Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
History of active status changes
Data analysis results of DauThau.info software for contractors MACROCOM TECHNOLOGIES CORPORATION are as follows:
You need to Login or Sign up to view all informations.
- Participated in 46 bidding packages, of which 23 were won, 23 were lost, 0 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 94.52% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 97.7% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Đà Nẵng (10), Hà Nội (18), TP.Hồ Chí Minh (15), Undefined (17)
- Provinces before the merger where the contractor has participated in bidding : Đà Nẵng (8), Hà Nội (18), TP.Hồ Chí Minh (12), Undefined (18)
- Has relationships with 21 Bid Solicitors
- Has relationships with 5 Bid Investors
- Has competed against 16 contractors in 41 bidding packages, won 18 packages, lost 23 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 1 contractors in 5 bidding packages, won 5 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 0 | |
| Lower by 10% to 20% | 2 | 0% |
| Lower by 5% to 10% | 1 | 0% |
| Lower by 1% to 5% | 12 | 0% |
| Lower by 0% to 1% | 2 | 0% |
| 0% | 6 | 0% |
| Higher by 0% to 1% | 0 | |
| Higher by 1% to 5% | 0 | |
| Higher by 5% to 10% | 0 | |
| Higher by 10% or more | 0 | |
| Unknown | 0 | |
| Total | 23 | 100% |
MACROCOM TECHNOLOGIES CORPORATION Won the bidding for the Perform repair of nokia radio equipment and broken Nokia to serve the network package, which was invited for bidding by the TRUNG TÂM HẠ TẦNG MẠNG MIỀN BẮC– CHI NHÁNH TỔNG CÔNG TY HẠ TẦNG MẠNG through an as an independent entity. One other contractors also participated.
- Result: Won
14/08/2026 16:37
MACROCOM TECHNOLOGIES CORPORATION Won the bidding for the Hire ERICSSON RAN 3G equipment repair service in 2026 package, which was invited for bidding by the MOBIFONE HIGH TECHNOLOGY CENTER - BRANCH OF MOBIFONE CORPORATION through an as an independent entity. Two other contractors also participated.
- Result: Won
12/05/2026 08:56
MACROCOM TECHNOLOGIES CORPORATION lost the bidding for the Hire transmission network equipment repair services in 2026 package, which was invited for bidding by the MOBIFONE HIGH TECHNOLOGY CENTER - BRANCH OF MOBIFONE CORPORATION through an as an independent entity. Two other contractors also participated.
- Result: Lost
17/04/2026 10:22
MACROCOM TECHNOLOGIES CORPORATION lost the bidding for the Hire power equipment repair services in the Southern region in 2026 package, which was invited for bidding by the MOBIFONE HIGH TECHNOLOGY CENTER - BRANCH OF MOBIFONE CORPORATION through an as an independent entity. Two other contractors also participated.
- Result: Lost
13/04/2026 10:03
MACROCOM TECHNOLOGIES CORPORATION lost the bidding for the Repair faulty OLT-GPON supplies to serve information rescue in 2026 package, which was invited for bidding by the TRUNG TÂM HẠ TẦNG MẠNG MIỀN BẮC– CHI NHÁNH TỔNG CÔNG TY HẠ TẦNG MẠNG through an as an independent entity. Two other contractors also participated.
- Result: Lost
10/04/2026 09:01
MACROCOM TECHNOLOGIES CORPORATION Won the bidding for the Perform repair of broken Nokia radio equipment for network rescue package, which was invited for bidding by the TRUNG TÂM HẠ TẦNG MẠNG MIỀN BẮC– CHI NHÁNH TỔNG CÔNG TY HẠ TẦNG MẠNG through an as an independent entity. Two other contractors also participated.
- Result: Won
12/02/2026 15:58
MACROCOM TECHNOLOGIES CORPORATION Won the bidding for the Perform Nokia radio supplies and supplies to serve the Ceremony of September 2, the need to cover and rescue information in the area package, which was invited for bidding by the TRUNG TÂM HẠ TẦNG MẠNG MIỀN BẮC– CHI NHÁNH TỔNG CÔNG TY HẠ TẦNG MẠNG through an as an independent entity.
- Result: Won
21/08/2025 15:23
MACROCOM TECHNOLOGIES CORPORATION lost the bidding for the Huawei, ZTE and other equipment repair services in the South in 2025 package, which was invited for bidding by the MOBIFONE HIGH TECHNOLOGY CENTER - BRANCH OF MOBIFONE CORPORATION through an as an independent entity. Three other contractors also participated.
- Result: Lost
11/07/2025 10:10
MACROCOM TECHNOLOGIES CORPORATION Won the bidding for the Perform repair of nokia radio equipment and broken Nokia to serve the network package, which was invited for bidding by the TRUNG TÂM HẠ TẦNG MẠNG MIỀN BẮC– CHI NHÁNH TỔNG CÔNG TY HẠ TẦNG MẠNG through an as an independent entity. One other contractors also participated.
- Result: Won
10/06/2025 10:14
MACROCOM TECHNOLOGIES CORPORATION lost the bidding for the Perform broken Huawei radio equipment for the network package, which was invited for bidding by the TRUNG TÂM HẠ TẦNG MẠNG MIỀN BẮC– CHI NHÁNH TỔNG CÔNG TY HẠ TẦNG MẠNG through an as an independent entity. Three other contractors also participated.
- Result: Lost
25/05/2025 10:24
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder MACROCOM TECHNOLOGIES CORPORATION participated in 46 package, of which 23 package was won, failed 23 packages, 0 packages with no results, 0 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor MACROCOM TECHNOLOGIES CORPORATION is related to 21 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor MACROCOM TECHNOLOGIES CORPORATION has a relationship with 6 the investor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor MACROCOM TECHNOLOGIES CORPORATION competed with 16 contractors in 41 package, won 18 package, lost 23 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor MACROCOM TECHNOLOGIES CORPORATION once entered into a partnership with 1 contractors in 5 package, won bid 5 package, lost 0 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor MACROCOM TECHNOLOGIES CORPORATION participated in bidding in 3 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor MACROCOM TECHNOLOGIES CORPORATION participated in bidding in 3 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 71,208 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
Add contractor