bon village in Tan Thanh commune. package, which was invited for bidding by the Ban Quản Lý Dự Án Xã Tân Thành through an as an independent entity.
- Result: Won
25/08/2026 17:55
KLC CONSULTANCY AND CONSTRUCTION COMPANY LIMITED Won the bidding for the Overseeing the technical survey and preparing the project's economic feasibility report: Repairing and upgrading the road from Món Thượng intersection to the Police Station. package, which was invited for bidding by the Ban Quản Lý Dự Án Xã Tân Thành through an as an independent entity.
- Result: Won
24/08/2026 21:50
KLC CONSULTANCY AND CONSTRUCTION COMPANY LIMITED Won the bidding for the Consulting package for verifying economic and technical reports on construction investment projects: Concrete road in Ba Dinh village, Quang Son commune package, which was invited for bidding by the Trung tâm dịch vụ tổng hợp xã Quang Sơn through an as an independent entity.
- Result: Won
14/08/2026 11:45
KLC CONSULTANCY AND CONSTRUCTION COMPANY LIMITED Won the bidding for the Consulting package for verifying economic and technical reports on construction investment projects: Underground overflow in Dong Mau village, Quang Son commune package, which was invited for bidding by the Trung tâm dịch vụ tổng hợp xã Quang Sơn through an as an independent entity.
- Result: Won
14/08/2026 11:45
KLC CONSULTANCY AND CONSTRUCTION COMPANY LIMITED Won the bidding for the Consulting services for technical and economic feasibility studies for construction projects: Repair of irrigation canals in the Nam Hung village, Tan Cuong commune. package, which was invited for bidding by the Phòng xây dựng nông nghiệp và môi trường xã Tân Cương through an as an independent entity.
- Result: Won
06/08/2026 16:54
KLC CONSULTANCY AND CONSTRUCTION COMPANY LIMITED Won the bidding for the Consultantcy on surveying, preparing finance and technical reports package, which was invited for bidding by the Ban Quản lý dự án phường Phổ Yên through an as an independent entity.
- Result: Won
30/07/2026 11:21
KLC CONSULTANCY AND CONSTRUCTION COMPANY LIMITED Won the bidding for the Advice on verification of economic and technical reports package, which was invited for bidding by the TRƯỜNG MẦM NON 19/5 TÂN LẬP through an as an independent entity.
- Result: Won
27/07/2026 11:04
KLC CONSULTANCY AND CONSTRUCTION COMPANY LIMITED Won the bidding for the Survey supervision consulting package, which was invited for bidding by the Ban Quản Lý Dự Án Xã Tân Thành through an as an independent entity.
- Result: Won
22/07/2026 15:10
KLC CONSULTANCY AND CONSTRUCTION COMPANY LIMITED Won the bidding for the Survey supervision consulting package, which was invited for bidding by the Ban Quản Lý Dự Án Xã Tân Thành through an as an independent entity.
- Result: Won
16/07/2026 10:26
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder KLC CONSULTANCY AND CONSTRUCTION COMPANY LIMITED participated in 159 package, of which 159 package was won, failed 0 packages, 0 packages with no results, 0 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor KLC CONSULTANCY AND CONSTRUCTION COMPANY LIMITED is related to 14 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor KLC CONSULTANCY AND CONSTRUCTION COMPANY LIMITED has a relationship with 36 the investor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor KLC CONSULTANCY AND CONSTRUCTION COMPANY LIMITED participated in bidding in 1 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor KLC CONSULTANCY AND CONSTRUCTION COMPANY LIMITED participated in bidding in 2 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 71,243 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
Add contractor