Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
History of active status changes
| Updated time | Active status | Lý do |
|---|---|---|
|
6:00 PM 09/17/2022 |
Pause |
Temporarily suspended due to overdue fees |
|
4:37 PM 11/07/2023 |
Active |
At the request of QTHT |
|
11:30 PM 02/03/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
9:02 AM 02/05/2024 |
Active |
At the request of QTHT |
|
11:31 PM 03/12/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
9:42 AM 03/14/2024 |
Active |
At the request of QTHT |
|
12:33 AM 07/01/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
8:57 PM 10/15/2024 |
Active |
At the request of QTHT |
|
12:05 AM 01/16/2025 |
Pause |
Temporarily suspended due to overdue fees |
|
3:24 PM 01/18/2025 |
Active |
At the request of QTHT |
|
12:05 AM 03/26/2025 |
Pause |
Temporarily suspended due to overdue fees |
|
8:58 AM 03/27/2025 |
Active |
At the request of QTHT |
|
12:05 AM 03/29/2025 |
Pause |
Temporarily suspended due to overdue fees |
|
10:03 AM 04/03/2025 |
Active |
At the request of QTHT |
|
12:05 AM 04/19/2025 |
Pause |
Temporarily suspended due to overdue fees |
|
9:51 AM 04/19/2025 |
Active |
At the request of QTHT |
|
12:05 AM 05/09/2025 |
Pause |
Temporarily suspended due to overdue fees |
|
5:13 PM 05/11/2025 |
Active |
At the request of QTHT |
|
12:05 AM 07/05/2025 |
Pause |
Temporarily suspended due to overdue fees |
|
2:12 PM 07/14/2025 |
Active |
At the request of QTHT |
|
12:05 AM 09/19/2025 |
Pause |
Temporarily suspended due to overdue fees |
|
10:26 PM 09/22/2025 |
Active |
At the request of QTHT |
|
12:05 AM 11/21/2025 |
Pause |
Temporarily suspended due to overdue fees |
|
4:19 PM 12/15/2025 |
Active |
At the request of QTHT |
|
12:06 AM 03/31/2026 |
Pause |
Temporarily suspended due to overdue fees |
|
11:52 PM 03/31/2026 |
Active |
At the request of QTHT |
|
7:39 AM 04/01/2026 |
Pause |
Temporarily suspended due to overdue fees |
|
10:38 AM 04/02/2026 |
Active |
At the request of QTHT |
Data analysis results of DauThau.info software for contractors MINH DAT DEVICE AND TECHNOLOGY JOINT STOCK COMPANY are as follows:
You need to Login or Sign up to view all informations.
- Participated in 85 bidding packages, of which 35 were won, 47 were lost, 3 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 51.56% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 87.9% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Hải Phòng (28), Tuyên Quang (11), Phú Thọ (10), Hà Nội (6), Lâm Đồng (6), Thanh Hoá (4), Đắk Lắk (4), Cần Thơ (4), Đà Nẵng (3), Đồng Nai (3), TP.Hồ Chí Minh (2), Ninh Bình (1), Vĩnh Long (1), An Giang (1), Hà Tĩnh (1)
- Provinces before the merger where the contractor has participated in bidding : Hải Phòng (15), Tuyên Quang (11), Hòa Bình (6), Hà Nội (6), Thanh Hoá (4), Lâm Đồng (3), Phú Thọ (3), Đà Nẵng (2), Đắk Lắk (2), Bình Thuận (2), Cần Thơ (2), Bà Rịa - Vũng Tàu (1), Phú Yên (1), Ninh Bình (1), Quảng Nam (1), Bến Tre (1), Kiên Giang (1), Hà Tĩnh (1), TP.Hồ Chí Minh (1), Undefined (21)
- Has relationships with 31 Bid Solicitors
- Has relationships with 21 Bid Investors
- Has competed against 204 contractors in 74 bidding packages, won 24 packages, lost 47 packages, 3 are pending results, and 0 were canceled.
- Has collaborated with 3 contractors in 5 bidding packages, won 3 packages, lost 2 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 0 bidding packages with 0 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 8 | 22.9% |
| Lower by 10% to 20% | 9 | 25.7% |
| Lower by 5% to 10% | 9 | 25.7% |
| Lower by 1% to 5% | 4 | 11.4% |
| Lower by 0% to 1% | 4 | 11.4% |
| 0% | 1 | 2.9% |
| Higher by 0% to 1% | 0 | 0% |
| Higher by 1% to 5% | 0 | 0% |
| Higher by 5% to 10% | 0 | 0% |
| Higher by 10% or more | 0 | 0% |
| Unknown | 0 | 0% |
| Total | 35 | 100% |
MINH DAT DEVICE AND TECHNOLOGY JOINT STOCK COMPANY join for the Package 06.2026.NDCT: Supply of mechanical and electrical equipment and general equipment for regular repairs in 2026 - Phase 2 - Can Tho Thermal Power Company package, which was invited for bidding by the EVNGENCO2 Project Management Board - Branch of Power Generation 2- Joint Stock Company through an Open bidding as an independent entity. Three other contractors also participated.
18/08/2026 09:42
MINH DAT DEVICE AND TECHNOLOGY JOINT STOCK COMPANY join for the Tender package No 29MSHH-SXKD.DHD-2026: Supply of materials and electrical equipment for regular repair of equipment systems at Ham Thuan and Da Mi Hydropower Plants package, which was invited for bidding by the DA NHIM - HAM THUAN - DA MI HYDRO POWER JOINT STOCK COMPANY through an Open bidding as an independent entity. Eight other contractors also participated.
05/08/2026 09:25
MINH DAT DEVICE AND TECHNOLOGY JOINT STOCK COMPANY lost the bidding for the Package MB-06: Chlorine system valve and metal valve package, which was invited for bidding by the SOUTH BASIC CHEMICALS JOINT STOCK COMPANY through an Open bidding as an independent entity. Three other contractors also participated.
- Result: Lost
27/07/2026 18:57
MINH DAT DEVICE AND TECHNOLOGY JOINT STOCK COMPANY Won the bidding for the Package No. 25HH-SXKD.NS-2026: Supply of materials for maintenance and repair of control systems package, which was invited for bidding by the NGHI SƠN THERMAL POWER COMPANY through an Open bidding as an independent entity. Four other contractors also participated.
- Result: Won
27/07/2026 16:14
MINH DAT DEVICE AND TECHNOLOGY JOINT STOCK COMPANY Won the bidding for the Package 2: Provide mechanical equipment and equipment package, which was invited for bidding by the HAI PHONG THERMAL POWER JOINT STOCK COMPANY through an Open bidding as sub-joint of Liên danh TT-MĐ. Four other contractors also participated.
- Result: Won
17/07/2026 13:43
MINH DAT DEVICE AND TECHNOLOGY JOINT STOCK COMPANY Won the bidding for the Package 4. Supply of measuring equipment and supplies for regular repairs in the 4th phase of 2026 package, which was invited for bidding by the HAI PHONG THERMAL POWER JOINT STOCK COMPANY through an CGTTRG as an independent entity.
- Result: Won
16/07/2026 13:18
MINH DAT DEVICE AND TECHNOLOGY JOINT STOCK COMPANY join for the Package MB-06: Chlorine system valve and metal valve package, which was invited for bidding by the SOUTH BASIC CHEMICALS JOINT STOCK COMPANY through an Open bidding as an independent entity. Three other contractors also participated.
- Result: Tender opening completed
14/07/2026 11:01
MINH DAT DEVICE AND TECHNOLOGY JOINT STOCK COMPANY join for the Package 2: Provide mechanical equipment and equipment package, which was invited for bidding by the HAI PHONG THERMAL POWER JOINT STOCK COMPANY through an Open bidding as sub-joint of CÔNG TY CỔ PHẦN THIẾT BỊ VÀ CÔNG NGHỆ MINH ĐẠT . Four other contractors also participated.
- Result: Tender opening completed
06/07/2026 09:04
MINH DAT DEVICE AND TECHNOLOGY JOINT STOCK COMPANY Won the bidding for the Package No. 3. Supply of electrical equipment and materials for regular repair phase 3 package, which was invited for bidding by the HAI PHONG THERMAL POWER JOINT STOCK COMPANY through an Open bidding as an independent entity. One other contractors also participated.
- Result: Won
24/06/2026 08:43
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder MINH DAT DEVICE AND TECHNOLOGY JOINT STOCK COMPANY participated in 85 package, of which 35 package was won, failed 47 packages, 3 packages with no results, 0 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor MINH DAT DEVICE AND TECHNOLOGY JOINT STOCK COMPANY is related to 31 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor MINH DAT DEVICE AND TECHNOLOGY JOINT STOCK COMPANY has a relationship with 21 the investor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor MINH DAT DEVICE AND TECHNOLOGY JOINT STOCK COMPANY competed with 204 contractors in 74 package, won 24 package, lost 47 package, 3 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor MINH DAT DEVICE AND TECHNOLOGY JOINT STOCK COMPANY once entered into a partnership with 3 contractors in 5 package, won bid 3 package, lost 2 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor MINH DAT DEVICE AND TECHNOLOGY JOINT STOCK COMPANY participated in bidding in 15 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor MINH DAT DEVICE AND TECHNOLOGY JOINT STOCK COMPANY participated in bidding in 19 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 72,245 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
Add contractor